Information
-
Document No.
-
AREA:
-
Entity or Contractor:
- Site Mgt
- BGC
- BMD
- Redpath
- Hutchinson - Redpath
- Hutchinson - Anglo
- Maintech
- McNab
- Tamroc
- Arrow
- Other
-
Conducted on
-
Prepared by
-
Location
-
Weather
DETAILS OF INSPECTION
-
Road conditions:
-
Road Width:
-
Dump Berm Height:
-
Berm heights acceptable (1/2 size large tyre):
-
Excavation area (enough space):
-
Dump area: (enough space):
-
Delineators (every 50m):
-
Signage's (Call up sign, Keep left, Stop, etc):
-
Cycle time:
-
Haul Distance:
-
Further actions required:
Equipment Operating
-
Excavator
-
Dozer:
-
Rear Dump Truck or Moxy:
-
LV's
-
Grader
-
Water-cart:
-
Scraper:
-
Compactor:
-
Roller
-
Crane:
-
Other:
Equipment NOT operating:
-
Excavator
-
Dozer:
-
Rear Dump Truck or Moxy:
-
LV's
-
Grader
-
Water-cart:
-
Scraper:
-
Compactor:
-
Roller
-
Crane:
-
Other:
INSPECTION SIGN OFF:
-
Add photo if required:
-
MSA Inspector:
-
Contractor if applicable: