Title Page
-
Inspection Report
-
Company Name
-
Company Contact
-
Contact Number
-
Email
-
Address
-
Conducted on
-
Prepared by
Site Contact - Owner/tenant
-
Name
-
Contact Number
-
Email
Inspection Report
-
What area of the house is being inspected?
- Roof
- Internal Linings
- Bathroom
- External Cladding
- Fence
Bathroom Removal Checklist
External Cladding Checklist
Asbestos Fence Removal Checklist
Internal ACM Removal Checklist
Roof Inspection Checklist
-
Will the roofer consider doing the removal in 2 stages?
-
Roof Characteristics - Select Multiple
- High Set
- Low Set
- Gable
- Hip & valley
- Painted
- Super6
- Super12
- High Pitch
- Low Pitch
-
Site Photos
-
Insulation Type
- No Insulation
- Sarking
- Batts
- Cellulose
- Other
-
Add media
-
Access for tipper
-
Access For Scaffold if needed
-
Water source
-
-
Does the client require us to remove the asbestos vent pipe down to the iron collar?
-
What is the requested action from the client?
-
Are there any permanent fixtures on the roof such as solar panels, solar hot water, satellite dishes etc?
-
Has the client/roofer/owner arranged to have these disconnected and removed prior to the roof removal?
-
Low Power Lines
-
Will these prevent access for machinery?<br>(Tipper, Skip truck, Scissor lifts, crane etc)
-
Is the site in close proximity to public areas?<br>(Schools, Parks, Shops etc)
-
Add media
-
Air Monitoring may be required by a hygienist.
-
Asbestos Gutters
-
Does the client require us to remove them?