Title Page
-
Conducted on
-
Prepared by
-
Location
Risk Management Documentation
-
Which members of EA staff are on site?
-
Is the work being carried out as per risk management documentation available on site?
-
Have site staff/visitors been briefed and can they describe risk control measures identified for the work ?
-
Site Staff have access to and use START SMART App (Plant assessment, DRA, Change of Risk forms).
-
Site staff are familiar with EOIs relevant to the work activity being undertaken
Services
-
Standard of precautions for dealing with Overhead Services
-
Standard of precautions for dealing with Underground Services
Services
-
Welfare facilities are as identified in the risk management documentation and responsibility for maintenance is in place.
-
Welfare facilities are appropriate, clean and tidy.
-
First Aid equipment is available, complete and in date
Environment & waste management
-
Environmental risks have been identified and appropriate control measures are in place and understood.
-
FB&G/Natural England/NEAS have been consulted, and work is being carried out in accordance with advice given.
-
Correct waste management (handling, storage, transfer & disposal) and use of associated paperwork (waste transfer/ consignment notes). The Waste Plan is up to date and available.
-
Spill kits are suitable for the size of plant on site / activity being undertaken. They are fully stocked (including suitable PPE) and located close to where they may be needed.
-
Refuelling is taking place in accordance with OIs. Fuels and chemicals are stored correctly on site.
-
‘Clean, Check, Dry’ is being adhered to and biosecurity measures are in place to prevent spread of invasive species to site, or off site.
-
Staff are aware of Environmental Learning from Experience Notices (ELENs). Relevant latest ones are displayed on site.
-
Environmental enhancement opportunities on site have been identified and taken forward
General
-
Suitability / condition of access and egress for the work site
-
Site ‘house-keeping’/ general tidiness / signing / warning public and others.
-
Suitability of material storage – sited to promote minimal manual handling
-
Suitability of fuel storage and distribution (containers and bunds)
-
Positive behaviours, near misses and incidents have been recognised, reported and learning shared
Plant, tools & equipment
-
Plant and equipment used on site is as detailed in the risk management documentation / Fleet Identification System (FiS).
-
Plant assessment checks have been completed prior to work starting.
-
Evidence the ‘Common Assured Standard’ for plant working near water has been applied and that appropriate controls are in place.
-
Effective segregation of works from public and livestock. i.e. a People Plant Co-Ordination plan is in place.Effective segregation of works from public and livestock. i.e. a People Plant Co-Ordination plan is in place.
-
Reactec Havwear system is in place for use of vibratory tools on site (control of HAVS exposure).
-
Awareness of LOLER & winching procedures & the current colour code for lifting & winching equipment.
Clothing and PPE
-
Clothing and PPE is appropriate for the work being carried out.
-
Clothing and PPE is consistent with our corporate image and is acceptable condition.
Additional comments and recommendations
-
Add media
-
Add signature