Title Page

  • Conducted on

  • Prepared by

  • Location

Risk Management Documentation

  • Which members of EA staff are on site?

  • Is the work being carried out as per risk management documentation available on site?

  • Have site staff/visitors been briefed and can they describe risk control measures identified for the work ?

  • Site Staff have access to and use START SMART App (Plant assessment, DRA, Change of Risk forms).

  • Site staff are familiar with EOIs relevant to the work activity being undertaken

Services

  • Standard of precautions for dealing with Overhead Services

  • Standard of precautions for dealing with Underground Services

Services

  • Welfare facilities are as identified in the risk management documentation and responsibility for maintenance is in place.

  • Welfare facilities are appropriate, clean and tidy.

  • First Aid equipment is available, complete and in date

Environment & waste management

  • Environmental risks have been identified and appropriate control measures are in place and understood.

  • FB&G/Natural England/NEAS have been consulted, and work is being carried out in accordance with advice given.

  • Correct waste management (handling, storage, transfer & disposal) and use of associated paperwork (waste transfer/ consignment notes). The Waste Plan is up to date and available.

  • Spill kits are suitable for the size of plant on site / activity being undertaken. They are fully stocked (including suitable PPE) and located close to where they may be needed.

  • Refuelling is taking place in accordance with OIs. Fuels and chemicals are stored correctly on site.

  • ‘Clean, Check, Dry’ is being adhered to and biosecurity measures are in place to prevent spread of invasive species to site, or off site.

  • Staff are aware of Environmental Learning from Experience Notices (ELENs). Relevant latest ones are displayed on site.

  • Environmental enhancement opportunities on site have been identified and taken forward

General

  • Suitability / condition of access and egress for the work site

  • Site ‘house-keeping’/ general tidiness / signing / warning public and others.

  • Suitability of material storage – sited to promote minimal manual handling

  • Suitability of fuel storage and distribution (containers and bunds)

  • Positive behaviours, near misses and incidents have been recognised, reported and learning shared

Plant, tools & equipment

  • Plant and equipment used on site is as detailed in the risk management documentation / Fleet Identification System (FiS).

  • Plant assessment checks have been completed prior to work starting.

  • Evidence the ‘Common Assured Standard’ for plant working near water has been applied and that appropriate controls are in place.

  • Effective segregation of works from public and livestock. i.e. a People Plant Co-Ordination plan is in place.Effective segregation of works from public and livestock. i.e. a People Plant Co-Ordination plan is in place.

  • Reactec Havwear system is in place for use of vibratory tools on site (control of HAVS exposure).

  • Awareness of LOLER & winching procedures & the current colour code for lifting & winching equipment.

Clothing and PPE

  • Clothing and PPE is appropriate for the work being carried out.

  • Clothing and PPE is consistent with our corporate image and is acceptable condition.

Additional comments and recommendations

  • Add media

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.