Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Findings should indicate: Complies / Rectified on site / Non Conforming ( A Hazard report to be raised in Qpulse -number to be recorded) / N/A (Not applicable). All finding should be accompanied with a brief summary.

  • Team / Area Audited

  • Select date

  • Number of items to be rectified

  • Number of Hazards Reports to be raised in Qpulse as a result of audit findings

  • What Actions from Previous Audits still require attention

  • 1

  • 2

  • 3

  • 4

  • 5

RISK ASSESMENT

  • Has an Electrical pre-start assessment and risk assessment been completed PRIOR to commencing work

  • Has the Electrical assessment been consulted amongst the team, and an induction of all persons on site been completed

  • Risks assessed as medium or low before work commences, demonstrates ALARP (as low as reasonable practicable)

  • Has the risk assessment considered all risks related to injury of persons as well as property damage

  • Have conditions onsite changed since the initial risk assessment

  • Risk controls are monitored to make sure they have been implemented as intended and are adequate

  • If permits have been issued, is there a job plan, work instructions, or an electrical wrap

  • A permit conditions being met

Equipment

  • Only non conducting ladders to be used on electrical work ( No Aluminium) -have fibreglass ladders been inspected within the last six months ( or as required by the construction site criteria)

  • For boom lift operators <br>, do they have a license to operate a elevated work platform

  • Has a pre start inspection been conducted on the elevated work platform ( EWP) and has a risk assessment been conducted for the use of the plant

  • Has any faulty, damaged or unserviceable electrical equipment not in use is tagged out with a "caution out of service tag" giving the details of the fault or problem, and has a suitable lock out enclosure or similar been applied

  • I lighting conditions on the worksite poor? Does the risk assessment indicate low light conditions and has appropriate task lighting been implemented

  • Insulated mats are to be of the correct rating for interior surfaces (3mm class A) for exterior (6mm class B) and free from contaminates, does the risk assessment identify exposure to live parts

  • If working near exposed live parts are busbar mats (class A) used to provide a barrier between the worker and live parts

  • Electrical equipment is labelled to indicate the day it is due for testing

  • If scaffolding is used has it been certified by a licensed scaffolder (over 4 m) and has it been a erected no closer than 3 m to the electrical parts

COMPETANCE

  • Are all persons carrying out electrical work current holders of an electrical work license or a restricted electrical work license and have current CPR (12 months) and LVR (12 months)

  • High Voltage "authorise persons" information maintained in the license register MLS and up to date?

  • Has a HV access permit been issued? Has an authorised HV access sheet been completed? (note that HV audits are to be conducted by a specialist)

  • Person designing the Cathodic protection systems must be either an electrical engineer or a licensed electrical worker. Both must have a qualification and/or proven experience in Cathodic protection installation and design

  • For generators - operators and observer must have a generator connection disconnection competency based training record

  • Are electrical apprentices or trainees exposed to live electrical parts, and is the individual aware of what live work is deemed to be

TESTING

  • Has the equipment or into structure and which electrical work has been performed or installed, in tested to ensure that it is electrically safe, and a record of the test been entered into the electrical wrap

  • Has a certificate of test been issued

  • Portable electrical equipment is electrical integrity tested in accordance with standard AS3760, and tagged

  • Availability and currency of electrical schematics drawings for the plant

  • Safety equipment and testing instruments shall be visually inspected before use. Has the equipment been calibrated and tagged with in the last six months or on a register

  • Site logbooks updated with record of calibration, date and time of attendance and works undertaken

  • Records of instrument calibrations are entered on the job plan and transferred to the asset log in trim

SAFETY OBSERVER

  • Does the risk assessment require the appointment of a safety observer during the active electrical works

  • Is the safety observer caring and any other work function that compromises their role as a safety observer

  • Is the safety observer within 500 mm of the expose life part?

  • The safety observer shall communicate effectively with the worker or workers. Specialist equipment may be necessary in situations where there is a barrier to communication. Has this communication method in defined and recorded, and is there an emergency plan?

  • When electrical works at Height is required using an EWP, where is the electrical safety observer situated? Electrical safety code of practice does not permit the safety observer to be in the basket of the EWP. Does the safety observer have a competency operate the EWP?

  • Are all persons assisting (observer) in electrical work trained and competent in rescue and resuscitation and a working knowledge of electrical work? Current CPR (six months) and LVR (six months)?

  • Has the risk assessment been conducted to identify exclusion zones for access to live electrical (as per AS4836 section 2.4) (i.e.; within 3 m for competent electrical workers, within 500 mm or competent electrical workers and appropriate PPE

ISOLATION

  • Is a competent person available to conduct an electrical isolation. The person should;<br>- Have completed the current LOTO training course<br>- Have enough technical knowledge and experience to do the work<br>- has been approved by the person in control of the equipment

  • A sufficient safety tag and lockout device is available for isolating electrical equipment

  • Has the isolation device for electrical equipment and look to prevent the device from being accidentally operated

  • Has a LOTO isolation register been completed for the isolation

  • Does the isolation register reflect positive isolation, and has total isolation been achieved by the process?

  • Has an "out of service tag", "personal danger tag", been attached to the points that have been isolated?

RECORDS

  • Has the electrical WRAP records being recorded in TRIM

  • Have hazard reports been raised in QPULSE as a result of nonconforming findings

  • Have Electrical test records (certificates of test) been maintained in TRIM

  • Have safety interactions or observations been conducted on the team

  • The register plan and equipment is current and available from the area Coordinator. Are asset tags in place on the planet and equipment

CONTRACTED WORKERS

  • Has the contract been inducted to site.

  • Are workshop drawings and schematics available

  • Has the contractor provided the certificates of currency and electrical license details (preferred suppliers list).

  • Has the contractor provided evidence of licenses for other works apart from electrical work i.e. confined space ticket (if applicable), work from Heights training, etc

  • Had contractor SWMS/work method been reviewed and approved for electrical works

  • Have the contractors been approved for electrical works on site, and obtained a permit to work.

  • Has a task observation been conducted on the contractor to ensure they are complying with the SWMS/work method

  • Has an electrical testing methodology been provided, and a test being conducted, and records being maintained.

  • Is there a certificate of test for electrical work conducted?

  • Have a new plant "as built" or "as modified" electrical drawings be submitted, reviewed and accepted as accurate by QUU engineers.

Hazard identification, risk assessment and control (HIRAC) and corrective action is preventative actions (CAPA)

  • Are there any outstanding hazards to be addressed?

  • 1.

  • 2.

  • 3.

  • 4.

  • 5.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.