Information
-
Job #:
-
Jobe Name:
-
Conducted on
-
Prepared by
-
Location
-
Document No.
Final Walkthrough Inspection
-
All prepping, caulking completed to correct Prep Level
-
Color placement matches Color Selection Form
-
All surfaces have good coverage (no Holidays)
-
Clean, straight cut lines
-
Clean areas - no drips on floors, counter tops, trim, etc.
-
All paint cans labeled with room and surface
-
All furniture and items returned to proper place
-
Windows cleaned, no paint splatter, drips or lap lines
-
Shop area cleaned, sink and toilet that were used cleaned
-
Drops shaken into trash, not street or yard
-
All switch plates, plugs, door hardware, etc. reinstalled
-
Entire work area is cleaned and vacuumed
-
All touch ups completed
-
All masking removed, especially high areas
-
All windows that were painted are functioning
-
Path from house to van is clean, no paint chips, bits of tape or paper, etc.
-
Double check that no razor blades were left lying around
-
All tools, ladders, equipment, etc. returned to vans
-
Thermostat returned to normal temperature
-
Entire crew walked job one last time to double check all of above
-
Collect any outstanding payments