Information
-
Prepared by
-
Conducted on
5:30 AM - ARRIVAL SECTION
-
Clocked-in?
-
Turn on lights in restaurant, except for menu boards?
-
Complete safety check - playground, bathrooms, doors, drive-thru window.
-
Switch "store occupied" button to occupied?
-
Verify Opening Team Has Arrived!
-
Check the temperatures of the following refrigerators.
-
Walk-in Freezer (If at risk, what have you doe to fix the situation?)
-
Walk-in Refrigerator (If at risk, what have you doe to fix the situation?)
-
Back Lo-boy (If at risk, what have you doe to fix the situation?)
-
Thaw Cabinet (If at risk, what have you doe to fix the situation?)
-
Thaw Cabinet 2 (If at risk, what have you doe to fix the situation?)
-
Breading Table (If at risk, what have you doe to fix the situation?)
-
Boards Salad Lo-boy (If at risk, what have you doe to fix the situation?)
-
Boards Lo-boy (If at risk, what have you doe to fix the situation?)
-
Boards LEAN Rail station (when turned on. - If out of temperature, please list what you have done to fix the situation.)
-
LEAN Work Table (If at risk, what have you doe to fix the situation?)
-
Fry Fridge (If at risk, what have you doe to fix the situation?)
-
Front Counter Lo-boy (If at risk, what have you doe to fix the situation?)
-
Drive-thru Lo-boy (If at risk, what have you doe to fix the situation?)
-
Milk Shake Base Dispenser (If at risk, what have you doe to fix the situation?)
-
Count change fund and tills. Please list any discrepancies from previous count.
-
Make sure cashiers are opened for day.
-
Turn on all light switches and building signage and open doors. (Snow/Ice removal if needed.)
-
Turn the T.V. PowerPoint presentation on.
6:00 AM
-
Check for Caering for the day.
-
Give towels to team.
-
Complete the food safety check before 7am.
-
Check the following areas for security and cleanliness. Please make note for any area that there are concerns.
-
Bathrooms
-
Playground
-
Dining Room
-
Windows
-
Chairs / Tables / Flowers
-
Front Counter / Drive Thru / Stocking
-
Counters and Condiment Counter
-
Kitchen
-
Are you wearing security alarm chain?
-
Set up game plan for morning/lunch shift.
7:00 AM - 2:00 PM
-
Complete morning paperwork.
-
Enter waste from previous day into register system.
-
Parking Lot Check (when light)
-
Begin breaks (7:00 AM)
-
Complete eRQA per daily guidelines.
-
Place change order before 10:30 AM (Monday only).
-
Have team complete stocking lists before lunch-time.
11:00 AM
-
Complete 2nd Food Safety / Temp Checklist (before lunch rush begins)
-
NO BREAKS BETWEEN 11:30 AM AND 1:30 PM
1:15 PM
-
Begin stocking checklists for front counter (as able).
-
Check dining room and bathrooms for transition. Let your team members know what needs to be done.
-
Place produce order (Tuesday, Thursday, Saturday)
-
Speak with incoming shift manager to discuss items that are on-going, or are being worked on. (Change fund, breaks, etc...)
-
Manager Signature
-
Complete A.M. Manager Checklist and email.
-
Complete Shift Report and email.