Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Was the paperwork signed off?
-
Have all of the serial numbers been recorded?
-
Motor lever push test?
-
Is the motor lever bolt tight?
-
Are the flange shaft bearing set screws positioned correctly?
-
Was the unit tested?
-
Is the down limit switch installed?
-
Is the brake limit switch installed?
-
Does each limit switch have yellow marks?
-
Is there a yellow mark on the spring lever bolt?
-
Are there yellow marks on the upper lever bolts?
-
Does the gate have a "tested by" sticker signed?
-
Does the gate have the correct number of springs?
-
Are the wires the correct length?
-
Is the controller included?
-
Does the controller have 3 triacs?
-
Is the plastic controller cover included?
-
Are the mounting bolts included?
-
Are the capacitors included? (a 5 and an 8 MF for each unit)
-
Is anything else ordered with the gate that needs to be packaged?
-
Is anything else ordered with the gate that should be installed?
-
Is the overall fit and finish up to Magnetic Quality?