Passive Fire Stopping
-
Location
-
Area of work within the location
-
Conducted on
-
Audited by
-
Contractors on-site
Project Management
-
Site Supervisor
-
Site Manager
-
Operatives on site
Scope of Work
-
Description or works being carried out
- Installation of Loft Hatches
- Installation of Ablative Batt
- Installation of Fire Curtains
- Ablative Batt & Intumescent mastic seals
-
Images of work area
Welfare
-
What type of welfare is in use
-
Rest Area
-
Hot & Cold running water
-
Fresh Drinking water
-
Toilets
Fire & First Aid
-
Fire extinguishers on site
-
Extinguishers in date
-
Means of raising alarm
-
First Aid kit present
-
First aid kit fully stocked
Segregation & protection from tenants/the public
-
How is the segregation set up
-
Is there sufficient floor protection in place
-
Is all waste removed from the area
Access and Work area
-
Type of Access to the work area
-
Condition of access equipment
-
Does the work area have sufficient lighting in place
-
Are crawling boards in place
-
Are materials being stored in the work area
-
Are materials away from all doorways and escape routes
PPE/RPE
-
Do all operatives have the correct PPE
-
Are the correct overalls being worn
-
What RPE is being used
COSHH
-
List all items of COSHH on site (To be checked against the COSHH database)
SIGN OFF
-
Person carrying out audit
-
Signature
-
Date