Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Information
-
Store Name
-
Store Number
-
Engineer Name
-
Date & Time of Install
-
Please can you complete this document as part of the sign off procedure along with the physical paperwork and take as many photos as possible to support your work. Once completed, please email a copy to Tom.Tsenov@alsuk.com and Ryan.Steel@alsuk.com before 7am.
Is the cash tube functional before works commence?
-
YES or NO
-
Picture to show?
-
Signature:
Has The Power In The Base Of The Wall Been Connected and All The Cradles Operational?
-
YES or NO<br>
-
Picture To Show
Have You Applied The Stickers As Per The Illustration In The Job Pack?
-
YES or NO
-
Image To Show
Have You Installed The Vents On The Bottom and Middle Compartments of the PC Cabinet?
-
YES or NO
-
Image To Show
Have You Installed The Leaflet Holders As Per Project Manager's Instruction?
-
YES or NO
-
Image To Show
Is The Cash Tube System Working? *IF NOT PLEASE ESCALATE TO ALS BEFORE LEAVING SITE*
-
YES or NO
Have You Handed The Cabinet Key and Allen Key To The Main Contractor?
-
YES or NO
-
If Needed...
Have You Connected The Cradles To The Provided Power Socket By Adopting The Daisy Chain (Cradle Cables to PSU's, PSU's to power socket via the kettle lead)
-
YES or NO
-
Photo
Are all cradles operational?
-
YES or NO
-
Photo to show
Have you connected the monitors?
-
YES or NO
-
Photo To Show
Are the monitors operational (check the touch screen)?
-
Photo to show
-
YES or NO
Have you handed over the wall to the site manager with a full guidance of the connections?
-
YES or NO
-
Site Manager's Signature
Are there any visual damages to the wall (check front, back and sides) and are there any issues?
-
YES or NO
-
Site Manager's Signature
Have the pins inside the cradle been checked with zebra engineer?
-
YES or NO
Have the monitor and cables been checked alongside zebra engineer?
-
YES or NO
Has the monitor been configured as per the 'What Good Looks Like' document?
-
Yes or No
Has the physical handover to Zebra been made?
-
YES or NO
-
Signature From Zebra Engineer
Have you communicated the installation with Zebra engineer and is everything ok?
-
YES or NO
Is the cash tube still functional after works are complete?
-
YES or NO
-
Picture to show
-
Signature:
Unit Photos
-
Can You Please Take Photos of the Completed Unit as a Whole.
Any Outstanding Snags...
-
YES or NO
-
What Is The Snag? (If Applicable)
-
Photo Of Snag (If Applicable)