Store/Project Details
-
Store Number - Store Name
-
Prepared by
-
Project Name
-
Location
-
Take image of front of store
Electrical Survey
Scope of Works
-
Please take a photo of the "To Be" drawing
-
Is the scope of works available?
-
Please give reason
-
Can the Electrical Survey be carried out without a scope of works?
-
Please give reason
-
Please take photos of distribution QR /Bar Codes and any relevant photos
Distribution Boards
-
Please locate and identify distribution board/s to be utilised on this project, using the QR/Barcodes available.
-
What is the make (manufacture's name) of the distribution board?
-
Please take a clear, in focus and close up photo of the whole front of this distribution board
-
What is this distribution board's name/reference?
-
Please take a clear, in focus and close up photo of this distribution board's name/reference
-
Please take clear, in focus and close up individual photos of the QR Code and/or Barcode on the front of this distribution board
-
Please take a clear, in focus and close up photo of the Circuit Protection Devices used within distribution board
-
Please describe in detail the location within the store of this distribution board
-
Please take a photo of this distribution board's location within the store
-
Is there more than one distribution board to be utilised?
-
-
What is the make (manufacture's name) of the distribution board?
-
Please take a clear, in focus and close up photo of the whole front of this distribution board
-
What is this distribution board's name/reference?
-
Please take a clear, in focus and close up photo of this distribution board's name/reference
-
Please take clear, in focus and close up individual photos of the QR Code and/or Barcode on the front of this distribution board
-
Please take a clear, in focus and close up photo of the Circuit Protection Devices used within distribution board
-
Please describe in detail the location within the store of this distribution board
-
Please take a photo of this distribution board's location within the store
Materials
-
Identify cable routes with existing and new containment if required
-
Materials and quantities required?
-
Mark up cable runs on drawing and take photo of drawing