Title Page

  • Conducted on

  • Prepared by

  • Location
  • Please take sample Image of all equipment for each item as reference.
    Provide List and detail of any failed items.

    Nearing end of expected life cycle. - Replace within 1 to 2 years
    1 Critical - Extremely worn or damaged - Replace within the next month - 1 year

  • Site Address or Site Name

  • Is all areas of this site accessible for inspection

Fire Services - Hydrants

  • Does the Site/Location have Fire a Fire Hydrant System?

  • What date was the last service/Inspection?

  • Is the Block Plan Installed, To standard and Legible?

  • What is the condition of the Condition of Hydrant Pump system?

  • What is the condition of the Hydrant Booster connection?

  • Are all Hydrant Connections points in good condition, with signage and free of obstruction?

Fire Hose Reels

  • Does the site have Fire hose reels?

  • What is the condition of the Internal fire hose reels?

  • Are any Hose Reels located Externally?

  • What is the condition of the externally Located Hose Reels?

Fire Blankets

  • Are their any Fire blankets installed?

  • What are the condition of the Fire Blankets?

Smoke Detection Systems

  • Is there a smoke detection system installed? <br>If so, provide adequate details and images.

  • What is the condition of the Smoke Detection systems?

Occupant Warning Systems

  • Is an EWIS or BOWS or other system installed? <br>please provide image and detail of system

  • What is condition of the System?

Fire Sprinkler Systems

  • Is a Fire Sprinkler system installed? <br>Please provide adequate detail and images

  • What is the condition of the system?

  • What is the condition of the Sprinkler Pump and associated equipment? Provide detail on system installed

  • What is the condition of the sprinkler piping?

  • When is the 20 year test due?

  • Is there any Valve sets? <br>If so how many?

  • When was the last 3 Yearly Overhaul?

Fire Doors

  • What is the condition of the fire doors?

  • Is their adequate signage on all doors?

  • Is the door hardware operable and appropriate for the installation?

  • Do any of the doors have a potential to contain Asbestos?

Emergency Lighting

  • what is the condition of the emergency lighting system?

  • Does the system have an test switch installed?

  • Is the lighting system adequate and to standard?

Fire Extinguishers

  • Does the site have any Fire Extinguishers? <br>if so please advise numbers and types.

  • What is the General condition of all Extinguishers?

  • When was the date of the last test on the extinguishers?

  • Are all Extinguisher Signage installed and correct?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.