Information
-
Inspection Address
-
Date and Time:
-
Building Permit No.
Asset Surveillance Final Inspection (Section 73)
Asset Surveillance Final Inspection (Section 73)
-
Date and time of inspection
-
Inspected by
Damages listed in pre works inspection (Section 80)
-
Damages previously listed:
-
Inspected by:
- Ian Lochhead
- Tino Pegoraro
- Bob Larkin
- Nathan Hasankolli
- Alex Stewart
- Other
-
Inspected by:
-
Inspected on:
New observations
-
There is no new damage to report
-
✅✅✅ No further damages to report ✅✅✅
-
There is new damages to the assets which require repair.
-
❗❗❗❗ New damages to assets. Send a Letter to repair all extra damages listed below ❗❗❗❗
-
There is damage to crossing/s at the property
-
There are multiple damaged crossings at the property
-
There is damage to Concrete Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at crossing no. 1:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at crossing no. 1:
-
There is damage to Paved Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing No.1:
-
There is damage to Pram Crossing No. 1
-
There are cracked Pram Crossing sections
-
Sections cracked at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped Sections of Pram Crossing
-
Sections chipped at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of pram crossing
-
Sections depressed at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing No.1:
-
There is damage to Concrete Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing no. 2:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at concrete crossing no. 2:
-
There is damage to Pram Crossing No. 2
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing No 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing No 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Sections depressed at Pram Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing No. 2:
-
There is damage to Paved Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to Paved Crossing No. 2:
-
There is damage to Concrete Crossing
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at crossing:
-
There is damage to Paved Crossing
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing:
-
There is damage to Pram Crossing
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Laybacks depressed at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing:
-
There is damaged footpath/s in front of the property
-
The damaged footpath is concrete
-
There are damaged 100mm thick footpath bays
-
There are cracked 100mm bays
-
100mm thick concrete footpath bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped 100mm bays
-
100mm thick concrete footpath bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted 100mm bays
-
100mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed 100mm bays
-
100mm thick concrete footpath bays depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are further damages to 100mm bays
-
Irregular damage to 100mm concrete footpath bays:
-
There are damaged 125mm thick concrete footpath bays
-
There are cracked 125mm bays
-
125mm thick concrete footpath bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped 125mm bays
-
125mm thick concrete footpath bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted 125mm bays
-
125mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed 125mm bays
-
125mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to 125mm bays
-
Irregular damage to 125mm concrete footpath bays:
-
The damaged footpath is a shared usage asphalt path
-
Damage to the asphalt shared usage path:
-
There is damage to off street parking in front of the property
-
Off street parking bays
-
There are cracked bays in the off street parking
-
Off street parking bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped bays in off street parking
-
Off street parking bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted bays within off street parking
-
Off street parking bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed bays within off street parking
-
Off street parking bays depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are off street parking bays with other irregular damage
-
Irregular damage to off street parking bays:
-
Damage to Concrete rollover kerb within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb within off street parking:
-
Damage to Concrete kerb and channel within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete kerb and channel cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete kerb and channel chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete kerb and channel lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete kerb and channel depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel within off street parking:
-
Damage to Concrete plinth within off street parking
-
There are cracked sections of concrete plinth
-
Sections of concrete plinth cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete plinth
-
Sections of concrete plinth chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of concrete plinth
-
Sections of concrete plinth lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of concrete plinth
-
Sections of concrete plinth depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of concrete plinth with other types of damage
-
Irregular damage to concrete plinth within off street parking:
-
There is damage to kerbing in front of the property
-
Concrete kerb and channel
-
There are cracked sections of concrete kerb and channel
-
Cracked sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete kerb and channel
-
Chipped sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Lifted sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Depressed sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel x
-
Concrete rollover kerb
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb:
-
There is significant damage to the nature strip
-
The nature strip is in need of levelling, top soil and seed.
-
Nature strip requires levelling, top soil and seed.🚫🚫🚫
-
There is damage to the nature strip, requiring further attention than soil and seeding.
-
Damage to the nature strip:
-
There have been illegal alterations to the nature strip
-
Illegal crossing extension
-
Material used and approximate width of illegal crossing extension:
-
Illegal erection of Basketball Ring or other permanent structure
-
Illegal structure in the nature strip:
-
Illegal planting in a nature strip
-
Illegal planting in the nature strip:
-
Other type of illegal alteration to nature strip
-
Description of irregular and illegal alterations to a nature strip:
-
There are damaged pits in front of the property.
-
Side Entry Pit/s
-
Number of damaged Side Entry Pits:
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to the pit surround
-
1 x side entry pit surround
-
damaged by:
-
Damage to pit lid
-
1 x side entry pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Damage to lintel
-
1 x side entry pit lintel
-
damaged by:
-
Damage to multiple side entry pits:
-
Junction Pit/s
-
Number of damaged Junction Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple junction pits:
-
Damage to the pit surround
-
1 x junction pit surround
-
damaged by
-
Damage to pit lid
-
1 x junction pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by
-
Telephone Pit
-
Number of damaged Telephone Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple telephone pits:
-
Damage to the pit surround
-
1 x telephone pit surround
-
damaged by:
-
Damage to pit lid
-
1 x telephone pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Electricity Pit
-
Number of damaged Electricity Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple electricity pits:
-
Damage to the pit surround
-
1 x electricity pit surround
-
damaged by:
-
Damage to pit lid
-
1 x electricity pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Sewer Pit
-
Number of damaged Sewer Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple sewer pits:
-
1 x sewer pit surround
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
1x sewer pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Unclassified Pit
-
Number of damaged Unclassified Pits:
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple unclassified pits:
-
1 x unclassified pit surround
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
1 x unclassified pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
There are damaged drains in front of the property
-
The footpath edge or nature strip contains a damaged Concrete Spoon Drain
-
Damage to the concrete spoon drain:
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
There is damage to a constructed Swale drain that fronts the property
-
Damage to a constructed Swale drain:
- cracked
- chipped
- raised
- irregularly
-
damage by:
-
There is new damage to assets that are not officially taken over by council. Ie. MIRVAC etc
-
🚫🚫🚫There is new damage to assets that are not officially taken over by council. The following damages are to be noted only for possible future reference.🚫🚫🚫
-
There is damage to crossing/s at the property
-
There are multiple damaged crossings at the property
-
There is damage to Concrete Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at crossing no. 1:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at crossing no. 1:
-
There is damage to Paved Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing No.1:
-
There is damage to Pram Crossing No. 1
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Sections depressed at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing No.1:
-
There is damage to Concrete Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing no. 2:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at concrete crossing no. 2:
-
There is damage to Pram Crossing No. 2
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing No 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing No 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Sections depressed at Pram Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing No. 2:
-
There is damage to Paved Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to Paved Crossing No. 2:
-
There is damage to Concrete Crossing
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at crossing:
-
There is damage to Paved Crossing
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing:
-
There is damage to Pram Crossing
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Sections depressed at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing:
-
There is damaged footpath/s in front of the property
-
The damaged footpath is concrete
-
There are damaged 100mm thick footpath bays
-
There are cracked 100mm bays
-
100mm thick concrete footpath bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped 100mm bays
-
100mm thick concrete footpath bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted 100mm bays
-
100mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed 100mm bays
-
100mm thick concrete footpath bays depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are further damages to 100mm bays
-
Irregular damage to 100mm concrete footpath bays:
-
There are damaged 125mm thick concrete footpath bays
-
There are cracked 125mm bays
-
125mm thick concrete footpath bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped 125mm bays
-
125mm thick concrete footpath bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted 125mm bays
-
125mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed 125mm bays
-
125mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to 125mm bays
-
Irregular damage to 125mm concrete footpath bays:
-
The damaged footpath is a shared usage asphalt path
-
Damage to the asphalt shared usage path:
-
There is damage to off street parking in front of the property
-
Off street parking bays
-
There are cracked bays in the off street parking
-
Off street parking bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped bays in off street parking
-
Off street parking bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted bays within off street parking
-
Off street parking bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed bays within off street parking
-
Off street parking bays depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are off street parking bays with other irregular damage
-
Irregular damage to off street parking bays:
-
Damage to Concrete rollover kerb within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb within off street parking:
-
Damage to Concrete kerb and channel within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete kerb and channel cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete kerb and channel chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete kerb and channel lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete kerb and channel depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel within off street parking:
-
Damage to Concrete plinth within off street parking
-
There are cracked sections of concrete plinth
-
Sections of concrete plinth cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete plinth
-
Sections of concrete plinth chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of concrete plinth
-
Sections of concrete plinth lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of concrete plinth
-
Sections of concrete plinth depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of concrete plinth with other types of damage
-
Irregular damage to concrete plinth within off street parking:
-
There is damage to kerbing in front of the property
-
Concrete kerb and channel
-
There are cracked sections of concrete kerb and channel
-
Cracked sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete kerb and channel
-
Chipped sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Lifted sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Depressed sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel x
-
Concrete rollover kerb
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb:
-
There is significant damage to the nature strip
-
The nature strip is in need of levelling, top soil and seed.
-
Nature strip requires levelling, top soil and seed.🚫🚫🚫
-
There is damage to the nature strip, requiring further attention than soil and seeding.
-
Damage to the nature strip:
-
There have been illegal alterations to the nature strip
-
Illegal crossing extension
-
Material used and approximate width of illegal crossing extension:
-
Illegal erection of Basketball Ring or other permanent structure
-
Illegal structure in the nature strip:
-
Illegal planting in a nature strip
-
Illegal planting in the nature strip:
-
Other type of illegal alteration to nature strip
-
Description of irregular and illegal alterations to a nature strip:
-
There are damaged pits in front of the property.
-
Side Entry Pit/s
-
Number of damaged Side Entry Pits:
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to the pit surround
-
1 x side entry pit surround
-
damaged by:
-
Damage to pit lid
-
1 x side entry pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Damage to lintel
-
1 x side entry pit lintel
-
damaged by:
-
Damage to multiple side entry pits:
-
Junction Pit/s
-
Number of damaged Junction Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple junction pits:
-
Damage to the pit surround
-
1 x junction pit surround
-
damaged by
-
Damage to pit lid
-
1 x junction pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by
-
Telephone Pit
-
Number of damaged Telephone Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple telephone pits:
-
Damage to the pit surround
-
1 x telephone pit surround
-
damaged by:
-
Damage to pit lid
-
1 x telephone pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Electricity Pit
-
Number of damaged Electricity Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple electricity pits:
-
Damage to the pit surround
-
1 x electricity pit surround
-
damaged by:
-
Damage to pit lid
-
1 x electricity pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Sewer Pit
-
Number of damaged Sewer Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple sewer pits:
-
1 x sewer pit surround
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
1x sewer pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Unclassified Pit
-
Number of damaged Unclassified Pits:
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple unclassified pits:
-
1 x unclassified pit surround
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
1 x unclassified pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
There are damaged drains in front of the property
-
The footpath edge or nature strip contains a damaged Concrete Spoon Drain
-
Damage to the concrete spoon drain:
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
There is damage to a constructed Swale drain that fronts the property
-
Damage to a constructed Swale drain:
- cracked
- chipped
- raised
- irregularly
-
damage by:
-
There is some new damage, but not enough to warrant repair:
-
🚫🚫🚫 New damages observed, but not requiring repair. 🚫🚫🚫
-
There is damage to crossing/s at the property
-
There are multiple damaged crossings at the property
-
There is damage to Concrete Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at crossing no. 1:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at crossing no. 1:
-
There is damage to Paved Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No.1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing No.1:
-
There is damage to Pram Crossing No. 1
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing No. 1. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Sections depressed at Pram Crossing No 1. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing No.1:
-
There is damage to Concrete Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing no. 2:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at concrete crossing no. 2:
-
There is damage to Pram Crossing No. 2
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing No 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing No 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Sections depressed at Pram Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing No. 2:
-
There is damage to Paved Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No. 2. x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to Paved Crossing No. 2:
-
There is damage to Concrete Crossing
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing:
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bay/s cracked at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bay/s chipped at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bay/s lifted at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bay/s depressed at concrete crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bay/s at crossing:
-
There is damage to Paved Crossing
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing:
-
There is damage to Pram Crossing
-
There are cracked sections of Pram Crossing
-
Sections cracked at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of Pram Crossing
-
Sections chipped at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted sections of Pram Crossing
-
Sections lifted at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed sections of Pram Crossing
-
Sections depressed at Pram Crossing x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Irregular damage to Pram Crossing:
-
There is damaged footpath/s in front of the property
-
The damaged footpath is concrete
-
There are damaged 100mm thick footpath bays
-
There are cracked 100mm bays
-
100mm thick concrete footpath bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped 100mm bays
-
100mm thick concrete footpath bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted 100mm bays
-
100mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed 100mm bays
-
100mm thick concrete footpath bays depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are further damages to 100mm bays
-
Irregular damage to 100mm concrete footpath bays:
-
There are damaged 125mm thick concrete footpath bays
-
There are cracked 125mm bays
-
125mm thick concrete footpath bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped 125mm bays
-
125mm thick concrete footpath bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted 125mm bays
-
125mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed 125mm bays
-
125mm thick concrete footpath bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to 125mm bays
-
Irregular damage to 125mm concrete footpath bays:
-
The damaged footpath is a shared usage asphalt path
-
Damage to the asphalt shared usage path:
-
There is damage to off street parking in front of the property
-
Off street parking bays
-
There are cracked bays in the off street parking
-
Off street parking bays cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped bays in off street parking
-
Off street parking bays chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted bays within off street parking
-
Off street parking bays lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed bays within off street parking
-
Off street parking bays depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are off street parking bays with other irregular damage
-
Irregular damage to off street parking bays:
-
Damage to Concrete rollover kerb within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb within off street parking:
-
Damage to Concrete kerb and channel within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete kerb and channel cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete kerb and channel chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete kerb and channel lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete kerb and channel depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel within off street parking:
-
Damage to Concrete plinth within off street parking
-
There are cracked sections of concrete plinth
-
Sections of concrete plinth cracked within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete plinth
-
Sections of concrete plinth chipped within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of concrete plinth
-
Sections of concrete plinth lifted within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of concrete plinth
-
Sections of concrete plinth depressed within off street parking x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of concrete plinth with other types of damage
-
Irregular damage to concrete plinth within off street parking:
-
There is damage to kerbing in front of the property
-
Concrete kerb and channel
-
There are cracked sections of concrete kerb and channel
-
Cracked sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete kerb and channel
-
Chipped sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Lifted sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Depressed sections of concrete kerb and channel x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel x
-
Concrete rollover kerb
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed x
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb:
-
There is significant damage to the nature strip
-
The nature strip is in need of levelling, top soil and seed.
-
Nature strip requires levelling, top soil and seed.🚫🚫🚫
-
There is damage to the nature strip, requiring further attention than soil and seeding.
-
Damage to the nature strip:
-
There have been illegal alterations to the nature strip
-
Illegal crossing extension
-
Material used and approximate width of illegal crossing extension:
-
Illegal erection of Basketball Ring or other permanent structure
-
Illegal structure in the nature strip:
-
Illegal planting in a nature strip
-
Illegal planting in the nature strip:
-
Other type of illegal alteration to nature strip
-
Description of irregular and illegal alterations to a nature strip:
-
There are damaged pits in front of the property.
-
Side Entry Pit/s
-
Number of damaged Side Entry Pits:
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to the pit surround
-
1 x side entry pit surround
-
damaged by:
-
Damage to pit lid
-
1 x side entry pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Damage to lintel
-
1 x side entry pit lintel
-
damaged by:
-
Damage to multiple side entry pits:
-
Junction Pit/s
-
Number of damaged Junction Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple junction pits:
-
Damage to the pit surround
-
1 x junction pit surround
-
damaged by
-
Damage to pit lid
-
1 x junction pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by
-
Telephone Pit
-
Number of damaged Telephone Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple telephone pits:
-
Damage to the pit surround
-
1 x telephone pit surround
-
damaged by:
-
Damage to pit lid
-
1 x telephone pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Electricity Pit
-
Number of damaged Electricity Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple electricity pits:
-
Damage to the pit surround
-
1 x electricity pit surround
-
damaged by:
-
Damage to pit lid
-
1 x electricity pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Sewer Pit
-
Number of damaged Sewer Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple sewer pits:
-
1 x sewer pit surround
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
1x sewer pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
Unclassified Pit
-
Number of damaged Unclassified Pits:
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to multiple unclassified pits:
-
1 x unclassified pit surround
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
1 x unclassified pit lid
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
There are damaged drains in front of the property
-
The footpath edge or nature strip contains a damaged Concrete Spoon Drain
-
Damage to the concrete spoon drain:
- cracked
- chipped
- raised
- irregularly
-
damaged by:
-
There is damage to a constructed Swale drain that fronts the property
-
Damage to a constructed Swale drain:
- cracked
- chipped
- raised
- irregularly
-
damage by:
Further Evidence Relevant to any claims made above.
-
I would like to include further notes describing any damage
-
Supporting Notes:
-
I would like to include a photo to support the claims above
-
Supporting Photos:
-
I would like to draw a sketch to support the claims above
-
Supporting sketch: