Information

  • Site of Works:

  • Road Opening Permit No:

Road Opening Permit Inspection Checklist

Works conducted by:

  • Contractor/s:

  • Contact Telephone No.:

Works Inspected by:

  • Council Inspecting Officer/s:

  • Name:

  • Date/Time of Inspection

Inspection Details:

  • Key Words:

  • Service Authority:

  • Works to be inspected under permit:

Preliminaries:

  • Is there a traffic management plan?

  • Are site conditions in accordance with approved Traffic Management Plan?

  • Traffic Management Plan in place and approved in accordance with regulations. βœ…

  • There is an issue with the traffic management plan. Comments:

  • There is no traffic management plan required for this job.

  • Are there any other site specific requirements to be activated prior to the commencement of any works?

  • There are no site specific requirements relating to this job.

  • Site specific requirements.

  • Have the above site specific requirements been met?

  • Site specific preliminary requirements in place and approved on inspection. βœ…

  • There is an issue regarding the site specific requirements. Comments:

  • Include Comments relating to Road Opening Permit Preliminaries and/or inspection

  • Extra notes and comments relating to Road Opening Permit Preliminaries and/or inspection:

  • Include photos relating to Road Opening Permit Preliminaries and/or inspection

  • Photos:

Vehicle Crossing

  • Type of works on vehicle crossing

  • Type of Inspection:

  • Correct layout and positioning of crossing? Check by tape.

  • 🚫 There is an issue with the layout and positioning of the crossing. Comments:

  • Measurement by tape of offsets, crossing and apron widths is approved. βœ…

  • Excavation depth? Check by tape. (175mm Access Rd, 200mm Link/industrial/commercial Rd)

  • Depth of excavation checked and approved?

  • Measurement of 175mm deep excavation checked and approved. βœ…

  • 🚫There are issues with the excavation. Comments:

  • Depth of excavation checked and approved?

  • Measurement of 200mm deep excavation checked and approved. βœ…

  • 🚫 There are issues with the excavation. Comments:

  • Is the correct bedding material being used and compacted in place?

  • Size 20, Class 2 Crushed Rock bedding is in use and compacted to 75mm. βœ…

  • 🚫 There is an issue with the bedding material. Comments:

  • Visual Inspection of Reinforcement Mesh (Min F72) correctly placed and elevated on bar chairs

  • Min. F72 Reinforcement Mesh is seen, has been placed correctly and is elevated on bar chairs. βœ…

  • 🚫 There is an issue with the Reinforcement Mesh. Comments:

  • Crossing gradient measured by tape and approved?

  • Crossing Gradients checked by tape and approved. βœ…

  • 🚫 There is an issue with the crossing gradient. Comments:

  • Correct materials and appropriate placement of expansion joints?

  • Expansion joint materials and locations inspected and approved. βœ…

  • 🚫 There is an issue with the expansion joints. Comments:

  • Use of dowels to existing kerb & channel seen and approved?

  • Dowels to existing kerb and channel inspected and approved. βœ…

  • 🚫 There are issues with dowels to the existing kerb and channel. Comments:

  • Inverts installed at correct level with appropriate channel alignment? (Check by tape/string line etc)

  • Level and line of invert inspected and approved. βœ…

  • 🚫 There is an issue with the level and/or line of invert. Comments:

  • Correct strength (min 25Mpa) of concrete is used and given a light broom finish?

  • Visual verification of concrete purchased (and/or docket) and light broom finish approved. βœ…

  • 🚫 There are issues with the concrete purchased or the finish executed. Comments:

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments relating to vehicle crossing and/or inspection:

  • Extra notes and comments regarding vehicle crossing and/or inspection:

  • Include photos relating to vehicle crossing:

  • Photos:

Indented Parking Bay

  • Type of works on indented parking bay:

  • Type of inspection:

  • Correct set out and positioning of parking bay, offsets and widths? (Check by tape)

  • Set out and positioning of indented parking bay and all relevant offsets and widths checked by tape and approved. βœ…

  • 🚫 There is an issue with the set out and positioning of the indented parking bay. Comments:

  • Depth of excavation (175mm) checked and approved?

  • Depth of 175mm excavation checked by tape and approved. βœ…

  • 🚫 There is an issue with the excavation. Comments:

  • Measurement by tape of minimum 50mm compacted depth of Size 20, Class 3 crushed rock.

  • Size 20, Class 3 Crushed Rock bedding is in use and compacted to 50mm. βœ…

  • 🚫 There is an issue with the bedding material. Comments:

  • Min. F72 reinforcement mesh placed correctly and elevated on bar chairs?

  • Min F72 reinforcement mesh is used, placed correctly and elevated on bar chairs. βœ…

  • 🚫 There is an issue with the reinforcement mesh. Comments:

  • Correct parking bay gradient? (Check by tape)

  • Gradient and cross fall of parking bay checked by tape and approved. βœ…

  • 🚫 There is an issue with the gradient and/or cross fall of the parking bay. Comments:

  • Correct materials and appropriate placement of expansion joints?

  • Expansion joint materials and locations inspected and approved. βœ…

  • 🚫 There is an issue with the expansion joints. Comments:

  • Correct strength (min 25Mpa) of concrete is used and given a light broom finish?

  • Visual verification of concrete purchased (and/or docket) and light broom finish approved. βœ…

  • 🚫 There is an issue with the concrete purchased and/or the Light broom finish. Comments:

  • Replacement of adjoining kerb to rollover or layback as required. Approval of kerb type, profile, line and grade?

  • Replacement of adjoining kerb (to rollover or layback etc, as required) including kerb type, profile, line and grade approved. βœ…

  • 🚫 There is an issue with the replacement of adjoining kerb to the existing assets as required. Comments:

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments regarding indented parking bay or inspection

  • Extra notes and comments regarding indented parking bay and/or inspection.

  • Include photos relating to indented parking bay

  • Photos:

Drainage

  • At what stage of works is the inspection being conducted?

  • Pipe trench excavation: What pipe is the trench being excavated for?

  • Has the trench (rectangular) been excavated to 300mm (x2) + the diameter of the pipe?

  • The rectangular trench has been appropriately excavated to suit the -1800mm pipe installed. βœ…

  • 🚫 There is an issue with pipe trench excavation. Comments:

  • Has the trench (rectangular) been excavated to 400mm (x2) + the diameter of the pipe?

  • The rectangular trench has been appropriately excavated to suit the +1800mm pipe installed. βœ…

  • 🚫 There is an issue with pipe trench excavation. Comments:

  • Has the trench (rectangular) been excavated to 200mm (x2) + the diameter of the pipe?

  • The rectangular trench has been appropriately excavated to suit the polyethylene pipe installed. βœ…

  • 🚫 There is an issue with pipe trench excavation. Comments:

  • Are the depth and materials of bedding used appropriate? Check by tape for depth to accord with design and/or standard drawings. Visually inspect bedding materials, looking for 20mm Class 3 FCR (for concrete & fibre reinforcement cement pipes) or 7mm one size aggregate (for U.P.V.C pipes)

  • The type of bedding materials used for pipes and depth of materials placed accord with what is required in the design and/or standard drawings. βœ…

  • 🚫 There is an issue with depth and/or quality of materials used for bedding. Comments:

  • Is the drainage pipe used in good condition? Visually inspect for damaged joints or cracks prior to laying.

  • The drainage pipe being used is in good condition, without damaged joints or cracks. βœ…

  • 🚫 There is an issue with the condition of drainage pipe being used. Comments:

  • 🚫 This inspection is being carried out under the proviso that all of the relevant criteria for drainage inspections prior to the laying of pipes have been met and approved. 🚫

  • Are drainage pipes laid true for line and level?

  • The drainage pipes have been checked for line and level and have been laid true. βœ…

  • 🚫 The is an issue with the line and/or level of the drainage pipes. Comments:

  • Inspect all pipe connections and haunching. Approved?

  • All pipe connections and haunching have been inspected and approved. βœ…

  • 🚫 There is an issue with the pipe connections and/or haunching. Comments:

  • Inspect jointing methods. Approved?

  • The jointing methods of pipes installed have been inspected and approved. βœ…

  • 🚫 There is an issue with the jointing methods used on pipes. Comments:

  • 🚫 This inspection is being carried out under the proviso that all of the relevant criteria for drainage inspections prior to the laying of pipes and backfill of trenches have been met and approved. The site is to be inspected at least twice a day during these works. 🚫

  • Is the depth of backfill and cover for pipes and the materials used approved? Check depth by tape (to accord with design and/or standard drawings) and visually inspect backfill and compaction of material:<br><br>β–ͺ20mm Class 2 crushed rock for trenches under trafficable areas.<br>β–ͺSand or approved material for other trenches up to Springing Line of pipe, with remainder backfilled with selected material from site<br>β–ͺ75mm topsoil cover

  • The depth of backfill and cover for pipes, plus materials used have all been inspected and approved to meet design and/or standard drawings. A least 2 inspections were carried out throughout the duration of these works. βœ…

  • 🚫 There is an issue with the depth of backfill and cover for pipes, and/or materials used. Comments:

  • 🚫 This inspection is being carried out under the proviso that all of the relevant criteria for drainage inspections prior to the pit installation stage have been met and approved. 🚫

  • Is the formwork for pit/s construction (cast insitu pits) set up correctly? Visually inspect to ensure correct thickness is achieved.<br><br>β–ͺWalls - min. 125mm thickness<br>β–ͺFloors - min. 150mm thickness

  • Pit/s construction formwork has been inspected and approved. βœ…

  • 🚫 There is an issue with pit/s construction formwork. Comments:

  • 🚫 This inspection is being carried out under the proviso that all of the relevant criteria for drainage inspections prior to the pit installation stage have been met and approved. 🚫

  • Visual approval that each pre cast pit segment is not damaged and has a min. 15mm rebate to ensure correct alignment and prevent horizontal movement.

  • Each pre cast pit segment has met approval of damage inspections and has a min. 15mm rebate, ensuring correct alignment and preventing horizontal movement. βœ…

  • 🚫 There is an issue with the pre cast pit/s being installed. Comments:

  • 🚫 This inspection is being carried out under the proviso that all of the relevant criteria for drainage inspections prior to and during the installation of pits have been met and approved. 🚫

  • Is the inside of the pit/s rendered where deemed necessary once formwork is removed?

  • The inside of the pit/s has been rendered wherever deemed necessary and approved. βœ…

  • 🚫 There is an issue with the rendering of the inside of the pit/s. comments:

  • Is the pit/s greater than 900mm in depth?

  • Have step irons been installed into the walls without pipe openings? (Where possible)

  • Do step irons start 500mm below underside of pit/s, with each additional step having a 300mm spacing?

  • Iron steps have been appropriately installed in all pits deeper than 900mm. βœ…

  • 🚫 Step irons have been installed into min. 900mm deep pit/s, however there is an issue with there placement. Comments:

  • 🚫 There is an issue with the installation of step irons in min. 900mm deep pit/s. Comment:

  • The pit/s being installed is less than 900mm in depth. No step irons are required.

  • Are pit lids and frames in accordance with council standards?

  • Pit lid/s and frame/s are in accordance with council standards. βœ…

  • 🚫 There is an issue with the pit lid/s and/or pit frame/s being installed. Comments:

  • 🚫 This inspection is being carried out under the proviso that all of the relevant criteria for drainage inspections to the completion of pit stage have been met and approved. 🚫

  • Are the culverts installed approved? Check for line and level, with appropriate channel alignment at entry and exit points.

  • Culverts installed have been checked for line, level and appropriate channel alignments at entry and exit points. βœ…

  • 🚫 There is an issue with the culvert/s installed. Comments:

  • 🚫 This inspection is being carried out under the proviso that all of the relevant criteria of drainage inspections to the completion of pit stage, along with culvert level prior to backfill and channel alignment on completion have been met and approved. 🚫

  • Are house drains connected to drainage works (either front or rear of lot) with 100mm sewer quality UPVC pipe?

  • 100mm sewer quality UPVC pipe is used to connect house drains to drainage works. Connections have been inspected and approved. βœ…

  • 🚫 There is an issue with the connection of drainage works to house drains. Comments:

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments regarding drainage and/or inspection:

  • Extra notes and comments regarding drainage and/or inspection.

  • Include photos regarding drainage and/or inspection:

  • Photos:

Nature Strip

  • Type of works on nature strip:

  • Has the nature strip been levelled?

  • Levelling of nature strip approved. βœ…

  • 🚫 There is an issue with the level of the nature strip. Comments:

  • Has topsoil been spread to a flush finish with adjoining footpath and kerb?

  • Topsoil has been spread to a flush finish with adjoining footpaths and kerbs. βœ…

  • 🚫 There is an issue with the placement of topsoil. Comments:

  • Has the area been reseeded if required?

  • Nature strip has been reseeded as required. βœ…

  • 🚫 There is an issue with the reseeding of the nature strip. Comments:

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments regarding nature strip and/or inspection:

  • Extra notes and comments regarding nature strip and/or inspection.

  • Include photos regarding nature strip and/or inspection:

  • Photos:

Kerb and Channel

  • Type of works on kerb & channel:

  • Type of inspection:

  • Kerb & channel base preparation approved? Check by tape the depth below design top of kerb. (Tolerance no greater than 15mm variation to bedding thickness.)

  • Kerb & channel base preparation has been checked by tape and approved. βœ…

  • 🚫 There is an issue with the base preparation. Comments:

  • Grade of kerb & channel approved? Check by tape at regular intervals using a string line erected by the contractor.

  • Grade of kerb & channel preparation checked by tape (with string line) and approved. βœ…

  • 🚫 There is an issue with the preparation of the grade of kerb & channel. Comments:

  • Kerb & channel type and profile approved? Measure using Council specifications template. Tolerance = +/- 7mm

  • Kerb & channel type is approved within tolerance using Councils specification Template. βœ…

  • 🚫 There is an issue with the kerb & channel type and/or profile. Comments:

  • Concrete strength approved? Min. 25Mph kerb & channel mix. (Check finish and/or purchase docket)

  • Concrete strength of min. 25Mph kerb & channel mix has been used and approved. βœ…

  • 🚫 There is an issue with concrete strength that has been used/ordered. Comments:

  • Does the line and finish of the kerb & channel comply with the council standards?

  • On visual inspection, the kerb & channel complies with the council standards for line and finish. βœ…

  • 🚫 There is an issue with the line and/or finish of the kerb & channel. Comments:

  • Does the job require pit lintels to be installed as a part of the kerb & channel?

  • Has the lintel/s been installed correctly? Check for the correct line, height and face of lintel.

  • Pit lintel/s have been checked for line, height and face and approved. βœ…

  • 🚫 There is an issue with the installation of pit lintel/s. Comments:

  • The job does not require the installation of a pit lintel within the kerb & channel.

  • Does the job require the installation of a side entry grate/s? (V grates)

  • Alignment of side entry grate (V grate) approved?

  • The alignment of the side entry grate/s (V Grate/s) has been checked and approved. βœ…

  • 🚫 There is an issue with the side entry grate (V Grate). Comments:

  • The job does not require the installation of any side entry grates.

  • Are there service authority conduits that require location stamps?

  • Has the kerb & channel been stamped accordingly to denote service locations?

  • The kerb & channel has been appropriately stamped to show locations of service authority conduits. βœ…

  • 🚫 There is an issue with the placement of service authority conduit location stamps. Comments:

  • There are no requirements for a service authority conduit location stamp.

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments regarding kerb & channel and/or inspection:

  • Extra notes and comments regarding kerb & channel and/or inspection.

  • Include photos regarding kerb & channel and/or inspection:

  • Photos:

Road Pavement

  • At what stage are Road Pavement works during this inspection?

  • Is the sub grade excavation approved? Check visually for line and level. Check measurements by tape and string line for correct set out. (Width, level and grade)

  • The Sub Grade excavation has been visually inspected for line and level, and measured by tape and string line for width, level and grade. The excavation has been approved. βœ…

  • 🚫 There is an issue with the Sub Grade excavation. Comments:

  • Is the Sub Grade preparation approved? Check compaction and adherence to design level using approved vehicle to proof roll the sub grade and string line to check level. (Regular inspections during construction and at completion of Sub Grade level)

  • The preparation of the Sub Grade, including its compaction and adherence to design level has been regularly checked throughout the construction process and completion, and is approved. βœ…

  • 🚫 There is an issue with the preparation of the Sub Grade. Comments:

  • Is the installation of Agricultural Drainage approved? Check by tape for depth below sub grade and trench width.

  • Is the backfill material purchased approved? Visual inspection and/or check purchase docket.

  • The installation of Agricultural Drainage, including depth below sub grade, trench width and material of backfill is approved. βœ…

  • 🚫 Agricultural drainage has been set up correctly, however there is an issue with the backfill material. Comments:

  • 🚫 There is an issue with the Agricultural Drain. Comments:

  • Is the service conduit installation approved? Check by tape for minimum 250mm cover below pavement boxing. (Note: Service authorities also conduct audits for compliance.)

  • Installation of service conduits has been checked and approved. βœ…

  • 🚫 There is an issue with the installation of service conduits. Comments:

  • If approved, Is this the final inspection of the Sub Grade? (Are the contractors permitted to begin preparing for the Base Layer?)

  • The Sub Grade hold point has been successfully reached and approved. Contractors have been given permission to begin work on the Base Layer stage. Comments:

  • Signed:

  • The Sub Grade hold point has not been reached as yet. Further inspections of Sub Grade works are required for council approval prior to the contractors beginning any Base Layer works. Comments:

  • Signed:

  • 🚫 Note🚫
    β–ͺThis Base Layer inspection is being conducted under the proviso that the Sub Grade level and all conditions of its preparation, construction and completion have been completed, inspected and approved by council officer/s 🚫

  • Approval of Class 3 crushed rock layer compaction and level? β–ͺCheck for correct material. β–ͺUse approved vehicle to proof roll the rock. β–ͺ Use a string line to check correct level. (Tolerance +/- 10mm) β–ͺinspect regularly during construction (eg twice a day) and at completion of Base Layer.

  • The Base Layer hold point has been successfully reached and approved. The contractors have been given permission to begin preparation for works on the Sub-Base Layer. Comments:

  • Signed:

  • 🚫 There is an issue with the Base Layer. Further inspections are required to achieve councils approval and permission for contractors to begin Sub-Base Layer. Comments:

  • Signed:

  • 🚫 Notes 🚫

    β–ͺThis Sub-Base Layer inspection is only being conducted under the proviso that the Base Layer and all conditions of its preparation, construction and completion have been completed, inspected and approved by council officer/s

    β–ͺThe Sub-Base Layer can only be commenced after sufficient curing of adjoining kerb & channel and backing up of nature strip to rear of kerb.

  • Approval of Class 2 crushed rock layer compaction and level? β–ͺCheck for correct material. β–ͺUse approved vehicle to proof roll the rock. β–ͺ Use a string line to check correct level. (Tolerance +/- 10mm) β–ͺinspect regularly during construction (eg twice a day) and at completion of Sub-Base Layer.

  • The Class 2 crushed rock layer has been checked and approved for material, compaction (by proof rolling) and level (by string line) βœ…

  • 🚫 There is an issue with the materials, compaction and/or level of the Class 2 crushed rock layer. Comments:

  • Have trenches under pavement and kerb & channel been backfilled sufficiently with Class 2 fine crushed rock? Check materials and depth of cover.

  • The backfill of trenches under pavement and kerb & channel has been checked and approved for material and depth. βœ…

  • 🚫 There is an issue with the materials used and/or depth of materials for backfill of trenches under pavement and/or kerb & channel. Comment:

  • If approved, Is this the final inspection of the Sub-Base Layer? (Are the contractors permitted to begin preparing for the Asphalt Layer?)

  • The Sub-Base Layer hold point has been successfully reached and approved. The contractors have been given permission to begin preparation for works on the Asphalt Layer. βœ… Comments:

  • 🚫 There is an issue with the Sub-Base Layer. Further inspections are required to achieve councils approval and permission for contractors to begin Asphalt Layer. Comments:

  • 🚫 Notes 🚫

    β–ͺThis Asphalt Layer inspection is only being conducted under the proviso that the Sub-Base Layer and all conditions of its preparation, construction and completion have been completed, inspected and approved by council officer/s

  • Approval of Tack Coat Application? To be applied when condition between Base Layer and Asphalt Layers is not contaminated. (Area to be cleaned by sweeper of water cart prior to application of tack coat)

  • The Tack Coat application has been inspected and approved. βœ…

  • 🚫 There is an issue with the Tack Coat application. Comments:

  • 🚫 Notes🚫
    β–ͺApplication of asphalt to be during temperatures above 12*C and dry.
    β–ͺAsphalt temperature to be no less than 120*C.

  • Approval of Base Course application? Check material type (purchase docket and/or visual inspection) and finish. Compaction checked by number of passes of roller. (On spot corrective treatment applied as required)

  • The Asphalt Base Course application has been inspected and approved. βœ…

  • 🚫 There is an issue with the Asphalt Base Course. Comments:

  • Approval of Wearing Course application? Check material type (purchase docket and/or visual inspection) and finish. Compaction checked by number of passes of roller.

  • The Asphalt Wearing Course application has been inspected and approved. βœ…

  • 🚫 There is an issue with the Asphalt Wearing Course. Comments:

  • Is the Asphalt Layer application completed and approved?

  • The Asphalt Layer has been completed, inspected and approved. βœ… Comments:

  • Signed:

  • 🚫 There is an issue with the Asphalt Layer. Further inspections are required to achieve councils approval and permission for contractors to complete Road Pavement. Comments:

  • Signed:

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments regarding kerb & channel and/or inspection:

  • Extra notes and comments regarding kerb & channel and/or inspection.

  • Include photos regarding kerb & channel and/or inspection:

  • Photos:

Footpaths/Shared Paths

  • Type of works on footpath/shared path:

  • Type of inspection:

  • Is the preparation of the path sufficient? (Check boxing for correct alignment, level and position of any vehicle crossings. Measure width of path to design and Knox standards, grade and cross fall to DDA compliance)

  • The preparation of the path has been checked and approved. βœ…

  • 🚫 There is an issue with the preparation of the path. Comments:

  • Are there any requirements for consideration of a tree root management system? (Consider path realignment, level alteration, root barriers or alternate pavement material where tree roots are prevalent.)

  • 🚫 There may be cause to consider a tree root management plan. Comments:

  • There is no requirements for a tree root management plan.

  • What material is the path to be constructed from?

  • What type of path is being constructed? Local & Key Paths - (100mm concrete, 50mm FCR Class 3) or Commercial, Industrial, Reserves, Shared Paths - (125mm concrete, 100mm FCR Class 3)

  • Is the base of the path sufficient? (Check by tape for 100mm concrete, 50mm FCR Class 3)

  • The base of the concrete path (100mm concrete, 50mm FCR Class 3) has been checked by tape and approved. βœ…

  • 🚫 There is an issue with the base of the concrete path. Comments:

  • Is the base of the path sufficient? (Check by tape for 125mm concrete, 100mm FCR Class 3)

  • The base of the concrete path (125mm concrete, 100mm FCR Class 3) has been checked by tape and approved. βœ…

  • 🚫 There is an issue with the base of the concrete path. Comments:

  • Visual inspection of Min. F72 Reinforcement Mesh correctly placed and elevated on bar chairs?

  • Min. F72 Reinforcement Mesh has been used, placed correctly and elevated on bar chairs. βœ…

  • 🚫 There is an issue regarding Reinforcement Mesh. Comments:

  • Is contractor using Min. 25MPa concrete strength (check purchase docket and/or finish) with a light broom finish and no highlights?

  • Min. 25MPa concrete strength has been used with a light broom finish and no highlights. βœ…

  • 🚫 There is an issue with the concrete strength and/or finish. Comments:

  • Are expansion joint spacings to standards? (Check for in between 125mm and 100mm concrete footpath bays, in between private property and council assets and every 8 metres of concrete bays)

  • Expansion joint positions have been checked and approved to standard. βœ…

  • 🚫 There is an issue with the expansion joints and/or their positioning. Comments:

  • Does Tactile paving meet DDA compliance standards?

  • Tactile paving meets the standards required for DDA compliance. βœ…

  • 🚫 There is an issue with the Tactile paving. Comments:

  • Is the base of the path sufficient? (Check by tape for 35mm asphalt, 150mm FCR Class 3)

  • The base of the asphalt path (35mm asphalt, 150mm FCR Class 3) has been checked by tape and approved. βœ…

  • 🚫 There is an issue with the base of the asphalt path. Comments:

  • Is the base of the path sufficient? (Check by tape for 50mm Granitic Sand, 100mm compacted depth of FCR Class 3)

  • The base of the Granitic Sand Paths (50mm Granitic Sand, 100mm compacted depth of FCR Class 3) has been checked by tape and approved. βœ…

  • 🚫 There is an issue with the base of the Granitic Sand Paths. Comments:

  • Is there a Pram Crossing/s being poured as part of the job?

  • Are measurements of the Pram Crossing to standard and a visual inspection of the crossing and crossing materials approved? (Check for Min. F72 Reinforcement Mesh, min. 25MPa Concrete strength, correct expansion and contraction joint spacing, tactile paving to DDA standards etc)

  • Visual inspection of Pram Crossing/s, materials used and measurement to council standards are approved. βœ…

  • 🚫 There is an issue with the Pram Crossing/s at the job. Comments:

  • There are no Pram Crossings to be poured as a part of the job.

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments regarding Footpaths/Shared Paths and/or inspection:

  • Extra notes and comments regarding Footpaths/Shared Paths and/or inspection.

  • Include photos regarding Footpaths/Shared Paths and/or inspection:

  • Photos:

Completion

  • Is signage placed at and around the siteapproved? Check for location, size and wording.

  • The location, size and wording of signage at the site is sufficient. βœ…

  • 🚫 There is an issue with signage at the job. Comments:

  • Has the site been appropriately reinstated? Check for reinstatement to pre construction condition, including clean up.

  • The reinstatement and clean up of the site has been checked and approved. βœ…

  • 🚫 There is an issue with the standard of reinstatement and/or clean up of the site. Comments:

  • Has a bond been withheld in relation to works on the site?

  • Have the specific conditions of bond been adhered to?

  • The specific conditions of a bond have been adhered to. The bond can be released. βœ…

  • 🚫 There is an issue with the compliance of specific conditions to a bond. Comments:

  • There has been no bond withheld in relation to this site.

  • Are there any site specific requirements?

  • Site Specific Requirements and comments:

  • There are no site specific requirements to be considered in this inspection.

  • Include any extra comments regarding completion and/or inspection:

  • Extra notes and comments regarding completion and/or inspection.

  • Include photos regarding completion and/or inspection:

  • Photos:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.