Information
-
Inspection Address
-
Address
-
Date and Time:
-
Inspected by:
- Tino Pegoraro
- Ian Lochhead
- Bob Larkin
- Nathan Hasankolli
-
Building Permit No.
-
Signed by:
-
Property address
-
Building Permit No.
-
Date and time of inspection
-
Inspected by
Damage listed in pre work inspection (section 80)
-
List of damages noted previously
-
Further damages exist
-
There are further damages which are not as a direct result of building works, therefor not requiring a letter to repair assets.
Damaged Items not requiring repair
-
There is damage to crossing/s at the property
-
There is damage to Concrete Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bays cracked at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bays chipped at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bays lifted at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bays depressed at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bays
-
There is damage to Pram Crossing No. 1
-
There is damage to the laybacks
-
There are cracked Laybacks
-
Laybacks cracked at Pram Crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at Pram Crossing No 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at Pram Crossing No 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Description of irregular damage to Pram Crossing No.1
-
There is damage to Paved Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing No.1
-
There are multiple crossings at the property
-
There is damage to Concrete Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing no. 2
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bays cracked at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bays chipped at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bays lifted at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bays depressed at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bays at concrete crossing no. 2
-
There is damage to Pram Crossing No. 2
-
There is damage to the laybacks
-
There are cracked Laybacks
-
Laybacks cracked at Pram Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at Pram Crossing No 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at Pram Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Description of irregular damage to Pram Crossing No. 2
-
There is damage to Paved Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing No. 2
-
There is damaged footpath/s in front of the property
-
The damaged footpath is concrete
-
There are damaged 100mm thick footpath bays
-
There are cracked 100mm bays
-
100mm thick concrete footpath bays cracked
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped 100mm bays
-
100mm thick concrete footpath bays chipped
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted 100mm bays
-
100mm thick concrete footpath bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed 100mm bays
-
100mm thick concrete footpath bays depressed
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are further damages to 100mm bays
-
Irregular damages to 100mm concrete footpath bays
-
There are damaged 125mm thick concrete footpath bays
-
There are cracked 125mm bays
-
125mm thick concrete footpath bays cracked
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped 125mm bays
-
125mm thick concrete footpath bays chipped
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted 125mm bays
-
125mm thick concrete footpath bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed 125mm bays
-
125mm thick concrete footpath bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to 125mm bays
-
Irregular damages to 125mm concrete footpath bays
-
The damaged footpath is a shared usage asphalt path
-
Describe any significant damage to the asphalt shared usage path
-
Include any photos that will assist the above claim
-
Draw a sketch that will assist the above claim
-
There is damage to off street parking in front of the property
-
Off street parking bays
-
There are cracked bays in the off street parking
-
Off street parking bays cracked
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped bays in off street parking
-
Off street parking bays chipped
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted bays within off street parking
-
Off street parking bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed bays within off street parking
-
Off street parking bays depressed
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are off street parking bays with other irregular damage
-
Irregular damage to off street parking bays
-
Damage to Concrete rollover kerb within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb within off street parking
-
Damage to Concrete kerb and channel within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete kerb and channel cracked within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete kerb and channel chipped within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete kerb and channel lifted within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete kerb and channel depressed within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel within off street parking
-
Damage to Concrete plinth within off street parking
-
There are cracked sections of concrete plinth
-
Sections of concrete plinth cracked within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete plinth
-
Sections of concrete plinth chipped within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of concrete plinth
-
Sections of concrete plinth lifted within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of concrete plinth
-
Sections of concrete plinth depressed within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of concrete plinth with other types of damage
-
Irregular damage to concrete plinth within off street parking
-
There is damage to kerbing in front of the property
-
Concrete kerb and channel
-
There are cracked sections of concrete kerb and channel
-
Cracked sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete kerb and channel
-
Chipped sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Lifted sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Depressed sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel
-
Concrete rollover kerb
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb
-
There is significant damage to the nature strip
-
Damage to the nature strip
-
Include a photo
-
Photo of nature strip damage
-
There have been illegal alterations to the nature strip
-
Illegal crossing extension
-
Material used and approx. width of illegal crossing extension
-
Include a photo
-
Photo of illegal crossing extension
-
Illegal erection of Basketball Ring or other permanent structure
-
Illegal structure (explain)
-
Include a photo
-
Photo of illegal structure
-
Illegal planting in a nature strip
-
Illegal planting (explain)
-
Include a photo
-
Photo of illegal planting
-
Other type of illegal alteration to nature strip
-
Description of irregular and illegal alterations to a nature strip
-
Include a photo
-
Photo of irregular and illegal alterations to a nature strip
-
There are damaged pits in front of the property.
-
Side Entry Pit/s
-
Number of damaged Side Entry Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to the pit surround
-
Damage to the pit surround
-
Describe the "other" damage
-
Damage to pit lid
-
Damage to pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to lintel
-
Damage to lintel
-
Describe the "other" damage
-
Briefly outline damage to multiple pits
-
Junction Pit/s
-
Number of damaged Junction Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to pit surround/s
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to pit lid/s
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Telephone Pit
-
Number of damaged Telephone Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Electricity Pit
-
Number of damaged Electricity Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Sewer Pit
-
Number of damaged Sewer Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Unclassified Pit
-
Number of damaged Unclassified Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
There are damaged drains in front of the property
-
The footpath edge or nature strip contains a damaged Concrete Spoon Drain
-
Damage to the concrete spoon drain
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
There is damage to a constructed Swale drain that fronts the property
-
Damage to the constructed Swale drain
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
There are further damages as a result of building works and require a letter of repair
Further damages requiring a letter to repair assets
-
There is damage to crossing/s at the property
-
There is damage to Concrete Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bays cracked at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bays chipped at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bays lifted at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bays depressed at concrete crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bays
-
There is damage to Pram Crossing No. 1
-
There is damage to the laybacks
-
There are cracked Laybacks
-
Laybacks cracked at Pram Crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at Pram Crossing No 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at Pram Crossing No 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Description of irregular damage to Pram Crossing No.1
-
There is damage to Paved Crossing No. 1
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Pram Crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No. 1
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No.1
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing No.1
-
There are multiple crossings at the property
-
There is damage to Concrete Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at concrete crossing No.2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the layback
-
Irregular damage to laybacks at concrete crossing no. 2
-
There is damage to the infill bays
-
There are cracked infill bays
-
Infill bays cracked at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped infill bays
-
Infill bays chipped at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted infill bays
-
Infill bays lifted at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed infill bays
-
Infill bays depressed at concrete crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the infill bays
-
Irregular damage to infill bays at concrete crossing no. 2
-
There is damage to Pram Crossing No. 2
-
There is damage to the laybacks
-
There are cracked Laybacks
-
Laybacks cracked at Pram Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Pram Crossing No 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted laybacks
-
Laybacks lifted at Pram Crossing No 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed laybacks
-
Laybacks depressed at Pram Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to the pram crossing
-
Description of irregular damage to Pram Crossing No. 2
-
There is damage to Paved Crossing No. 2
-
There is damage to the laybacks
-
There are cracked laybacks
-
Laybacks cracked at Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped laybacks
-
Laybacks chipped at Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
-
There is damage to the paved area
-
Pavers are cracked
-
Pavers cracked at Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are chipped
-
Pavers chipped in Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are lifted
-
Pavers lifted in Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Pavers are depressed
-
Pavers depressed in Paved Crossing No. 2
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Other damage
-
Irregular damage to pavers in Paved Crossing No. 2
-
There is damaged footpath/s in front of the property
-
The damaged footpath is concrete
-
There are damaged 100mm thick footpath bays
-
There are cracked 100mm bays
-
100mm thick concrete footpath bays cracked
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped 100mm bays
-
100mm thick concrete footpath bays chipped
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted 100mm bays
-
100mm thick concrete footpath bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed 100mm bays
-
100mm thick concrete footpath bays depressed
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are further damages to 100mm bays
-
Irregular damages to 100mm concrete footpath bays
-
There are damaged 125mm thick concrete footpath bays
-
There are cracked 125mm bays
-
125mm thick concrete footpath bays cracked
- 1
- 2
- 3
- 4
- 5
- 6
-
There are chipped 125mm bays
-
125mm thick concrete footpath bays chipped
- 1
- 2
- 3
- 4
- 5
- 6
-
There are lifted 125mm bays
-
125mm thick concrete footpath bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
-
There are depressed 125mm bays
-
125mm thick concrete footpath bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
-
There is further damage to 125mm bays
-
Irregular damages to 125mm concrete footpath bays
-
The damaged footpath is a shared usage asphalt path
-
Describe any significant damage to the asphalt shared usage path
-
Include any photos that will assist the above claim
-
Draw a sketch that will assist the above claim
-
There is damage to off street parking in front of the property
-
Off street parking bays
-
There are cracked bays in the off street parking
-
Off street parking bays cracked
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped bays in off street parking
-
Off street parking bays chipped
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted bays within off street parking
-
Off street parking bays lifted
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed bays within off street parking
-
Off street parking bays depressed
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are off street parking bays with other irregular damage
-
Irregular damage to off street parking bays
-
Damage to Concrete rollover kerb within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb within off street parking
-
Damage to Concrete kerb and channel within off street parking
-
There are cracked sections of kerbing
-
Sections of concrete kerb and channel cracked within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete kerb and channel chipped within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete kerb and channel lifted within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete kerb and channel depressed within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel within off street parking
-
Damage to Concrete plinth within off street parking
-
There are cracked sections of concrete plinth
-
Sections of concrete plinth cracked within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete plinth
-
Sections of concrete plinth chipped within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of concrete plinth
-
Sections of concrete plinth lifted within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of concrete plinth
-
Sections of concrete plinth depressed within off street parking
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of concrete plinth with other types of damage
-
Irregular damage to concrete plinth within off street parking
-
There is damage to kerbing in front of the property
-
Concrete kerb and channel
-
There are cracked sections of concrete kerb and channel
-
Cracked sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of concrete kerb and channel
-
Chipped sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Lifted sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Depressed sections of concrete kerb and channel
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete kerb and channel
-
Concrete rollover kerb
-
There are cracked sections of kerbing
-
Sections of concrete rollover kerb cracked
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are chipped sections of kerbing
-
Sections of concrete rollover kerb chipped
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are lifted sections of kerbing
-
Sections of concrete rollover kerb lifted
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are depressed sections of kerbing
-
Sections of concrete rollover kerb depressed
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
There are sections of kerbing with other types of damage
-
Irregular damage to concrete rollover kerb
-
There is significant damage to the nature strip
-
Damage to the nature strip
-
Include a photo
-
Photo of nature strip damage
-
There have been illegal alterations to the nature strip
-
Illegal crossing extension
-
Material used and approx. width of illegal crossing extension
-
Include a photo
-
Photo of illegal crossing extension
-
Illegal erection of Basketball Ring or other permanent structure
-
Illegal structure (explain)
-
Include a photo
-
Photo of illegal structure
-
Illegal planting in a nature strip
-
Illegal planting (explain)
-
Include a photo
-
Photo of illegal planting
-
Other type of illegal alteration to nature strip
-
Description of irregular and illegal alterations to a nature strip
-
Include a photo
-
Photo of irregular and illegal alterations to a nature strip
-
There are damaged pits in front of the property.
-
Side Entry Pit/s
-
Number of damaged Side Entry Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Damage to the pit surround
-
Damage to the pit surround
-
Describe the "other" damage
-
Damage to pit lid
-
Damage to pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to lintel
-
Damage to lintel
-
Describe the "other" damage
-
Briefly outline damage to multiple pits
-
Junction Pit/s
-
Number of damaged Junction Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to pit surround/s
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to pit lid/s
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Telephone Pit
-
Number of damaged Telephone Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Electricity Pit
-
Number of damaged Electricity Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Sewer Pit
-
Number of damaged Sewer Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Unclassified Pit
-
Number of damaged Unclassified Pits
- 1
- 2
- 3
- 4
- 5
- 6
-
Briefly outline damage to multiple pits here, rather than using options below
-
Damage to the pit surround
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
Damage to the pit lid
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
There are damaged drains in front of the property
-
The footpath edge or nature strip contains a damaged Concrete Spoon Drain
-
Damage to the concrete spoon drain
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
There is damage to a constructed Swale drain that fronts the property
-
Damage to the constructed Swale drain
- cracked
- chipped
- raised
- other
-
Describe the "other" damage
-
No further damages exist
-
There is no further damage to report
Further Evidence Relevant to any claims made above.
-
I would like to include further notes describing any damage
-
Notes:
-
I would like to include a photo to support the claims above
-
Photos:
-
I would like to draw a sketch to support the claims above
-
Supporting sketch: