Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Site location
-
Date / Time of inspection
-
Person Conducting Inspection
-
Works Type
- Stop Slow Control
- Standard Lane Closure
- Lane Closure With Chicane
- Multi Directional Lane Supression
- Contraflow
- Lateral Shift
- Road Closure
- Part Road Closure
- Emergency Works
- Shoulder Closure
- Mobile Works
- Frequently Changing Worksite
-
Road configuration
- single lane One Direction
- Single Lane Both Directions
- Multi lane One Direction
- Multi Lane Both Directions Undevided
- Multi Lane Both Directions Devided
- Intersection
- Sliplane
-
Road Type
- Straight
- Hill
- Intersection
- dirt / gravel
- wet
- dry
- Corner
- Roundabout
-
TGS for works on site
-
ROL required
-
Pre Start safety meeting has been conducted with all staff
-
Licences and tickets have been inspected
-
All persons have signed onto SWMS and JSA
-
Brief sketch of workzone
-
WORKS MAY NOT BEGIN UNTIL A ROLLING SAFTEY INSPECTION OF THE SITE HAS BEEN CONDUCTED
-
A Rolling inspection has been conducted
-
Time of rolling inspection
-
Rolling inspection conducted by
-
The site is safe to begin works
-
Signage and devices have been implemented according to the TGS
-
Provision has been made for pedestrians
-
Provision has been made for cyclists and persons with prams and wheelchairs
-
Overhead power has been marked with signage and devices
-
Traffic controllers will maintain a safe escape route
-
Traffic flow has been monitored and is satisfactory with the implementation of the TGS
-
Existing speed signage has been covered
-
Worker exclusion and retention zoning has been implemented
-
ROL
-
Identify any site specific hazards
-
Crew 1
-
Crew 2
-
Crew 3
-
Crew 4
-
Crew 5
-
Crew 6
-
Supervisor