Title Page
-
Project Name
-
Sales Order Number
-
Builder
-
End User
-
Conducted on
-
Walk through conducted by:
-
Site Foreman
-
Project Manager
-
Location
General Inspection For Field Equipment
-
Does all Audio Visual equipment in the room receiver power?
-
Is all equipment installed per the scope of works?
-
Is all visible cabling neatly secured with velcro and socked?
-
Are all cables labelled as per the approved Audio Visual schematics (ensure most recent drawings are being used).
General Inspection for the Rack
-
Is there a rack present in the room?
-
Is the rack able to be pulled out to a reasonable distance that provides serviceability to the back and sides?
-
Is all the equipment that are mounted on shelves fastened using appropriate methods? (Cable Ties are not allowed)
-
Are all cables labelled as per the approved Audio Visual schematics (ensure most recent drawings are being used).
-
Is there any copper exposed in any of the terminations?
-
Have all cables been installed with an adequate bend radius as recommended by the manufacturer?
-
Is there a centralised rack for all equipment in this room?
-
Is the rack able to be pulled out to a reasonable distance that provides serviceability to the back and sides?
-
Is all the equipment that are mounted on shelves fastened using appropriate methods? (Cable Ties are not allowed)
-
Are all cables labelled as per the approved Audio Visual schematics (ensure most recent drawings are being used).
-
Is there any copper exposed in any of the terminations?
-
Have all cables been installed with an adequate bend radius as recommended by the manufacturer?
Display Testing
-
What displays were tested?
- LCD.01
- LCD.02
- LCD.03
- LCD.04
- LCD.05
- LCD.06
- LCD.07
- LCD.08
- LCD.09
- LCD.10
- PROJ.01
- PROJ.02
- PROJ.03
- PROJ.04
- PROJ.05
- PROJ.06
-
Was LCD.01 able to turn on & off?
-
Were the sources for LCD.01 able to be changed?
-
Has overscan been turned off?
-
Was LCD.01 able to turn on & off?
-
Were the sources for LCD.01 able to be changed?
-
Has overscan been turned off?
-
Was LCD.02 able to turn on & off?
-
Were the sources for LCD.02 able to be changed?
-
Has overscan been turned off?
-
Was LCD.03 able to turn on & off?
-
Were the sources for LCD.03 able to be changed?
-
Has overscan been turned off?
-
Was LCD.04 able to turn on & off?
-
Were the sources for LCD.04 able to be changed?
-
Has overscan been turned off?
-
Was LCD.05 able to turn on & off?
-
Were the sources for LCD.05 able to be changed?
-
Has overscan been turned off?
-
Was LCD.06 able to turn on & off?
-
Were the sources for LCD.06 able to be changed?
-
Has overscan been turned off?
-
Was LCD.07 able to turn on & off?
-
Were the sources for LCD.07 able to be changed?
-
Has overscan been turned off?
-
Was LCD.08 able to turn on & off?
-
Were the sources for LCD.08 able to be changed?
-
Has overscan been turned off?
-
Was LCD.09 able to turn on & off?
-
Were the sources for LCD.09 able to be changed?
-
Has overscan been turned off?
-
Was LCD.10 able to turn on & off?
-
Were the sources for LCD.10 able to be changed?
-
Has overscan been turned off?
-
Did the Projector turn on/off?
-
Was PROJ.01 able to change sources?
-
Did PROJ.01 turn on/off?
-
Was PROJ.01 projecting in the correct format to the screen/board?
-
Was there a projection screen?
-
Did PROJ.01 fill the screen?
-
Was the screen able to be lowered and raised without issues?
-
Was the screen able to be lowered and raised without issues?
-
Did PROJ.02 turn on/off?
-
Was PROJ.02 able to change sources?
-
Was PROJ.02 projecting in the correct format to the screen/board?
-
Was there a projection screen?
-
Did PROJ.02 fill the screen?
-
Was the screen able to be lowered and raised without issues?
-
Did PROJ.03 turn on/off?
-
Was PROJ.03 able to change sources?
-
Was PROJ.03 projecting in the correct format to the screen/board?
-
Was there a projection screen?
-
Did PROJ.03 fill the screen?
-
Was the screen able to be lowered and raised without issues?
-
Did PROJ.04 turn on/off?
-
Was PROJ.04 able to change sources?
-
Was PROJ.04 projecting in the correct format to the screen/board?
-
Was PROJ.04 able to change sources?
-
Was there a projection screen?
-
Did PROJ.04 fill the screen?
-
Was the screen able to be lowered and raised without issues?
-
Did PROJ.05 turn on/off?
-
Was PROJ.05 able to change sources?
-
Was PROJ.05 projecting in the correct format to the screen/board?
-
Was there a projection screen?
-
Did PROJ.05 fill the screen?
-
Was the screen able to be lowered and raised without issues?
-
Did PROJ.06 turn on/off?
-
Was PROJ.06 able to change sources?
-
Was PROJ.06 projecting in the correct format to the screen/board?
-
Was there a projection screen?
-
Did PROJ.06 fill the screen?
-
Was the screen able to be lowered and raised without issues?
Source Selection
-
What sources are currently able to be displayed?
- Apple TV
- Wireless Presentation Unit
- Local HDMI + VGA & AUD input plate
- Local HDMI plate
- USB input plate (for touch overlay interactivity)
- Local PC
- Video Conferencing Codec
- Google Chromebox
- Blu-Ray player
Audio Testing
-
Is there audio in the room?
-
How is the audio being distributed?
-
Are all speakers producing audio?
-
Is the audio level adequate for the size of the room?
-
Is the audio being sent through a Digital Signal Processor?
-
Has all DSP programming been installed and are all signals are being passed as intended?
Control Testing
-
What is the Control System?
-
Is the Control System connected to the network?
-
Does the GUI conform to the clients requirements?
-
As per the AV Scope, is all the necessary equipment able to be selected and controlled?
Video Conferencing
-
Does the room have Video Conferencing capabilities?
-
Has a test conference call been made?
-
What microphone/s have been installed?
-
Do the Ceiling Array Microphones pick up the users normal talking voice?
-
Are there any echoes experienced during the Video Conferencing call?
-
Has a Camera been installed?
-
Is the Camera installed in a position that views the entire audience?
-
Does the camera have Zoom/Tilt capabilities?
-
Can the camera be controlled via a remote or touch panel? (e.g. zoom & tilt functionality).
Sign Off
-
Concept AV confirm that the Audio Visual System installed meets the requirements described in the Audio Visual Specification.
-
Concept AV's representatives signature.
-
I acknowledge that the AV system has been tested and meets the requirements as stated in the Audio Visual Specification.
-
Client's signature.