Information

  • Tenant name

  • Address

  • is the ASHP installation in a good position and has followed the design?

  • ASHP sited on pad which is 150mm centre of feet

  • Lagging to external pipe work ?

  • Check heating pipes throughout?

  • Patching to wall and ceiling?

  • Tanks removed from roof space?

  • Old airing cupboard pipes/wires removed?

  • All pipe lagged in Airing cupboard

  • All radiators fitted & plumbed?

  • Old radiator holes filled?

  • Floorboard made good?

  • Tenant instructed in system use?

  • All pipes secure?

  • All pipes lagged in roof space and AAV visible

  • Reading of Glycol Percentage

  • Fill and Flush Valves caps on tight?

  • Surveyor Auditor

  • Tenant

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.