Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Project Title:
-
Project Title:
Risk Class: I. II. III. IV.
-
Risk Class:
Inspector:
-
Inspector: William C. alford, Facilities Operations Supervisor
Post-Construction, Preoccupancy
-
Wet-mop area with disinfectant.
-
Barriers not removed until area thoroughly cleaned.
-
Barriers not removed until area inspected by Safety and Infection Control.
-
Renovation units thoroughly cleaned before admitting patients.
Utility Services
-
Provide documentation of correct procedures following reestablishment of interrupted utility services, including but not limited to:
-
Drinking water
-
Sewage
-
Ventilation system
-
Medical Gases
-
Water lines have been flushed thoroughly in newly renovated and adjacent areas before occupancy.
Air Quality
-
If air ducts not completely sealed, filters removed and changed.
-
Remove isolation of HVAC system in areas where work is being performed.
Signatures:
-
Project Manager:
-
Infection Control:
-
Facilities Services:
-
Safety: