Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Inspection Report
Beginning of the Shift:
-
Personnel badged, in company uniform, and following dress codes.
-
Personnel clocked in/ signed in properly and on time.
-
Personnel restocked their carts and prepared their tools.
-
Supplemental staff is approved to be on-site, is properly trained, and understands their assignment.
-
Control and manage inventory
During the Shift:
-
Floors were swept and mopped to include corners and ledges.
-
High traffic areas were vacuumed.
-
Zone vacuuming completed as outlined in the weekly schedule.
-
High touch points, tabletops, countertops, and door were cleaned and disinfected.
-
Regular trash and recycling receptacles were emptied, wiped, and relined.
-
Lobbies were cleaned to include glass doors, entry ways, reception, and waiting areas.
-
Elevators were cleaned and polished.
-
Stairs were swept and mopped (or vacuumed). Handrails were cleaned and disinfected.
-
Restrooms were properly sanitized, deodorized, and restocked.
-
Offices and work stations cleaned, sanitized, and reset.
-
Dusting completed as outlined in cleaning schedule.
-
Breakrooms and cafeterias were cleaned, disinfected, restocked, and reset as per the room configuration. Appliances cleaned.
-
Weekly refrigerator cleaning completed (if applicable).
-
Conference rooms, meeting rooms and other community areas were properly cleaned, disinfected, and reset as per the room configuration.
-
Sinks, water fountains, and other stainless-steel surfaces were washed and polished.
-
All waste transported and discarded in the proper dumpster/compactor. Waste area left clean and free of waste.
-
Grounds cleaned, waste emptied, and smoking areas serviced (if applicable).
-
Other building service areas properly cleaned. Describe.
-
Safety Checks: Staff observed following safe procedures. Warning signs were posted when situations granted. Chemicals properly diluted and diluted. Equipment in safe working conditions.
-
Work site security protocols were followed and doors were kept locked at all times.
-
Maintenance issues reported (if any).
-
Project work completed. Describe:
-
Project work must be inspected to ensure work has been completed successfully and furniture has been reset in its original position
End of the Shift:
-
Personnel has turned off lights and secured their areas as instructed
-
Personnel has stored their tools and equipment
-
Personnel has turned in building keys
-
Personnel has clocked out as scheduled
Closing Remarks
-
Additional Comments:
-
Signature:
-
Manager’s Signature:
-
Note: Please place a copy of this report in your Operations Manual. Make sure any deficiency noted on this report is corrected before filing