Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Basic Site information
-
Type of survey being conducted
-
Type of site being surveyed
Site Contact Details
-
Enter site managers name
-
Enter site managers contact number
-
Enter site managers email
Site financial information
-
Enter current fuel type
- Oil
- Natural Gas
- Calor Gas
- Electric
- Diesel
- Other
-
Enter customer preference in relation to the type of biomass being considered
- wood pellet
- woodchip
Site access information
-
Is it possible for a delivery vehicle to get into site
-
Add photos of site access point
Boiler house information
-
Is there space in the boiler room for a new boiler and buffer tanks
-
Is there space in the boiler house for a hopper
-
Add photos of boiler house
-
Enter make and model of existing boilers
-
Enter role of existing boilers
-
Add photos of existing boilers
-
Could a new biomass boiler be fitted in the existing boiler room without removing the existing boilers
-
Add drawing
Costs
-
- Indicative cost
- Quoted costs
-
Install cost
Sign off
-
Surveyor
-
Biomass project manager
-
Director