Title Page

  • Building

  • Area

  • Elevation

  • Works

  • Certa Manager

Installation

Installation Works

  • Type of works

  • Have correct materials been delivered to site?

  • Has Peel test been carried out?

  • Install Galv perimeter upstand

  • Primer onto Concrete slab

  • Install Torch on VCL

  • Install PU Adhesive

  • Install Enetherm PIR Insulation Board

  • Prime Insulation with Bonding agent

  • Install heat activated (torch on) underlay

  • Install torch on Cap sheet

  • Evidence

  • Has Correct material been delivered to site?

  • Install VCL layer onto Roofdeck

  • Install IKO PIR insulation

  • Carry out adhesion tests

  • Install Armourplan P SPM

  • Install IKOFIX Peelstop bar fixed with perimeter fixing at 250mm centres

  • Install IKO Membrane cover strap

  • Electronic integrity test carried out

  • Evidence

  • Has correct Material been delivered to site

  • Install Novia FR Breather Membrane across face of SFS & sheathing boards.

  • Install 220mm deep Euroclad Quattro spacer system

  • Install 220mm Knauf Factoryclad 40 insulation

  • Install 0.7mm steel Prisma coated (RA7012) 32/1000R profile with class A Butyl mastic seals and stainless steel fixings

  • Install External flashings with class A Butyl mastic seals and stainless steel fixings

  • Clean down area

  • Design & Materials Approved

  • Personnel Competent

  • Temporary Works Approved

  • Acceptance of Sub Structure

  • Materials Checked Before Use

  • Client Set Out Gridlines & Datum

Installation

  • Liner flashings

  • Evidence

  • Liner sheets

  • Evidence

  • Ridge galv

  • Evidence

  • VCL

  • Evidence

  • Insulation

  • Evidence

  • Veio outer sheet

  • Evidence

  • Seals/Fillers etc

  • Evidence

  • Check Critical Interfaces

  • Detail Work

  • Interface and detail work evidence

  • Close out snagging from tracker

  • Check Area free from damage & surplus material

Snagging

Snagging

  • Have any Snags been identified?

  • Photo

  • Have Snags been Rectified?

  • Photo

Senior Manager QA Checks and Handover

Certa QA Manager Final (or Senior Certa Manager) Inspection

  • Have all items on QA form been filled in?

  • Have any 3rd party test or inspection reports been carried out?

  • Is area snag free and ready for handover?

  • Have final QA checks been carried out?

  • Is area ready for handover?

Handover

  • On behalf of Certa Roofing and Cladding LTD

  • Signature

  • On behalf of KIER

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.