Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Section A (General)
-
Unit Data Collected
-
Unit Data is as per technical data schedule
-
Pressure relief valve installed
-
Feed Water Tank Installed and Water flow to Boiler verified
-
Flues complete including insulation
-
Tank is installed vented to atmosphere and drain connection can withstand 95C water
-
Certification of boilers received
Section B (Pipework)
-
Pipework installation completed
-
Pipework pressure tested and flushed and cleaned
-
Manual isolation valves open
-
Automatic control valves open
-
Pressure Reduction Station are isolated and ready for setup
-
Condensate traps are piped back to pre-heat feed water, or suitable drain.
-
All relief valves are of the correct size and vented to atmosphere
Section C (Electrical)
-
Electrical Installation Complete
-
Emergency Shutdown Installed
-
Safety Interlocks Checked
-
Thermostatic Control Checked
Section D ( Vibration Isolation)
-
Springs installed at the right compression (if applicable)
-
Base Level and free
-
Seismic Bolts Installed
Section E (Gas)
-
Gas Installation Complete
-
Thermal Emergency Shutdown Complete
-
Gas Inspection Complete
Sign Off
-
Add signature
-
Add signature
-
Add signature