Information
-
Document No.
-
Audit Title: Apartment Inspection
-
Plot
-
Block
- Block A
- Block B
- Block C
- Block D
- D town house
- B town house
- 5 story town house
-
Level
- Ground Floor
- level 1
- level 2
- level 3
- level 4
- level 5
- level 6
- level 7
- level 8
- level 9
- Roof
-
Flat Ref
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Flat Type
- Social
- Private
- Intermediate
-
Kitchen Type
- Alno
- Manhattan
-
Wates / Greenwich Peninsula
-
Conducted on
-
Prepared by
Drawing ref:
-
Drawing:
2nd Fix:
Sanitary Ware.
-
1: Check setting out positions for bathrooms\ensuites are to latest architects setting out drawings.
-
2: Check bath handles are tight.
-
3: Check baths are level and at correct height.
-
4: Check bath wastes are connected and flood test to prove no leaks
-
5: check pans and cisterns are securely fastened to floor and tight back to wall.
-
6: Check there are no leaks to pan or cistern.
-
7: Check basin is securely fixed to wall.
-
8: Check basin is level and at correct height.
-
9: All drainage waste pipes connected and falls checked.
-
10: check basin waste and service pipework for leaks.
-
11: check protection has been installed to all sanitary ware.
Kitchens.
-
1: Check all waste pipework has correct fall.
-
2: Check sink waste pipe is sound.
-
3: Check washing machine waste has correct fall and is sound( This may be outside of the kitchen ).
-
4: Check to ensure no leaks on service pipes.
-
5: Check non return valves for washing machine/dishwasher are correct way round.
-
6: Check washing machine/dishwasher valves have caps fitted.
-
7: Check no clash of pipework below sink with bins or other fittings within cupboard.
Radiators.
-
1: Check services installed to latest issue mechanical drawings.
-
2: Check setting out positions bathrooms/ensuite are to latest architects setting out drawings.
-
3: Check setting out position for kitchens are to latest kitchen specialist drawings.
-
4: Check Manthorpe box is tight to wall and all screws are tight.
-
5: Check all radiators are level.
-
6: Check all radiators are to the correct height.
-
7: Check radiators are located correctly on the wall brackets.
-
8: Is heating system filled and vented with chemical treatment added.
-
9: Check radiator valves are correct type (TRV / Lock Shield ) and flow is at the top of radiator.
-
10: Check radiators have packaging left on for finals.
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Inspected by sub-contractor.
-
Inspected by wates manager.