Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Position/Area checked
-
Bricklaying contractor
QA's
-
Max overhang of pistol brick no greater than 32 mm
-
First course of bricks (pistol bricks ) in line with the course bellow MSA (or within tolerance)
-
Open perpents per architects detail on top of MSA
-
Brickwork plumb and level
-
Brickwork tied back to substrate with the first tie no higher than 300 mm
-
Bring brickwork up to DPC level check for plumb level and joints as far as practicable 10mm evened out
-
Check the DPC is installed correctly as per drawings provided
-
Correct fire barrier has been installed according to manufacturer instructions (minimum two support brackets, no gaps , 5 mm compression)
-
Cavity tray has been formed and fixed to the substrate with straps
-
Comments
Signatures
-
PSH represantative
-
Contractor represantative