Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Position/Area checked

  • Bricklaying contractor

QA's

  • Max overhang of pistol brick no greater than 32 mm

  • First course of bricks (pistol bricks ) in line with the course bellow MSA (or within tolerance)

  • Open perpents per architects detail on top of MSA

  • Brickwork plumb and level

  • Brickwork tied back to substrate with the first tie no higher than 300 mm

  • Bring brickwork up to DPC level check for plumb level and joints as far as practicable 10mm evened out

  • Check the DPC is installed correctly as per drawings provided

  • Correct fire barrier has been installed according to manufacturer instructions (minimum two support brackets, no gaps , 5 mm compression)

  • Cavity tray has been formed and fixed to the substrate with straps

  • Comments

Signatures

  • PSH represantative

  • Contractor represantative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.