Information
-
Site Name:
-
Conducted on
BTS Fire Alarm Maintenance Certificate
Customer overview
-
Job Number:
-
Site Name:
-
Site Address:
-
BAFE Registration Number - 0032A00002ZAR7g
System Overview
-
I/We being the competent person(s) responsible (as indicated by my/our signatures below) for the servicing of the fire alarm system, particulars of which are set out below, I/We CERTIFY that the said work for which I/We have been responsible complies to the best of my/our knowledge and belief with the recommendations of Clause 45 of BS5839-1:2013 quarterly inspection of vented batteries/periodic inspection and test/inspection and test over a 12 month period, except for the variations, if any, stated in this certificate.
>. Relevant details of the work carried out and faults identified have been entered into the system log book.
The extent of liability of the signatory is limited to the system described below. Extent of the system covered by this certificate -
Variations from the recommendations of Clause 45 of BS5839-1:2013 for periodic or annual inspection and test (as applicable).
-
State the number of false alarms During the past 12 months:
-
The above number of false alarms per 100 automatic fire detectors per annum (for category M systems enter "not applicable") are as follows:
-
Maintenance Visits quarter number:
-
Date Of Last Maintenance Visit?
-
Date Of Next Maintenance Visit
-
System Category?
- L1
- L2
- L3
- L4
- L5
Functional Equipment Testing:
-
FUNCTIONAL EQUIPMENT TESTING BELOW
-
State Battery Voltage (prior to Load Test):
-
State Battery Voltage (After Load Test completed):
-
Control Panels please state Quantity and Type of Panel:
-
Has the control equipment been tested
-
Smoke Detectors please state Quantity and Types:
-
Have all smoke detectors been tested?
-
List the detectors tested:
-
Heat Detectors please state Quantity and Types:
-
Have a minimum of 2% heat detectors been tested?
-
List the detectors tested:
-
Manual Call Points please state Quantity and Types:
-
Have all Manual Call Points been tested?
-
List the device numbers tested:
-
Beam Detectors please state Quantity, Type of Panel and if Tested Yes/No?
-
Flame Detectors please state Quantity, Type of Panel and if Tested Yes/No?
-
Sounders please state Quantity and Type:
-
Have the alarm sounders been tested?
-
Relays, Interfaces please state Quantity, Type of Panel and if Tested Yes/No?
-
HSSD please state Quantity, Type of Panel and if Tested Yes/No?
-
Fixed Extinguishing (Elec) please state Quantity, Type of Panel and if Tested Yes/No?
-
Fixed Extinguishing (Mech) please state Quantity, Type of Panel and if Tested Yes/No?
-
Monitoring Station link, state the type of transmitter:
-
Has the signal to the monitoring station been tested?
-
What type of signal has been received?
- Fire
- Fault
- Clear/Restore
-
Condition Report Test
Supplementary Sheet Checklist EACH VISIT
-
Examine the Log book, all okay? Comments raised?
-
Have you completed the log book?
-
Calculate FA rate: number of FA...........X.............Number of devices divided by 100 Giving FA rate as:
-
Any action required because of FA rate? Please comment below.
-
Is Zone Plan Displayed
-
Are all controls and visual indicators at panel OK?
- Yes
- No
- N/A
-
Are all ancillary functions of the panel OK?
- Yes
- No
- N/A
-
Check all fault indicators and their circuits, where practicable, by simulation of fault conditions OK?
- Yes
- No
- N/A
-
Disconnect the standby battery and simulate a full alarm load, OK?
- Yes
- No
- N/A
-
Examine the batteries and their connections, load test with the mains disconnected OK?
- Yes
- No
- N/A
-
Confirm battery capacity is enough for system?
- Yes
- No
- N/A
-
Are there any remote power supplies on site?
-
Confirm battery capacity within remote power supply (volts & amps)
-
Is the power supply adequate?
-
Confirm what psu and batteries are required:
-
Do all manual call points remain unobstructed, conspicuous and undamaged?
- Yes
- No
- N/A
-
Are there any new exits without the provision of an adjacent manual call point? If so please list below
-
Are there any new partitions within 500mm horizontally of any AFDC? If so please list below.
-
Is there any storage encroaching within 300mm of ceiling such as to compromise compliance? If so lease list below
-
Confirm that a clear space of 500mm is maintained below each AFD otherwise please state below which detectors need moving
-
Have any changes to the use or occupancy of an area made the existing types of AFD unsuitable or prone to unwanted alarms? If so please describe below all changes affecting the fire alarm detection.
-
Do any building alterations or extensions require additional detection / equipment? if so lease state below along with a sketch or media
-
Sketch for any building modifications
-
Test all printers
- Yes
- No
- N/A
-
Check sufficient printer consumables available? List any requirements below.
-
Please state below Details of Work completed/Comments & Additional work undertaken
-
Any other issues conditions also with the installation additions or rectifications required also photos attach on media below
-
Photos here of any issues or areas equipment required etc
Part Transactions:
-
Have parts been used?
-
List materials used including quantities, part description, serial numbers:
-
Are parts required?
-
List parts required including part numbers, voltages etc.
Engineers' Time Sheet a Summary:
-
Enter Date & Time arrived on site:
-
Enter Date & Time off site:
-
Number of on-site hours:
-
Number of travel hours:
Customer Acceptance:
-
Engineers Name on behalf of BTS:
-
BTS Engineer's Signature:
-
Customer Acknowledgement (INPUT NAME): I confirm the satisfactory completion of the above maintenance visit.
-
Customer Job Title:
-
Customer Signature:
Office use ONLY:
-
Closed:
-
Invoiced (where applicable):
-
Actioned by:
-
Date Closed:
BTS Company Details:
-
Building Technology Services 119a Derby Street Burton-on-Trent DE14 2LE Tel:01283 566 977 Email: service@buildingtechnologyservices.co.uk
-
Document Reference Number QD53c, Rev 3, June 2014