version 1

  • Site conducted

  • Site

  • Plot

  • Date

  • Site Manager Signature

  • Prepared by

  • Location
  • Quality Assurance
    Key:
    1. There will be one checklist per plot.
    2. The BQC will be filled out as appropriate. Items are to be logged as pass, fail or N/A, all inspections need to be physically inspected by the Site Management team.
    3. Items must be checked on each plot. These items are integral to the quality and final cost of the plot.
    4. When a stage is complete it must be left clean, free from defects and protected before the next build stage can commence.
    5. Any other quality assurance documents should be retained by the relevant party and handed into the site management team with their final sign off documents.
    6. The checklist needs to be fully completed as part of the handover process.

FOUNDATIONS

  • Check setting out excavation width and depths

  • Check excavation is dug to line and level

  • Check concrete level steps if required and thickness

  • Picture required of foundation excavation

  • Check concrete mix, spec and strength in accordance with design. Cube test to be available

  • For non standard strip foundations lease refer to site specific details

  • CALL OFF BUILDING CONTROL

  • Site Manager Signature

  • Contractors signature

SUB-STRUCTURE MASONARY

  • Check foundations are clean and free from standing water

  • Check wall is centred of foundation

  • Check setting out dimensions line and level, quality of brickwork

  • Check brick and block type used is correct

  • Check provision of services and drainage positions, ensure 50mm clearance around drains

  • Check position of cavity vents and air vent trunks.

  • Site Manager Signature

  • Contractors signature

OVERSITE

  • check duct and internal drainage are correctly positioned

  • Check depth of ballast fill and compaction

  • Check insulation and DPC under floor membranes are correctly positioned

  • Check membranes are installed as specification for air tightness

  • Check reinforcement if applicable, is correctly placed

  • Check threshhold detail is constructed correctly

  • Check concrete quality level and finish

  • Site Manager Signature

  • Contractors signature

DRAINAGE

  • Check position of manholes and connections

  • Check all pipes are laid to correct fall

  • Check all pipes are bedded and have adequate cover of aggregate or concrete

  • Check positions back fill and depth of service ducts

  • Check back fill and compaction

  • Check open ends of manholes are sealed and left clean

  • Picture of drainage at inspection is required.

  • Site Manager Signature

  • contractors signature

  • Location

READY FOR ERECTION TEAM

  • Check plot is ready to commence erection of panels

  • Floors level

  • walls plumb

  • house erected to detail and within tolerances.

  • Site Manager Signature

  • Contractors signature

  • Location

ROOF

  • Insulation is tight fitting between boards and permitter and fully adhered to roof deck

  • Horizontal Membrane free from damage and tight fitting

  • Welds are neat and tidy and have no lifting corners or holes

  • Gutters are free from debris, outlets have filter grills installed and drain effectively

  • Vertical membrane rises at least 150mm above the deck below. Has mechanical fixing points along the top.

  • Breather membranes lap over the top of vertical membranes but are cut 20mm short of the finished roof level.

  • Roofs have been left clear of materials, off cuts and screws. Gutters are clear of any build up

  • Roofs have been independently tested and certified

  • Ensure that the parapet cappings & support brackets are installed fully in accordance with manufacturers details, inc fixings to sub-frame, connection details/fully engaged, min 1mm joint between per 1m length (3mm for full 3m lengths), and fully sealed with low modulus sealant at all joint to bracket connections

  • Site Manager Signature

  • Contactors signature

  • Location

FIRE STOPPING

  • Location
  • Checklist TBC

SUPERSTRUCTURE

  • Edge protection fitted to atrium, window openings and stairwell.

  • all panels fitted correctly within tolerances of plumb and level 10mm over 1 story height

  • Location

STAIR WALL PLASTER BOARD

  • all boards fitted correctly and ready for stairs

1st FIX

1st FIX JOINERY

  • Temporary cassettes removed and half height wall built

  • Stairs fully fixed (No movement when in use) & glue residue removed

  • All perimeter wall lats plumb and square (**Double below window)

  • Window plaster reveals square and plumb

  • Plasterboard hatch installed on all levels

  • Pattresses for stair handrails (stair wall pattresses also included in party walls. 75mm screws used, so handrail fixed to both pattress and OSB) and kitchen units installed.

  • Internal door heights as per project schedule. Internal door 2100mm, HT1 2265mm

  • Kitchen critical wall dims checked in line with kitchen layout drawing

  • Check fixing of internal partition walls, appropriate noggins, ceilings and window boards with appropriate protection in place

  • Ensure racking panels are fitted to specification

  • Check all room partitions are square, plumb and the dimensions are correct

  • Check fixing of all door linings

  • Check square and size of boxings

  • Check fixing of external door frame, ensure sill protection is in place

  • Site Manager Signature

  • Contactors signature

  • Location

1st FIX PLUMBING

  • FW & SW stack installed, clipped every 1.8m, location dims checked as per 1:25 layout.

  • MVHR ducting installed as per 1:25 layouts and supported to avoid dropping below joists

  • Bathroom ‘Abacus’ frame fit plumb and square

  • Drainage air pressure test complete to all foul stacks

  • Cylinder loaded into plot bathroom

  • Kitchen plumbing dimensions in line with kitchen layout

  • Fire collars installed floor to floor

  • Check drill holes in joists are positioned in accordance with manufacturers guidelines

  • Check fixing and fall of waste pipes/SVPs

  • Check fixing of surface pipework

  • Check open end pipework are sealed with tape

  • Check installed pipes are separated with insulation

  • Check installation of shower tray/Bath and that protection is fitted

  • Check connection of SVPs/durgos

  • Check that air pressure test has taken place

  • Site Manager Signature

  • Contactors signature

  • Location

FIRST FIX ELECTRICAL

  • Incoming services as per plot 1:25 small power layout/ducts in/kitchen island power.

  • Distribution board installed as per layout with all glands fitted.

  • All sockets/switch cables to correct length, level, line

  • 300mm spacing smoke detector to an other obstruction, wall, light, etc.

  • Critical dims checked e.g. kitchen socket and switch cables (Grid switch).

  • External cables installed as per 1:25 small power and aligns with external plan.

  • Skylight chain on and tested

  • Noggins installed – pack out where double boarded

  • Check position and neatness of drill holes in joists

  • Check back boxes are level and correctly fixed

  • check putty is fitted to back boxes

  • Check general position of lights sockets and switches is consistent

  • Check wires are clipped and in correct safe zones

  • Check duct position and fixings

  • Check ducts are as spec, level, straight and the integrity of the MVHR is not compromised

  • Check panel heater tail positions

  • Arrange and carry out EXTRAS Checks with Sales

  • Ensure all relevant protection and identification are in place

  • Site Manager Signature

  • Contactors signature

  • Location

1st FIX HOUSEKEEPING

  • □ Plots to be free from material and debris. <br><br>□ Sole plates cut out for doorways. <br><br>□ Front door packed up 18mm min.<br><br>□ Ladders and smokes returned to site cabin<br>

PLASTER BOARDING & FINISH

  • Walls checked for level +/- 4mm over 2m, max 8mm over larger elevations

  • Stairwell wall, no steps in boards (tapered to tapered).

  • Half height wall, single board to be used, no cuts

  • Chamfered cuts to underside of treads and risers on stairs.

  • Accurate cuts to sockets, switches, and openings

  • Internal door reveals , cut plasterboard flush to timber opening.

  • Door/patio reveals, enough space left to allow skirtings to fit within reveal.

  • All cut outs in place to suit services and within 2mm

  • Critical level checks: top of bathroom walls, screen wall, kitchen wall, lightwell wall. Level.

  • Gaps to base of plasterboard 5mm.

  • Boarding installed as per plasterboard plan and installed in line with suppliers specification.

  • Check walls, reveals and boxings are square, plumb and the dimensions are correct

  • Check electrical boxes are left exposed correctly and neatly finished around.

  • Check finish of plastering/tape & jointing

  • Check there are no visible board joints

  • Check finish around sockets, window cills, pendants.

  • Conduct Plaster snag.

  • Sub Contractor Signature

  • Site Manager Signature

  • Location

SECOND FIX CARPENTRY

  • Floor level +/- 5mm

  • Skirting mitred, sanded and square

  • Casing & architrave, mitred, sanded and square

  • Window boards level with equal margins

  • Stairs fully fixed, free from glue and gaps

  • Bath and shower tray frames fit

  • Trims fit and skylight cover piece on

  • Doors latch, no rattle & max 4mm gaps

  • Bathroom locks function

  • Half height glazing secure, level, no gaps

  • Stringers filled and sanded

  • Boxings complete

  • Timber floor – 10mm expansion, no gaps, skirting square, direction correct

  • Check hanging of doors is correct with right margins.

  • Check bathroom mirror reveals

  • Check window boards

  • Site Manager Signature

  • Squad Leader Signature

  • Location

SECOND FIX PLUMBING

  • Sink and dishwasher in kitchen connected

  • Sanitary ware installed, fixed and level

  • Water on and tested

  • Cylinder and MVHR installed

  • Certificates complete

  • Pipes clipped and systematically

  • MVHR grey tape over green tape.

  • Dishwasher waste fitted correctly

  • Shrouds fitted to all pipe penetrations

  • Sinks fitted level

  • shower/bath screen fitted.

  • Check labelling to cylinder

  • Site Manager Signature

  • Squad Leader Signature

  • Location

SECOND FIX ELECTRICAL

  • Smoke alarms 300mm min spacings.

  • Lights line through

  • Sockets level and centralised if stacked

  • All pips fitted to sockets and switches.

  • Screws at 3 & 9.

  • Skylights connected and tested

  • Power on and certs complete

  • Grid switch checked for function

  • External works complete

  • Fit edge router

  • Panel radiators level, wire cut to length

  • Hob and dishwasher wired up.

  • Understairs cupboard switches labelled

  • Check property has been installed as per design and spec

  • Check fixings of sockets and pendants

  • Check fitment of MVHR vents

  • Check fitment of consumer unit

  • Squad Leader Signature

  • Site Manager Signature

  • Location

KITCHEN

  • Kitchen units fit plumb and square

  • Tall units scribed to wall as required.

  • Units open and close correctly.

  • All shelves fit and undamaged.

  • Oven screwed back.

  • Caps, covers, seals, pips and pipes in place.

  • Supports in place for worktop

  • Plinth fit, cut out for fridge/freezer complete

  • Tall unit door without bows, ensure 3 hinges are fitted.

  • All units and spacings, line through and consistent.

  • Cables brought through in correct units, cut outs neat and tidy.

  • Integrated fridge/freezer doors don’t catch.

  • Refer to kitchen drawing

  • Check kitchen is fitted to Manufacture's drawings

  • Check protection is installed

  • Check under sink base unit is correctly fitted as per specification

  • Contractor Signature

  • Site Manager Signature

  • Location

CERAMIC TILING

  • Check for correct spec.

  • Check quality of grouting

  • Check preparation of floor prior to floor tiling see specification

  • Check pipes are left neatly exposed and finished off

  • Check tiles are in line level and symmetrical

  • Contractor Signature

  • Site Manager Signature

  • Location

Decoration

  • Preparation work complete ahead of decoration (no variations where obvious prep wasn’t complete)

  • Caulk to all woodwork as required

  • 3 coats of Osmo to all birch plywood, with light sand between coats

  • □No obvious cutting-in or flashing to walls.

  • Tops of doors painted

  • No paint on fixtures and fittings

  • Internal glazing unit to be fully decorated. Frame to be painted before glazing is fitted.

  • Beneath window boards fully decorated

  • Cupboards to same standard as houses.

  • Attention to detail in tricky areas – under sinks, kite winders, etc.

  • Carry out paint snag

  • Check preparation such as filling and rubbing down

  • Check quality of paintwork

  • Check paintwork to frames skirting boards and architraves

  • Check finish to doors

  • Check fitments and fixing are free from paints splashes

  • Site Manager Signature

  • Contractors Signature

  • Location

FINAL FIX

  • Check fitment of bath panels shower screens

  • Check final floor finishes

  • Check if doors are operational

  • Check fitment of ironmongery

  • Check if door stoppers are in place

  • Check all fire doors are fitted correctly, no more than 4mm margin

  • Check internal mastic is completed

  • Check for micro cracking & signs of excessive drying out

  • Squad Leader Signature

  • Site Manager Signature

  • Location

APPLIANCES AND WHITE GOODS

  • Check correct appliances are installed and protected

  • Test appliances

  • Check manuals/instructions are in place for the customer

  • Site Manager Signature

Timber Batten System

  • All battens are the correct size and grade of timber

  • Set out correctly, even margins and balanced between openings

  • All vertical battens are securely fastened and plumb

  • All horizontal battens are securely fastened and level

  • All battens installed with the correct fixings, and the correct spacing/centres and not overtightened.

  • Battens do not over-sail the panels around doors and windows. Battens should not be visible in these areas once cladding is installed.

  • Pattresses for front door light fitting installed

  • Breather membranes are intact upon completion with the correct directional lap (top over bottom)

  • DPM is lapped correctly at base of cladding

  • <br>Pattresses not installed for external lights – this needs to be addressed and rectified by the cladding S/C<br>

  • Check with accordance to Manufacturer's details

  • Sub Contractors Signature

  • Site Manager Signature

  • Location

Cavity Breaks and Barriers

  • Vertically to the full height of every party wall line, fixed at each side of the party wall junction

  • At party floor lines – horizontal

  • Around all edges of windows and door openings (vertical & horizontal)

  • At the base of the cavity – horizontal

  • Around MVHR outlets – vertical and horizontal

  • At the head of the cavity – horizontal

  • At and cladding breaks to rainwater goods – horizontal

  • packers must not be used to maintain the integrity of the full fill barriers

  • check depth of cavity relative to tape spec depth (intumescent spec/depth) & ensure any allowance is made for packing of battens

  • barriers must not be penetrated by horizontal or vertical rails/battens & joints/junctions to be sealed where specified by supplier

  • ensure that the correct fixings and quantities/spacings are utilised

  • Sub Contractors Signature

  • Site Manager Signature

  • Location

Flashings & Insect Mesh

  • Ground floor doorways (front doors, patio doors) have a steel flashing closing the cavity to both jambs and head (min thickness 0.5mm)

  • □ Insect mesh is installed over the bottom horizontal batten/rail at every horizontal break in the cladding:<br>o Window cill and head<br>o Top of cladding elevation <br>o Bottom of cladding elevation <br>

  • Site Manager Signature

Metalwork

  • Juliette balcony brackets installed

  • Front door canopy brackets installed

  • Handrail installed on roof terrace parapet (if applicable)

  • Counterbalance balustrade installed on roof terrace (if applicable)

  • Site Manager Siganture

CLADDING

  • All panels are securely fastened in accordance to manufactures guidance

  • All panels are level and plumb

  • All panels are installed to the correct layout with consistent gaps between panels

  • Fixings are neat where visible (SVK tiles) consistent in fixing and positions

  • Fixings are hidden (Rockpanel, Patina, Swiss Pearl)

  • Contractor Signature

  • Site Manager Signature

  • Location

Rainwater goods & flashings

  • All rainwater pipes are securely installed

  • All rainwater hoppers are securely installed

  • All rainwater pipes are securely connected to hopper

  • □ PPC aluminium flashings are securely installed in the following locations:<br>o Breaks between cladding types <br>o Either side of rainwater goods <br>o Parapet capping and corners <br>o Corners <br>o Base plinth detail <br>

  • Ensure that the parapet capping's & support brackets are installed fully in accordance with manufacturers details, inc fixings to sub-frame, connection details/fully engaged, min 1mm joint between per 1m length (3mm for full 3m lengths), and fully sealed with low modulus sealant at all joint to bracket connections.

  • Site Manager Signature

Envelope Handover

  • Cladding panels are all scratch and damage free

  • Elevations and clean and free of dust

  • Photographic record of hold points

TESTING

  • Electrical Plumbing /Drain tests are carried out

  • All plot labelling complete

  • Commission mvhr extractors

  • Copies of all test cert available.

  • pictures required of test certs.

  • Site Manager Signature

EXTERNALS

  • external works drawing

  • Check Decking, Letter box & entrance plate are installed and positioned correctly

  • Optional picture of external works to clarify external layout.

  • Check gates and latches work correctly if applicable

  • Check external mastic is completed

  • Check any external fire stopping is complete i.e under croft parking.

  • Check fire mastic is completed to any penetrations are highlighted

  • Check landscaping quality

  • Check bike shed location and fitment

  • Check pathway quality and free from debris

  • Check external drainage is as per design

  • Check manhole lids are secure and rodding eyes are accessible

  • Check appropriate signage is in place

  • Check all external lighting is in place

  • Site Manager Signature

  • Location

BUILD COMPLETE

  • BUILDING CONTROL COMPETE

  • BUILD COMPLETE TO CITU STANDARDS

  • Site Manager Signature

COMPLETION

  • Book pre completion inspection

  • Back check pre completion inspection

  • CUSTOMER READY

  • Completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.