Building Commissioning Checklist

HVAC

Thermometers and gauges

Vibration isolation

Steam condensate system

Hot water heating systems

Computer room HVAC systems

Chemical water treatment systems

Chillers

Cooling towers

Condenser water system

Air terminal unit systems, VAV, PIU, etc.

Humidifiers

Duct silencers

Dampers

Variable frequency drives and motors

Air distribution systems

Exhaust air systems

Trend logs

Network communication

Test and Balance verification

Refrigeration equipment and controls

Chilled Water System

Building Envelope

Roofing system – water-proofing, insulation, roof membrane, rain and ice shield, pitch, coping, flashing, curbs for mechanical equipment, downspouts, drains, scuppers

Exterior skin – curtainwall, storefront, masonry, brick/stone veneers, precast panels, metal panels, stucco / EIFS, siding

Walls – vapor barriers, insulation, mortar nets, weeps, joints, sealants, masonry ties

Slab on grade – vapor barriers, water-proofing, drainage, foundation drains

Doors and windows – sealants, mechanical operation, sills, flashing, end dams, hardware

Water tests, mockups, wind loads, thermal infiltration

Special design features – dome, cornice, canopy, skylight, etc.

Electrical

Service switchgear

Emergency power system

Generators

Lighting controls (scheduled activators and occupancy sensors)

Daylight dimming controls

Lighting - exterior

Lighting - interior

Switchboards

Distribution panel boards

Motor Control Centers

Power monitoring and metering

Transient voltage surge suppressors

Variable frequency and speed drives

Grounding and ground fault systems

Over-current protective devices

Low voltage bus ways

Themiographic survey

Paging system and security

ATS auto transfer switches

Buss duct and tap devices

Fire alarm and smoke detectors

Standby and emergency power systems

Emergency lighting

Security systems

Electrical primary voltage system

Transformers

Plumbing

Cleaning / flushing water systems

Trap primers

Vibration isolation

High purity water system

De-ionized water system

Thermometers and gauges

Irrigation systems

Water filtration (general use)

Domestic hot water systems

Tempered water systems

Fuel oil / gas systems

Potable water and booster pump systems and electors

Backflow preventers and relief valves

Is retro-commissioning performed?

Retro-commissioning

Compressed air system

Steam condensate system

Not water heating system

Computer room HVAC system

Chemical water treatment system

Chillers

Cooling towers

Air terminal unit systems, VAV, PIU. AHU, etc.

Humidifiers and controls

Dampers

Variable frequency drives and motors

Air distribution systems

Exhaust air systems and building pressurization controls

Building automation systems, including controlled devices, sensors, control loops, and logic

Lighting controls (scheduled activators and occupancy sensors)

HVAC DX systems

Domestic hot water systems

Completion

Additional Comments

Inspector Name & Signature
Supplier Name & Signature
Contractor Name & Signature

Building Commissioning Checklist

Created by: SafetyCulture Staff | Industry: General | Downloads: 2

A building commissioning checklist aims to assess the HVAC, electrical, plumbing, and building envelope systems and perform retro-commissioning as needed. Use this checklist to determine if the efficiency of existing equipment and systems of a building should be improved and create corrective actions that send and receive real-time notifications when complete, in progress, or still to do.

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Building Commissioning Checklist

HVAC

Thermometers and gauges

Vibration isolation

Steam condensate system

Hot water heating systems

Computer room HVAC systems

Chemical water treatment systems

Chillers

Cooling towers

Condenser water system

Air terminal unit systems, VAV, PIU, etc.

Humidifiers

Duct silencers

Dampers

Variable frequency drives and motors

Air distribution systems

Exhaust air systems

Trend logs

Network communication

Test and Balance verification

Refrigeration equipment and controls

Chilled Water System

Building Envelope

Roofing system – water-proofing, insulation, roof membrane, rain and ice shield, pitch, coping, flashing, curbs for mechanical equipment, downspouts, drains, scuppers

Exterior skin – curtainwall, storefront, masonry, brick/stone veneers, precast panels, metal panels, stucco / EIFS, siding

Walls – vapor barriers, insulation, mortar nets, weeps, joints, sealants, masonry ties

Slab on grade – vapor barriers, water-proofing, drainage, foundation drains

Doors and windows – sealants, mechanical operation, sills, flashing, end dams, hardware

Water tests, mockups, wind loads, thermal infiltration

Special design features – dome, cornice, canopy, skylight, etc.

Electrical

Service switchgear

Emergency power system

Generators

Lighting controls (scheduled activators and occupancy sensors)

Daylight dimming controls

Lighting - exterior

Lighting - interior

Switchboards

Distribution panel boards

Motor Control Centers

Power monitoring and metering

Transient voltage surge suppressors

Variable frequency and speed drives

Grounding and ground fault systems

Over-current protective devices

Low voltage bus ways

Themiographic survey

Paging system and security

ATS auto transfer switches

Buss duct and tap devices

Fire alarm and smoke detectors

Standby and emergency power systems

Emergency lighting

Security systems

Electrical primary voltage system

Transformers

Plumbing

Cleaning / flushing water systems

Trap primers

Vibration isolation

High purity water system

De-ionized water system

Thermometers and gauges

Irrigation systems

Water filtration (general use)

Domestic hot water systems

Tempered water systems

Fuel oil / gas systems

Potable water and booster pump systems and electors

Backflow preventers and relief valves

Is retro-commissioning performed?

Retro-commissioning

Compressed air system

Steam condensate system

Not water heating system

Computer room HVAC system

Chemical water treatment system

Chillers

Cooling towers

Air terminal unit systems, VAV, PIU. AHU, etc.

Humidifiers and controls

Dampers

Variable frequency drives and motors

Air distribution systems

Exhaust air systems and building pressurization controls

Building automation systems, including controlled devices, sensors, control loops, and logic

Lighting controls (scheduled activators and occupancy sensors)

HVAC DX systems

Domestic hot water systems

Completion

Additional Comments

Inspector Name & Signature
Supplier Name & Signature
Contractor Name & Signature