Building Commissioning Checklist

HVAC

  • Thermometers and gauges

  • Vibration isolation

  • Steam condensate system

  • Hot water heating systems

  • Computer room HVAC systems

  • Chemical water treatment systems

  • Chillers

  • Cooling towers

  • Condenser water system

  • Air terminal unit systems, VAV, PIU, etc.

  • Humidifiers

  • Duct silencers

  • Dampers

  • Variable frequency drives and motors

  • Air distribution systems

  • Exhaust air systems

  • Trend logs

  • Network communication

  • Test and Balance verification

  • Refrigeration equipment and controls

  • Chilled Water System

Building Envelope

  • Roofing system – water-proofing, insulation, roof membrane, rain and ice shield, pitch, coping, flashing, curbs for mechanical equipment, downspouts, drains, scuppers

  • Exterior skin – curtainwall, storefront, masonry, brick/stone veneers, precast panels, metal panels, stucco / EIFS, siding

  • Walls – vapor barriers, insulation, mortar nets, weeps, joints, sealants, masonry ties

  • Slab on grade – vapor barriers, water-proofing, drainage, foundation drains

  • Doors and windows – sealants, mechanical operation, sills, flashing, end dams, hardware

  • Water tests, mockups, wind loads, thermal infiltration

  • Special design features – dome, cornice, canopy, skylight, etc.

Electrical

  • Service switchgear

  • Emergency power system

  • Generators

  • Lighting controls (scheduled activators and occupancy sensors)

  • Daylight dimming controls

  • Lighting - exterior

  • Lighting - interior

  • Switchboards

  • Distribution panel boards

  • Motor Control Centers

  • Power monitoring and metering

  • Transient voltage surge suppressors

  • Variable frequency and speed drives

  • Grounding and ground fault systems

  • Over-current protective devices

  • Low voltage bus ways

  • Themiographic survey

  • Paging system and security

  • ATS auto transfer switches

  • Buss duct and tap devices

  • Fire alarm and smoke detectors

  • Standby and emergency power systems

  • Emergency lighting

  • Security systems

  • Electrical primary voltage system

  • Transformers

Plumbing

  • Cleaning / flushing water systems

  • Trap primers

  • Vibration isolation

  • High purity water system

  • De-ionized water system

  • Thermometers and gauges

  • Irrigation systems

  • Water filtration (general use)

  • Domestic hot water systems

  • Tempered water systems

  • Fuel oil / gas systems

  • Potable water and booster pump systems and electors

  • Backflow preventers and relief valves

  • Is retro-commissioning performed?

Retro-commissioning

  • Compressed air system

  • Steam condensate system

  • Not water heating system

  • Computer room HVAC system

  • Chemical water treatment system

  • Chillers

  • Cooling towers

  • Air terminal unit systems, VAV, PIU. AHU, etc.

  • Humidifiers and controls

  • Dampers

  • Variable frequency drives and motors

  • Air distribution systems

  • Exhaust air systems and building pressurization controls

  • Building automation systems, including controlled devices, sensors, control loops, and logic

  • Lighting controls (scheduled activators and occupancy sensors)

  • HVAC DX systems

  • Domestic hot water systems

Completion

  • Additional Comments

  • Inspector Name & Signature

  • Supplier Name & Signature

  • Contractor Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.