Title Page

  • Site Name and Building name

  • Conducted on

  • Prepared by

  • Location
  • Is DC cable roughed in from the roof to inverter location in HD conduit as Per AS5033

  • Is AC Cable roughed in from Inverter Location to Switchboard

  • Are Solar framing footing installed i.e L feet, Klipok or Tilt legs

  • Are rails fixed to footings

  • Are joiners and earthing lugs installed

  • Solar Panel Make and Model

  • How many panels are installed

  • Are panels mid and End Clamps secured

  • How may roof top isolators are installed

  • What is the make and model of the inverter

  • Does Inverter have minimum clearance for Heat Dissipation as per inverter's installation manual

  • Is both AC and DC cables fit off to inverter terminals

  • Is AC Cable from inverter fit off to the Switchboard

  • Is system larger then 30kWp

  • Is Grid Protection relay installed at MSB

  • Is Relay wired to Solar Circuit Breaker / Contractor

  • Is relay tripping contractor when it should be

  • Has commissioning been completed as per the Clean Energy Councils commissioning checklist

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.