Background Information
General Information
-
Audit Title
-
Client & Address
-
Conducted on
-
Personnel Involved
-
Auditor's Name and Job Title:
-
Auditor's signature:
Executive Summary
Executive Summary
Staffing
Staffing & Operational Information
-
What is the current NG Bailey staffing at the building?
-
Are any of the NGB staff currently pregnant, or recently returned from maternity leave?
-
If yes, are appropriate NEM risk assessments in place?
-
Have NGB staff undergone a SHEQ Induction?
-
Have NGB staff undergone a building induction?
-
What are the normal working hours for NG Bailey staff at the building?
-
If staff are working permanent nights, have they undergone any health screening?
-
Are Agency staff used at the building?
-
Have Agency staff been given a building induction, and have they signed the acknowledgement forms?
Personal Protective Equipment
PPE Provision
-
Have all Engineers been provided with appropriate PPE?
-
Is the PPE provided appropriate for the hazards at the building?
-
Is the PPE in a serviceable condition?
-
Is any job-related PPE issued to the team?
-
Additional job-related PPE needed:
Training Records
Training/Competency
-
Has a training matrix been produced for the staff at the building?
-
Are the Contract Manager & Supervisors aware of Engineers competencies?
-
Are toolbox talks being carried out?
-
Are Safety Talks Attendance Sheets being signed by the attendees?
-
Are there any additional training requirements identified?
Safety Information Documentation
General Administration Issues
-
Are NGB provided with an office or administration area in the building?
-
Is the this area solely for the use of NGB?
-
Is there an NGB safety noticeboard in the building?
-
Is the correct information shown on the H&S Law Poster?
-
Is the current HS&E Policy Statement displayed?
-
Are current BOSS documents available either on display or in folders?
-
Are the current Insurance Certificates displayed?
-
Are Fire Safety procedures, including Assembly Point information, displayed?
-
Are any of the NG Bailey staff First Aid trained?
-
Is First Aid information displayed?
-
How can staff obtain First Aid assistance should it be needed?
-
Are First Aid kits easily available?
Risk Assessments & Method Statements
Hazard and Risk Management
-
Has the Client or Landlord provided a hazard register for the building?
-
Have all Restricted Access/Confined Spaces been identified and entered on the register?
-
Are NGB generic risk assessments available at the building?
-
Have any task/building specific risk assessments been produced, in relation to work activities at the building?
-
Have all risk assessments been reviewed by the Contract Manager/Supervisor for the current year?
-
Have the risk assessments been brought to the attention of the Engineers?
-
Are dynamic risk assessment pads available?
-
Are Engineers confident in completing dynamic risk assessments when needed?
-
Are the correct PtW pads available at the building?
-
Are PtW's being correctly completed by both NGB and the Contractors?
Asbestos Management
Asbestos Management
-
Is asbestos known, or presumed, to be present in the building(s)?
-
Has an asbestos survey been undertaken?
-
Is there an Asbestos Management Plan in place?
-
Is the Asbestos Management Plan reviewed periodically?
-
How are staff provided with information regarding asbestos?
-
Have NGB Engineers undergone UKATA Asbestos Awareness training within the last 3 years?
-
Are staff aware of what action to take if they come across something they suspect may be asbestos?
Working Environment & Welfare Provision
Office and Welfare Provision
-
Is an office or administration facility provided at the building?
-
Picture:
-
If yes, how many people normally work full-time in the office?
-
Is the area solely for the use of NG Bailey?
-
Does the area have a source of natural light?
-
Is a separate office and/or restroom provided for Engineers?
-
Do office staff use DSE?
-
Have office staff undertaken DSE self-assessments?
-
Is the office lighting suitable?
-
Is the temperature in the office suitable/reasonable?
-
Is drinking water provided (either tap or bottled)?
-
Are suitable toilet facilities, relatively close to the office, provided?
-
Are separate male and female toilet facilities provided?
-
Are Sani-bins provided in toilet facilities used by female staff?
-
Are changing facilities, with secure lockers, provided for staff who need them?
-
Are showers available for NG Bailey staff to use if desired?
-
Are the office/administration areas cleaned regularly?
-
Are kitchen/rest room facilities provided?
-
Picture:
-
Are the kitchen/restroom facilities provided solely for the use of NG Bailey staff?
-
Are kitchen/restrooms being kept clean and tidy?
-
Are the office/kitchen areas free of visible evidence of vermin infestations?
-
Picture:
-
Are pest or vermin infestations in the building being dealt with?
-
General view of plant rooms:
-
General view of roof plant areas:
Fire Prevention & Safety Precautions
Fire Safety Management
-
Is a copy of the Client's Fire Risk Assessment available in a suitable format?
-
Are NG Bailey responsible for the testing of the fire alarm?
-
Is there a Fire Log Book at the building?
-
Where is the Fire Log Book located?
-
Are all relevant test results being recorded in the Fire Log Book?
-
Are Fire Action Notices displayed throughout the building?
-
Are the correct details shown on the Fire Action Notices?
-
Are staff aware of what do in the event of a fire alarm activation?
-
Do the NGB Engineers have any specific duties if there is a fire alarm activation?
-
Are fire extinguishers provided throughout the building?
-
Are the fire extinguishers provided suitable for the fire hazards present in the building?
-
Have all fire extinguishers been serviced and had colour-coded tags affixed?
-
Have NGB staff had training in the safe use of fire extinguishers?
-
Is there a gas-flood fire extinguishing system in the building?
-
Is there a clear process in place to ensure the gas-flood system is set to manual while staff work in the room
-
Is the fire alarm system serviced as required?
-
Is the emergency lighting system maintained as required?
Housekeeping & Waste Management
Waste Management
-
Are separate waste/recycling bins provided for various waste streams, i.e. food waste, plastics, paper, etc.?
-
Is waste and rubbish being placed in the appropriate receptacles?
-
Is rubbish and waste being recycled appropriately?
-
Is waste food being disposed of correctly?
Storage Areas
Workshop/Storage Areas
-
Is a workshop and/or storage area provided for NGB use, at the building?
-
Picture:
-
Is the workshop/storage area being kept tidy?
Statutory Compliance
Statutory Compliance Records
-
How are maintenance records stored?
- Hard copy in folders
- Electronically
- No records could be found at the building but may be held elswhere
- No records were available
-
H & S policy statement dated:
-
Employers liability certificate dated:
-
Fixed electrical wiring test certificate dated:
-
Portable appliance testing dated:
-
Dry riser annual test certificate dated:
-
Wet riser annual test certificate dated:
-
Air receiver annual test dated:
-
Water treatment annual risk assessment dated:
-
Written Scheme for the water system dated:
-
Emergency lighting annual test certificate dated:
-
Landlords gas test certificate (boiler 1) dated:
-
Landlords gas test certificate (boiler 2) dated:
-
Landlords gas test certificate (boiler 3) dated:
-
Landlords gas test certificate (boiler 4) dated:
-
Asbestos Management Plan last review date:
-
Eyebolt test certificates dated:
-
Fire alarm annual test certificate dated:
-
Date of last fire drill:
-
Fire extinguisher annual service dated:
-
Sprinkler system annual test certificate dated:
-
Fall protection/Latchway system periodic test certificate dated:
-
Lightning conductor annual test certificate dated:
-
BMU periodic inspection dated
-
Pollution Incident Response Plan test scenario completed on:
Contractor Documentation
Contractor Management
-
Are Contractor's files maintained?
-
Are copies of Contractors' H&S Policies, and current Employers Liability Certificates held on file either in the office, or on My Supply Chain
-
Are Contractors generic RAMS held on file?
-
Are task-specific RAMS being provided by the Contractors where required?
-
Is there a process to ensure that Contractor's RAMS are reviewed and approved by a competent person prior to the commencement of works?
-
Are Permits to Work being issued to Contractors prior to the start of the works?
-
Are the Permits to Work being completed correctly by both NGB and the Contractor?
-
Is the Permit to Work Register being kept up to date and all Permits accounted for?
-
Are all Permits being closed down correctly by both NGB and the Contractor?
-
Is there a documented process to provide Contractors employees with a site induction before they commence their work activities?
CoSHH Management
Management of Hazardous Substances
-
Are hazardous substances in use at the building?
-
Is a hazardous substances inventory available?
-
Are hazardous substances kept in a lockable store or cupboard?
-
Are the MSDS's for the hazardous substances available?
-
Are COSHH Assessments available for all hazardous substances in use?
-
How is information about the safe use of hazardous substances passed on to the Engineers?
-
Is PPE, suitable for the substances in use, provided?
-
Is the PPE stored separately from the hazardous substances?
Work Equipment
Work Equipment
-
Is NGB-supplied work equipment in use at the building?
-
What equipment is provided?
-
Are the correct guards fitted to equipment?
-
Have staff been trained to use the equipment provided?
-
Are step ladders in use at the building?
-
Are ladders in use at the building?
-
Are all steps and ladders marked with an individual ID number?
-
Are steps and ladders subject to regular recorded inspections?
-
Were the steps and/or ladders seen, in good condition?
-
Is test equipment or a proving unit held on site?
-
Are calibration records available for equipment which require them?
-
Are all calibration dates current?
Working at Height
Working at Height
-
Are Engineers able to complete all work activities without the need to work at height?
-
Are any fixed vertical ladders subject to periodic inspection, and have scafftags affixed?
-
Picture:
-
Are fixed vertical ladders plated off or secured in another way to prevent unauthorised access?
-
Picture:
-
Is suitable edge protection provided around the perimeter of the roof(s)/work areas?
-
Picture:
-
Is the roof edge protection subject to documented periodic inspections?
-
Are Engineers able to undertake working on roofs without the need to wear safety harnesses & lanyards?
-
Have Engineers been provided with suitable training in the safe use of harnesses and lanyards?
-
Are harnesses and lanyards subject to periodic visual and tactile inspections?
-
Is there equipment on the roof (phone masts, satellite dishes, microwave transmitters etc.) which may emit electromagnetic radiation?
-
Picture:
Use of Portable Access Equipment
Mobile Tower Scaffolds
-
Is there a mobile tower scaffold available at the building?
-
Is the mobile tower scaffold an NGB or client owned item?
-
Do the NGB staff hold appropriate PASMA certification?
-
Are mobile tower scaffolds subject to documented periodic inspection?
Use of Powered Access Equipment
Powered Access Equipment
-
Is a MEWP available at the building?
-
Is the MEWP NGB or client owned?
-
Do the NGB staff hold appropriate IPAF certification?
-
What classes are covered by the IPAF certification held by NGB staff?
-
Are documented pre-use checks carried out on the MEWP(s)?
Noise Related Issues
Noise Management
-
Are there work areas in which noise levels are elevated?
-
In which areas are elevated noise levels apparent?
-
Have the noise levels been measured?
-
What were the noise levels recorded?
-
Are suitable 'Hearing Protection Zone' signs displayed?
-
Are Engineers provided with suitable ear protection?
-
Are disposable ear plugs available in plant rooms/areas?
-
Is the ear protection being worn when needed?
-
Have Engineers been provided with Occupational Health questionnaires?
-
If yes, what follow-up action has been taken?
Lone Working
Lone Working
-
Are there always other persons available in the building when Engineers are at work?
- Yes
- Building Security would always be available
- No
-
If no, how can the Engineers get assistance should they need it?
-
How do the Engineers keep in contact with colleagues or other persons?
-
Are there any activities that may NOT be undertaken without a second person in attendance?
Electrical Safety
Management of Electrical Hazards
-
Are there competent Electricians as part of the Engineering team?
-
Do all Engineers understand the procedure for electrical isolations?
-
Do all Engineers understand the term 'proven dead'?
-
Are all Engineers confident in the use of testing and proving equipment?
-
Are LOTO kits available?
-
Are there any Approved Persons in the Engineering Team?
-
Is there an HV Switchroom in the building?
-
Are any of the Engineers authorised as an HV AP?
-
Is PAT testing carried out on NGB equipment?
-
Is the fixed electrical equipment inspected as required?
Water Hygiene Management
Water Hygiene Management
-
Is there a Water Treatment Log Book on site?
-
Is there a nominated specialist Water Treatment contractor?
-
Are the relevant Responsible Persons identified in the Management Section of the Log Book?
-
Is the scope of works clearly laid out?
-
Are there any cooling towers at the building?
-
If yes, are the cooling towers subject to periodic inspections as per the relevant ACoP?
-
Date of last Cooling Tower Inspection:
-
Are the cold water storage tanks inspected monthly?
-
Are calorifier temperatures being checked and recorded as required?
-
Is flushing of little used outlets being carried out and recorded?
-
Are sentinel/representative tap temperatures being checked and recorded?
-
Is the hot water system temperature being checked and recorded monthly?
-
Is the cold water system temperature being checked and recorded monthly?
-
Are shower heads being descaled periodically and is this being recorded?
-
Are hot water temperature graphs being completed on a monthly basis?
-
Are cold water temperature graphs being completed on a monthly basis?
-
Where there are failings identified, are they being recorded in the Fault Log, with appropriate remedial actions also being detailed?
-
Are system chlorination treatments undertaken and recorded?
-
Is there a chlorine dioxide treatment system?
-
Is the system ever pasteurised and are records maintained?
-
Are samples being sent away for analysis?
-
Is there an escalation process in place to respond to elevated bacterial counts?
Pedestrian /Traffic Management
Workplace Transport & Pedestrian Safety
-
Are there loading bay or car park areas at the building?
-
Picture:
-
Is there a need for staff to traverse these areas at any time?
-
Do any car park access doors open directly onto traffic routes?
-
Are clearly delineated pedestrian walkways and crossing points provided?
-
Are speed limit signs displayed?
-
Is the lighting in these areas sufficient to remove dark/blind spots?
-
Are staff issued with suitable hi-viz vests/jackets?
-
Are hi-viz vests/jackets being worn by staff when in car park or loading bay areas?
Environmental Management
Environmental Management
-
Has an Environmental Impacts and Aspect Register been produced for the building?
-
Is there a generator (or more than one) in the building?
-
Is there an oil or fuel tank in the building?
-
What is the capacity of the oil/fuel tank?
-
Where is the fuel tank fill point located?
-
Is a PIRP in place for the building?
-
Are there interceptors in the loading bay/carpark?
-
Are the interceptors cleaned and maintained as required?
-
How is controlled waste managed and disposed of?
-
Are Waste Transfer Notes and Consignment Notes held on file?
-
Are Consignment Notes with Part E completed correctly held on file?
-
Is an F-Gas Register in use?
-
Are the competency details for F-Gas Engineers held on file?
-
Are there any solar panels or PV units on the roof of the building?