Information

  • Building Inspection - Final

  • Owner

  • Address:

  • Conducted on:

  • Application Number:

  • Prepared by:Brian Tredinnick BPB1829

External items

  • Is a street number installed prominently displayed?

  • Site is adequately shaped for drainage?

  • Landscaping completed (are conditions of consent satisfied)?

  • Car parking installed (where required)?

  • Is the building connected to storm water?

  • Is the site & adjoining properties clear of building waste?

  • Clothesline installed (where required by BASIX)?

  • Check satisfactory redemption of footpath and/or adjoining public land ?

  • Have BASIX commitments been installed (water tanks)?

  • Is the Termite sticker installed in the meter box

  • Check plumbing requirements - vent, inspection shaft, over flow relief gully installed?

Internal items (Shoes Off for inspection)

  • Layout as per approved plans?

  • Windows / doors operable?

  • Are BASIX commitments in place?

  • Is plumbing operational (toilets flush, taps flow, no leaks to fixtures)?

  • Have electrical fittings been terminated?

Inspection Outcome

  • Inspection Result

Documentation

  • BASIX Declation

  • Glazing Certificate

  • Smoke Alarm certification

  • Shower screen certificate

  • Air conditioning certificate

  • Gas plate installed

  • Plumbing Certificate and SSD

  • Other Certificates

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.