Title Page
-
Location Name
-
Conducted on
-
Prepared by
-
Location
-
TRIM Container #
-
Document No.
Inspection Details
-
Request Type
-
Request Reference Number
-
Contact Name
-
Telephone Number
-
Description of Building
Checklist
-
Have smoke alarms been installed to dwelling in the correct position
-
Are smoke alarms hardwired to mainspower and interconnected in accordance with NCC and complies with requirements of AS3786-2014
-
Have bounding fire rated dividing walls been constructed from ground floor footing/slab level up to the underside of a non-combustible roof covering
-
Have all penetrations or openings in fire rated dividing walls been adequately brick in, cement rendered, sparged or completely fire sealed i.e no gaps
-
Has fire rated gyprock-(pink boards) been installed in accordance with Manufacture Specifications/details i.e CSR Multi-Residential Frame Redbook
-
Have all construction joints to ceiling/wall junctions been appropriately fire rated or sealed
-
Has two (2) layers of 16mm fire check been installed to achieve the required Fire Resistance Level (FRL) complying with the requirements of NCC
-
Submit smoke alarm certificate of compliance to AS3786-(2014)
-
Submit a ‘Final Fire Safety Certificate’ for new essential fire safety measures installed to the building
Result
-
Inspection of the aforementioned revealed that the work is:
-
Above rating subject to the below additional works (If unsatisfactory, then must book a re-inspection after completing works):