Title Page
-
Location Name
-
Conducted on
-
Prepared by
-
Location
-
TRIM Container #
-
Document No.
Inspection Details
-
Request Type
-
Request Reference Number
-
Contact Name
-
Telephone Number
-
Description of Building
Checklist
-
Principal Certifying Authority sign affixed to site fence
-
Builders sign e.g. name, contact phone number and licence number displayed on site fence
-
Site security fencing installed to secure building site from public access
-
Toilet facilities provided on site
-
Install 1.8 high chain mesh fence to protect Council’s street trees in accordance with (DA conditions)
-
Provide waste skip-bin on site and ensure waste bin is not located on public footpath or nature strip area
-
Sediment and erosion control measures installed e.g. Geo-tech fencing staked & trenched into ground to prevent soil/sediment runoff.
-
Install Council approved truck timber shaker to site vehicle driveway entrance to prevent the tracking of soil/mud onto roadway
-
Public footpath and pedestrian access to be kept clear during building works
-
Remove all building materials, shed containers, toilet from public footpath
-
Submit evidence of Sydney Water approval prior to commencement
-
Submit copy of Owner Builders Permit or Home Warranty Certificate of Insurance to Council prior to commencing works
Result
-
Inspection of the aforementioned revealed that the work is:
-
Above rating subject to the below additional works (If unsatisfactory, then must book a re-inspection after completing works):