Information
-
PROJECT
-
Council
-
Water / Sewer Authority
-
DATE CONDUCTED
-
PROJECT STATUS
-
CONTACT MADE WITH CONTRACTOR / SUB-CONTRACTORS
-
COMMUNICATIONS WITH CLIENT & OTHER STAKEHOLDERS
-
ACTION TO BE TAKEN BY CALIBRE
-
SURVEY AND ASSET RECORDING
ENVIRONMENT / PRE COM / EARTHWORKS
1.0 SITE ENVIRONMENT
-
Weather:
-
Site Conditions:
-
Site Conditions Photos
-
OH&S GENERAL<br>* Does the contractor have utilities / services plans on site?<br>* Are truck / scraper routes around site clearly designated and separate from public access areas?<br>* Does plant and equipment have suitable warning lights and reversing beepers?<br>* Are trucks adhering to worksite speed restrictions?<br>* Are personnel in the vicinity of operating plant wearing high vis clothing and hard hats where required?
-
TRAFFIC MANAGEMENT
- GOOD
- ADEQUATE
- INADEQUATE
-
TRAFFIC MANAGEMENT<br>* Is appropriate traffic management signage and devices or traffic control in place?<br>* Is temporary line marking appropriate?<br>* Is operating machinery being separated from pedestrian traffic and workers?<br>* Has appropriate temporary pathways been provided for pedestrians?
-
ENVIRONMENTAL:<br>* Is ground water being managed in an approved manner?<br>* Is storm water runoff being managed in an approved manner?<br>* Is there provision to minimize dust / mud from leaving the site?<br>* Do stockpiles have adequate silt runoff protection?<br>* Are environmental No-Go areas delineated / fenced where required?<br>* Are silt traps in place to prevent silt build up in previously installed drainage system?<br>* Does plant / equipment / pumps meet EPA noise requirements for volume, location relative to public and work hours?
1.1 PRE-COMMENCEMENT
-
* Have block pegs and TBM's been installed?<br>* Have drawings been been approved for construction & issued to contractor?
-
* Has contractor submitted TMP, PMP & CEMP to relevant authorities where required?<br>* Are Contractors Insurances in place?<br>* Has pre-commencement meeting occurred with contractor, Calibre and relevant authorities representative on site?<br>* Has the Site been fenced to Developer / Authority OH&S requirements?
2.0 SITE WORKS
-
Site Works:
-
Site Works Photos:
2.1 EARTHWORKS
-
Earthworks Notes:
-
Road Boxing:
-
Grading / Topsoiling:
-
Wetland:
-
Earthworks Photographs:
SEWER
2.2 SEWER
-
Sewer Sub-Contractor:
-
SEWER OH&S<br><br>* Is ground support suitable for the ground conditions and depth of excavation?<br>* Are workers provided with a ladder or other means of access and egress where required?<br>* Are trenches barricaded and made safe when left open (particularly overnight)?<br>* Is lifting equipment suitable for the works being carried out?
-
SEWER PROGRESS:
-
Sewer Progress Photographs:
-
Are materials as specified and stored correctly on site?
-
TRENCHING<br>* Are trench widths adequate for pipe size/ type?
-
PIPE LAYING<br>* Is the bedding material & thickness within tolerance and being compacted correctly?<br>* Are pipes being installed in accordance with design specification and manufacturers recommendations?<br>* Are clearances to other services being maintained as per specification?<br>* Are property branches being installed in accordance with the approved drawings and standards?
-
BACKFILLING<br>* Does trench backfill material comply with standard drawings and specifications?<br>* Is compaction testing being carried out by a NATA registered tester where required?
-
SEWER ACCESS STRUCTURES<br>* Has the concrete been placed and vibrated to specification?<br>* Is the surface finish of manhole walls satisfactory?<br>* Is mechanical compaction being carried out to specification within the support zone and around MH, MS, IS, Hydrants,Valves and Stormwater Pits?<br>* Are lids / covers as per design and correct rating?
-
Has asset recording of all sewer lines been undertaken?
-
Sewer testing<br>* Did all sewers pass pressure / vacuum testing and did the ovality ball pass all lines?<br>* Are all sewer lines and access structures clean of debris and not holding water?
WATER
2.3 WATER
-
Water Contractor:
-
WATER PROGRESS:
-
Water Progress Photographs:
-
WATER OH&S<br>* Does the contractor have utilities / services plans on site?<br>* Does plant and equipment have suitable warning lights and reversing beepers?<br>* Are hats and vests being worn by workers where required?<br>* Are trenches barricaded and made safe when left open?<br>* Is lifting equipment suitable for the works being carried out?
-
PRE-COMMENCEMENT<br>* Does the water contractor have the latest revision construction issue drawings?<br>* Is there an accredited pipe layer on site?
-
TRENCHING AND BEDDING<br>* Are trench widths adequate for pipe size/ type<br>* Is the bedding material & thickness within tolerance and being compacted correctly?
-
DEEP TRENCHING<br>* Is ground support suitable for the ground conditions and depth of excavation?<br>* Are workers provided with a ladder or other means of access and egress where required?
-
PIPE LAYING<br>* Are materials as specified, within acceptable manufacture date and stored correctly on site?<br>* Are pipes being installed in accordance with design specification and manufacturers recomendations?<br>* Are clearances to other services being maintained as per specification?<br>* Are thrust restraints being installed as per design where required?<br>* Is the installation of gas mains progressing without issues and clashes?<br>* Are property services being installed as per design and specification for DW / NDW?<br>* Are progressive cross connection-checks being carried out on DW and NDW?
-
* Has asset recording of all water mains, fittings and property services been undertaken?<br>* Have any changes to the documented design been conveyed to asset recorders?
-
BACKFILLING<br>* Does trench backfill material comply with standard drawings and specifications?
-
SURFACE FITTINGS AND MARKINGS<br>* Are lids / covers as per design and set correctly?<br>* Have marker posts and pavement markings been installed to authority requirements?
-
Property Services:
-
Water Connection:
-
Water Mains Testing
-
Have all swabs been successfully passed?
-
Did all water mains successfully pass pressure testing?
DRAIN / ELEC / COMS
2.4 DRAINAGE
-
Drainage:
-
Drainage Photographs:
-
TRENCHING, DRAIN INSTALLATION AND BACKFILLING<br>* Are trench widths adequate for pipe size/ type?<br>* Is the bedding material & thickness within tolerance and being compacted correctly?<br>* Are pipes / pits being installed in accordance with design spec and manufacturers recommendations?<br>* Are clearances to other services being maintained as per specification?<br>* Does trench backfill material and compaction comply with standard drawings and specifications?
-
Are lids / covers as per design and set correctly?
-
Has CCTV been completed and approved by Council?
2.5 ELECTRICAL & COMMUNICATIONS
-
Electrical:
-
Electrical Photographs:
-
Comms:
-
Comms Photographs:
-
Have electrical plans been approved (at least 2 weeks before commencing on site)?
-
TRENCHING, SERVICE INSTALLATION AND BACKFILLING<br>* Are trench widths adequate for pipe size/ type?<br>* Is the bedding material & thickness within tolerance and being compacted correctly?<br>* Are cables / conduits / pits being installed in accordance with design spec and manufacturers recommendations?<br>* Are clearances to other services being maintained as per specification?<br>* Does trench backfill material and compaction comply with standard drawings and specifications?
-
Are lids / covers as per design and set correctly?
PAVEMENT
2.6 PAVEMENTS
-
PAVEMENT PROGRESS:
-
Pavements Photographs:
-
Subgrade Improvement:
-
Class 3:
-
Class 2:
-
Asphalt:
Flexible Pavements
-
Are conduits and AG drains at correct depth?<br>Does trench backfill material comply with standard drawings and specifications?
-
Is the weather suitable for priming or placing asphalt?
-
Did Council witness and approve proof rolling of pavement areas?
-
Does pavement material comply with plans, standard drawings and specifications?<br>Is crushed rock being placed in layers and compacted as per specification?<br>Is compaction equipment adequate to achieve specified results?
-
Are compaction tests being conducted to specified Level by NATA registered tester?
Rigid Pavements
-
Concrete Pavements:
-
Concrete driveway / laneway:
-
WORKS - RIGID PAVEMENTS<br>* Are weather conditions suitable for placing concrete?<br>* Are access routes for trucks clearly defined?<br>* Is boxing depth and crushed rock bedding as per specification?<br>* Is formwork adequate for the structure being constructed?<br>* Is reinforcing as per specification and installed correctly?<br>* Are kerb markings for services being installed?
CONCRETE
2.7 CONCRETE WORKS
-
Kerb and Channel:
-
Kerb and Channel Photographs:
-
Footpaths and crossovers:
-
Footpath and Crossover Photographs:
-
CONCRETE WORKS<br>* Are weather conditions suitable for placing concrete?<br>* Are access routes for trucks clearly defined?<br>* Is boxing depth and crushed rock bedding as per specification?<br>* Is form work adequate for the structure being constructed?<br>* Is reinforcing as per specification and installed correctly?<br>* Are kerb markings for services being installed?
RETAINING WALLS
2.8 RETAINING WALLS
-
Sleeper Retaining Wall Notes:
-
Retaining Wall Photographs:
-
Rock Walls:
-
Rock Wall Photographs:
-
Has the Contractor been issued with Sewer as-con drawings and are retaining wall footings being coordinated to avoid these services?
-
SLEEPER RETAINING WALL WORKS<br>* Are retaining wall post holes dia / depth correct?<br>* Are AG drains being connected to drainage system?<br>* Is free draining material being backfilled behind walls?<br>* Are brackets for fence posts being installed?
COMMENTS
3.0 GENERAL COMMENTS / SUPPLEMENTARY INFORMATION
-
COMMENTS
-
SUPPLEMENTARY PHOTOGRAPHS / IMAGES