Canopies UK After Installation Report (ID132 JUN13)
-
Customer Name
-
SO Number
-
Date of Installation
-
Inspection conducted on
-
Installed By:
- Shaun Barnes - Installation Manager
- Billy Hulston - Installation Supervisor
-
Location
-
Prepared By
Contract information and Checks
Contract Information and Checks
-
Is the Height To Underside the same as contract?
-
X = beam
P = post
V = vertical bracket
Snb = Swan neck bracket -
Bay Sizes on Contract.
-
Are the bay sizes Installed the same as above?
-
What are the bay sizes Installed?
-
Have changes to contract been authorised by the office?
-
Have changes to contract been authorised by the customer?
-
Are there any large bays together?
-
Have the correct number of mini beams been installed?
-
Are the foundation sizes correct as visible from the re-instate?
Installation Quality Checks
Installation Quality Checks
-
Are all beams and mini beams of good quality?
-
Are the beams around the fixing points of good standard?
-
Is the steelwork of good quality and free from chips?
-
Is the weld on the steelwork of acceptable quality?
-
Can you see overlapping roof sheets?
-
Are the fascia joints in line and connected with 4 bolts?
-
Are the side and front fascia neatly jointed?
-
Is the area free from brick dust and debris?
Service
-
Is the customer happy with the canopy?
-
Is the customer happy with the service they have received?
-
Canopy Installation Pictures