Manholes
-
All lids and surrounds in place (Surrounds undamaged, Word "Sewer" and Class (B or D) visible)
-
All cover levels flush with FSL If no FSL, 2m topsoil surround required)
-
Gattic lifting hole plugs in place
-
All gatic covers greased
-
All Stepirons in correct location (max. 600mm below top, max 450mm from base)
-
All ladders in place (if required) (top of ladder below neck)
-
All landings installed (if required) (only required in manholes >6m deep)
-
All drop pipes in place as per the design
Shafts
-
All lids and surrounds in place (Word "Sewer" visible)
-
All cover levels flush with FSL
-
All caps installed (150-300mm below cover)
-
Cover supported to prevent rocking
Trenches
-
No subsidence evident
-