Information
-
Document No.
-
Job Name
-
Conducted on
-
Prepared by
-
Location
General Information
-
Is a SWPPP binder on site and up to date?
-
Are the SWPPP drawing on site and updated?
-
Are BMP's in correct location & per detail?
-
Tab 15 stabilization: Is this an updated record of all BMP's in place?
-
Is a spill containment kit on site?
-
Phase I / Phase II / Phase III SWPPP plans all work within LOD?
-
Are permits ( building / site / utility ) present? check construction sign.
-
Rain gauge on site?
-
Fuel in secondary containment?
-
Porta potty's anchored? Secondary containment? Note: not allowed within 30' of inlets or permitted LOD !!!
-
Inspection start time?
Weather Information
-
Weather at time of inspection?
- Clear
- Cloudy
- Overcast
- Light Rain
- Rain
- Light Snow
- Snow
-
Are BMP's preventing non-compliant discharge at time of visit?
Controlled Access / Temporary Construction Entrance
-
Are all ingress and egress points covered by a temporary construction entrance?
-
Is the entrance adequately preventing tracking of mud, dirt, and sediment onto roadways?
-
Gate guard signing everyone in / out?
-
Exhibit L and O updated and in compliance?
-
Controlled access sign at entrance and visible?
-
Visitor and Client sign in logs being used?
-
Badges left on site?
Perimeter Erosion Control
-
Is silt fence or BMP installed properly?
-
Is the silt fence or BMP maintained and in good condition?
Soil Stockpile
-
Is the stockpile located in an approved location? (i.e. not in floodplain or wetland)
-
Is the stockpile properly enclosed with silt fence?
-
Has the stockpile been stabilized?
Silt Dikes
-
Are silt dikes installed correctly and functioning?
-
Have the locations changed per the SWPP plan of record? If yes, is it noted on plans?
Sediment Basins
-
Are sediment basins install correctly and functioning? Skimmers working?
-
Discharge points protected against erosion?
Dust Control
-
Are dust control measures being used as needed?
-
Are roadways being swept and cleaned as needed?
Inlet Protection
-
Are all inlets that are or will be functional during construction protected?
-
Is the inlet protection being maintained?
Site Debris
-
Are all construction materials kept within the project limits?
Concrete Wash Outs
-
Are washouts adequate for the amount of material being discharged?
-
Are liners free from rips and tares?
-
Are washouts located in a location that will not effect water inlets?
-
Are washouts easy to access?
Non Hazardous Waste
-
Check log- up to date?
-
Containers marked trash/concrete/wood/metal, etc?
-
Storage area in 8' fence and locked? Storage area at least 50' from property line?
-
Correct information posted at entrance of waste management area (superintendent and pm info) ?
Hazardous Waste
-
Check log- up to date?
-
Storage container labeled "HAZARDOUS" with a "no smoking" sign displayed on outside?
-
Are individual containers labeled "HAZARDOUS" with accumulation start date and contents listed?
-
Storage area in 8' fence and locked? Storage area at least 50 feet from property line?
Signatures
-
Inspector