Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Safety

  • Are CCF installers utilizing required/recommended PPE?

  • Are CCF installers wearing required uniforms?

  • Are CCF installers working in a safe manner?

  • List corrective action taken:

Job Conditions

  • Rate the cleanliness of the project (10 being no trash in building and floors broom swept)

  • Are areas to receive flooring free from Sheetrock mud and broom swept?

  • Are areas to receive floor free from materials stored by others?

  • Rate the cleanliness of CCF work in progress (10 being no CCF trash in building and area swept)

  • List any corrective action taken for cleanliness:

  • Is there adequate lighting for CCF work?

  • Are drains flat/ready and ready to receive flooring?

  • Is the building HVAc system operational and running?

  • Job Conditions Notes:

Quality/Schedule

  • Turn on for ceramic scope of work:

Ceramic

  • Has a ceramic mock-up been done and approved?

  • Areas of current ceramic work:

  • Total Percent Complete of All Ceramic

  • Is ceramic work on schedule?

  • Are there showers in the scope of work?

Is waterproofing installed correctly? Fabric at the drains under the flange. Fabric and waterproofing in the corners.

  • Are drains protected from being clogged with setting materials?

Floor Tile

  • Is correct floor tile being used?

  • Are grout joint sizes correct?

  • Are grout joints consistent and aligned?

  • Is correct type of grout being used (sanded/nonsanded/epoxy/cement)?

  • Is correct grout color being used?

  • Is crack suppression needed and being used?

  • Is tile sloped to drains?

  • Are transition being installed per the plans?

  • Is floor tile pattern correct?

  • Is there wall tile in the scope of work?

Wall Tile

  • Are grout joint sizes correct?

  • Is the correct wall tile being used?

  • Is cove base stackable?

  • Are correct walls marked for tile at the correct height?

  • Is substrate free from paint, holes, and/or anything that would prevent or compromise installation?

  • What provisions are made for outside corners?

  • Is correct grout color being used?

  • Is correct type of grout being used (sanded/nonsanded/epoxy/cement)?

  • Are grout joints consistent and aligned?

  • Is glass tile in the scope of work?

  • A MOCKUP NEEDS TO BE DONE FOR GLASS TILE

  • Is glass tile thinnest being used?

  • Has manufacturer's instructions been reviewed?

  • Are all materials available for completion of ceramic?

  • Are there any obstacles (by others) preventing work from being completed or slowing production (i.e. unanswered RFIs, materials in the way, interference by other trades)? Is yes, explain in detail.

  • Pictures of ceramic:

  • Turn on for resilient tile and/or plank scope of work.

Resilient Tile/Plank

  • Approx % complete.

  • Is resilient tile installation on schedule?

  • Areas currently being installed:

  • Is correct material being used?

  • Is correct adhesive being used?

  • Are correct trowels being used and are the trowels in good shape?

  • Is installation direction correct?

  • Are all materials available for completion of resilient tile?

  • Are there any obstacles (by others) preventing work from being completed or slowing production (i.e. unanswered RFIs, materials in the way, interference by other trades)? Is yes, explain in detail.

  • Pictures of Resilient Tlie

  • Turn on for carpet scope of work

Carpet

  • Approx % complete.

  • Is carpet installation on schedule?

  • Is there carpet tile?

  • Is correct installation method being followed?

  • Are provisions for transitions per the specs?

  • Is there broadloom carpet?

  • Is seam diagram being followed?

  • Are seams acceptable?

  • Is seam sealer being used?

  • Are provisions for transitions per the specs?

  • Is there pattern carpet?

  • Has a mock-up been approved?

  • It is recommended that a mock-up with seams is installed and approved. This is due to inherit bow and skew in some pattern carpets.

  • Are all materials available for completion of carpet?

  • Are there any obstacles (by others) preventing work from being completed or slowing production (i.e. unanswered RFIs, materials in the way, interference by other trades)? Is yes, explain in detail.

  • Pictures of Carpet

  • Turn on for resilient sheet goods

Resilient Sheet Goods

  • Approx % complete.

  • Is resilient sheet goods installation on schedule?

  • Is correct product being used?

  • Is correct adhesive being used?

  • Are correct trowels being used and are the trowels in good shape?

  • Is seam diagram being followed?

  • Are provisions for transitions per the specs?

  • Is flash cove specified?

  • Is correct height of cove being used?

  • Are outside and inside corners acceptable?

  • Are welds acceptable?

  • Are all materials available for completion of resilient sheet goods?

  • Are there any obstacles (by others) preventing work from being completed or slowing production (i.e. unanswered RFIs, materials in the way, interference by other trades)? Is yes, explain in detail.

  • Pictures of Sheet Goods

  • Turn on for resilient wall base and/or accessories

Resilient Wall Base and Accessories

  • Approx % complete.

  • Is Sheetrock with 1/2" of floor?

  • Sheetrock should be no greater than 1/2" from floor to allow for proper base installation.

  • Is substrate ready to receive base?

  • Is there vinyl wall covering?

  • WC should be held to 1/2" less than height of base to allow for adhesion of base to wall.

  • Are corners acceptable?

  • If pre-molded corners were spec'd, are they being used?

  • Is there resilient chair rail in scope of work?

  • Walls to receive chair rail should not be painted where chair rail is called for.

  • Are all materials available for completion of base and accessories?

  • Are there any obstacles (by others) preventing work from being completed or slowing production (i.e. unanswered RFIs, materials in the way, interference by other trades)? Is yes, explain in detail.

Cost/Contract

  • Has additional work been performed (other than ASI's) where cost is involved?

  • List additional work:

  • Has a CCF Field Change Order Authorization been signed?

  • Is floor patch being used?

  • Are patch sheets being signed by client?

  • Has CCF work been damaged by others?

  • List damages:

  • Pictures of Damaged Flooring

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.