Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

OFFICE / TRAILER

  • Project Specific Safety Plan

  • Add media

  • CCI Safety Policy

  • Add media

  • Equipment Release Form

  • Add media

  • Fire Extinguishers (inspection tagged within the past 12 months)<br>

  • Add media

  • TAGS Documented

  • Add media

  • First aid kits

  • Add media

  • Job site right – to - know posters

  • Add media

  • Emergency plan and number

  • Add media

GENERAL SAFETY

  • PPE's properly stored

  • Add media

  • Record of PPE inspections

  • Add media

  • Safety glasses and hardhats

  • Add media

  • Work area free of clutter and debris

  • Add media

  • Tools and equipment stored properly

  • Add media

  • Cords in good condition

  • Add media

  • Mechanical safeguards in place - required guards on all tools

  • Add media

  • Hot work permit used where needed

  • Add media

  • GFCI's in use

  • Add media

  • Ladders inspected and used properly

  • Add media

  • Ladders 3 feet above landing and secured

  • Add media

  • Guard rails and barricades erected and in good condition. If cable guardrails ensure tension is adequate.

  • Add media

SCAFFOLD

  • Scaffold erected properly

  • Add media

  • Scaffold built on solid level ground

  • Add media

  • Work surfaces free of debris

  • Add media

  • Material neatly stored and stacked as required

  • Add media

  • Materials protected from weather

  • Add media

  • Proper material handling equipment being used

  • Add media

EXCAVATION

  • Excavations properly barricaded

  • Add media

  • Adjacent ground and structures shored or laid-back to proper slope

  • Add media

  • Ladders in use if needed and properly spaced at no more than 25 feet apart. If trench or opening is larger than 4 feet in depth a ladder is required.

  • Add media

  • Excess materials stored at least 2 feet back from the edge of the excavation. All other materials are to be stored at not less than 6 feet away from top edge.

  • Add media

  • All utilities clearly marked

  • Add media

FLAMMABLES

  • Containers clearly identified

  • Add media

  • Fire extinguishers readily available

  • Add media

  • Cylinders in Carts

  • Add media

  • Cylinders chained and secured

  • Add media

  • Gauges removed and caps in place on stored cylinders

  • Add media

  • Equipment inspected daily and in good working order

  • Add media

  • Proper PPE in use

  • Add media

  • Forms properly braced

  • Add media

  • Gloves, safety glasses, and hardhats

  • Add media

  • All lumber free of nails

  • Add media

  • Fall protection system in place

  • Add media

  • Fall protection equipment inspected daily

  • Add media

PPE's

  • High visibility vest or shirts as required

  • Add media

  • Respirators and masks as needed

  • Add media

  • Rubber gloves when using acids and alkalis

  • Add media

  • Confined space equipment tested and in good working condition

  • Add media

  • Eye protection and face shield when needed

  • Add media

  • Hard hats and safety glasses at all times

  • Add media

  • Hearing protection when needed

  • Add media

CRANES / AERIAL LIFTS

  • Certified operator

  • Add media

  • Swing radius guarded

  • Add media

  • Annual inspection on site

  • Add media

  • Qualified signal person

  • Add media

  • Qualified rigging person

  • Add media

  • Daily inspections completed

  • Add media

  • All guards, gates, and chains in place

  • Add media

  • Fall protection as required

  • Add media

UNSAFE ACTS AND /OR PRACTICES OBSERVED

  • Add media

GENERAL NOTES OR COMMENTS

  • Add media

CORRECTIVE ACTION TAKEN

  • Select date

  • Add media

SIGNATURES

  • Superintendent / foreman

  • Safety Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.