Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
OFFICE / TRAILER
-
Project Specific Safety Plan
-
Add media
-
CCI Safety Policy
-
Add media
-
Equipment Release Form
-
Add media
-
Fire Extinguishers (inspection tagged within the past 12 months)<br>
-
Add media
-
TAGS Documented
-
Add media
-
First aid kits
-
Add media
-
Job site right – to - know posters
-
Add media
-
Emergency plan and number
-
Add media
GENERAL SAFETY
-
PPE's properly stored
-
Add media
-
Record of PPE inspections
-
Add media
-
Safety glasses and hardhats
-
Add media
-
Work area free of clutter and debris
-
Add media
-
Tools and equipment stored properly
-
Add media
-
Cords in good condition
-
Add media
-
Mechanical safeguards in place - required guards on all tools
-
Add media
-
Hot work permit used where needed
-
Add media
-
GFCI's in use
-
Add media
-
Ladders inspected and used properly
-
Add media
-
Ladders 3 feet above landing and secured
-
Add media
-
Guard rails and barricades erected and in good condition. If cable guardrails ensure tension is adequate.
-
Add media
SCAFFOLD
-
Scaffold erected properly
-
Add media
-
Scaffold built on solid level ground
-
Add media
-
Work surfaces free of debris
-
Add media
-
Material neatly stored and stacked as required
-
Add media
-
Materials protected from weather
-
Add media
-
Proper material handling equipment being used
-
Add media
EXCAVATION
-
Excavations properly barricaded
-
Add media
-
Adjacent ground and structures shored or laid-back to proper slope
-
Add media
-
Ladders in use if needed and properly spaced at no more than 25 feet apart. If trench or opening is larger than 4 feet in depth a ladder is required.
-
Add media
-
Excess materials stored at least 2 feet back from the edge of the excavation. All other materials are to be stored at not less than 6 feet away from top edge.
-
Add media
-
All utilities clearly marked
-
Add media
FLAMMABLES
-
Containers clearly identified
-
Add media
-
Fire extinguishers readily available
-
Add media
-
Cylinders in Carts
-
Add media
-
Cylinders chained and secured
-
Add media
-
Gauges removed and caps in place on stored cylinders
-
Add media
-
Equipment inspected daily and in good working order
-
Add media
-
Proper PPE in use
-
Add media
-
Forms properly braced
-
Add media
-
Gloves, safety glasses, and hardhats
-
Add media
-
All lumber free of nails
-
Add media
-
Fall protection system in place
-
Add media
-
Fall protection equipment inspected daily
-
Add media
PPE's
-
High visibility vest or shirts as required
-
Add media
-
Respirators and masks as needed
-
Add media
-
Rubber gloves when using acids and alkalis
-
Add media
-
Confined space equipment tested and in good working condition
-
Add media
-
Eye protection and face shield when needed
-
Add media
-
Hard hats and safety glasses at all times
-
Add media
-
Hearing protection when needed
-
Add media
CRANES / AERIAL LIFTS
-
Certified operator
-
Add media
-
Swing radius guarded
-
Add media
-
Annual inspection on site
-
Add media
-
Qualified signal person
-
Add media
-
Qualified rigging person
-
Add media
-
Daily inspections completed
-
Add media
-
All guards, gates, and chains in place
-
Add media
-
Fall protection as required
-
Add media
UNSAFE ACTS AND /OR PRACTICES OBSERVED
-
Add media
GENERAL NOTES OR COMMENTS
-
Add media
CORRECTIVE ACTION TAKEN
-
Select date
-
Add media
SIGNATURES
-
Superintendent / foreman
-
Safety Inspector