Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
JOB TASK OBSERVATION: PRODUCTION LOADING
-
Name
-
Task Observed
-
Select date
PROCEDURE KNOWLEDGE AND COMPLIANCE
-
Appropriate Sings In Place (eg Loading In Progress, Danger Open Hole, Danger Trailing Cable etc)
-
Caps And Powder Kept On Either Side Of The Drift Until Needed
-
Good Housekeeping
-
Primers Asembled So To Avoid Unnecessary Shock
-
Toe Loader Retraction Rate Set For The Correct Hole Size
-
Due Care Taken When Working With Shock Tube To Avoid Impact Or Pulling
-
Holes Double Primed Where Required - Following The Blast Letter
-
Holes Loaded According To The Blast Letter
-
Leaky Feeder Remote Blast Box Inspected Before Use (eg Sufficeint Charge, Good Leaky Feeder Signal)
-
Comments
-
Observer