Title Page
-
Work Order Number
-
Job Description
-
Location
-
Conducted on
-
Conducted by
-
CMW's involved in the working at heights task
Fit for Purpose Equipment - PPE All Working at Heights Equipment will comply with Australian Standards
-
All CMW's performing working at heights PPE inspections have been trained to the required competency - RIIWHS204D Working at Heights<br>Confirm LMS records to verify all participants are certified
-
Validate the PPE is made to an Australian Standard (stamped). Relevant standard AS1891 Industrial Fall Arrest Systems & Devices <br>
Gather evidence
-
Check JSEA's and W@H Permit controls are in place and relevant to maintain risk at an acceptable level.
-
Take a photo of evidence
-
Add comments:
-
Check LMS records for current authorisations
-
Take a photo of evidence
-
Add comments:
-
Inspect W@H equipment has Australian Standard marking (BMC & Contractors)
-
Take a photo of evidence (Aust Standard Tag)
-
Add comments:
-
Inspect W@H equipment has current in date test identifier (Coloured cable tie ) <br>Check current colour with tool store.
-
Take a photo of evidence
-
Add comments:
-
Confirm pre-inspection was completed and understood. <br>Response should include stitch integrity; ingress of dirt; damaged hook; operation of safety latch
-
Add comments:
Exclusion zones
Working at Heights - Equipment (e.g. Sissor lifts, EWP, lift boxes) are inspected as fit for purpose and display a safe working load limit
-
Verify equipment inspections have been completed <br>
-
Take a photo of evidence - Prestart book competed
-
Add comments:
-
If a lift box is in use, verify a lift plan has been completed.
-
Take a photo of evidence
-
Add comments:
-
Verify equipment has a safe load limit displayed <br>Includes - EWP, sissor lift, lift box, mobile work platforms.
-
Take a photo of evidence
-
Add comments:
Fit for purpose equipment
Exclusion zones identified and demarcated taking into account the potential of working at heights plant and equipment from being struck by other plant or equipment used on site
-
Confirm scaffold build plan (if required) or JSEA demonstrates equipment interactions have been high lighted and exclusion zones have been identified as controls.
-
Take a photo of evidence (scaff. Tag)
-
Add comments:
-
Verify identified exclusion zones have been implemented and are effective to maintain risk at an acceptable level.
-
Take a photo of evidence - exclusion zone
-
Add comments:
-
Verify identified exclusion zones have been implemented and are effective in line with BMC barricading standard (tape/signage/lighting etc.)
-
Take a photo of evidence
-
Add comments:
-
Type in name and sign.
-
Email audit and attach to Notification of Work Order