Title Page
-
Contract Number & Name
-
Date of Inspection
-
Name of Safety Auditor
-
Name of Site Manager/Supervisor (Black Hat Appointed)
-
No. of HSE Reportable Accidents/Incidents since previous inspection
-
No. of First-aid Accidents since previous inspection
Health & Safety Inspection
Health and safety
-
1 Supervision, competency, sub-contractors, young persons
-
2 Traffic management plan, segregation, banksmen present
-
3 Fire assessment, alarm, extinguishers, marshals, escape routes
-
4 Welfare facilities, drying facilities, first aider & box available
-
5 Display info: h&s policy & insurance notes available
-
6 Safety induction & safety tool box talks
-
7 Training records / matrix, competency - CSCS, IPAF, PASMA etc.
-
8 Permits to work - roof / hot works etc. in place
-
9 Safety meetings & consultation with workforce – frequency?
-
10 Accidents / Incidents / Near Misses recorded? Book available
-
11 Risk assessments & method statements in place, approved?
-
12 COSHH assessments, including EPDM, adhesives, solvents etc.
-
13 Physical agents, dust, noise, vibration – assessed?
Environmental
-
14 Fuel & chemical storage controlled, spill kits/drip trays issued/used
-
15 Waste – segregated & suitable signage, litter standards, leaching of skips
-
16 Ecology – no disruption to general environment / wildlife / drainage systems
PPE
-
17 PPE head protection being worn (mandatory?)
-
18 Safety footwear being worn (steel toecaps / midsoles mandatory?)
-
19 Eye protection being worn (mandatory?)
-
20 Hand protection being worn (mandatory?)
-
21 Safety harnesses being worn
-
22 Hearing protection worn
-
23 High-visibility clothing worn (mandatory?)
-
24 Replacement PPE available
Working at Height
-
25 Working at height: - how? emergency procedures in place?
-
26 Protection from falling – debris netting, toeboards etc.
-
27 Safeguarding others, occupiers, public, other workers
Scaffolding
-
28 Scaffolding: foundations, base/sole plates, ties, bracing
-
29 Standards, ledgers, transoms, platforms, guardrails, toeboards
-
30 Brick guards, fans, nets, scaffold ladders
-
31 Ladder beams, temporary roofs, gantry’s, material access
Access Equipment & Safe operation of plant, machinery and equipment:
-
32 Access equipment: tower scaffolds, cradles, step ladders etc.
-
33 Correct plant & machinery used / guarded where necessary
-
34 Lifting equipment (vacuum lifters), lifting plans in place
-
35 Towers / podiums erected by competent person, tagged
MEWPS
-
36 MEWPs exclusion zones, debris netting, tethering lines in place
-
37 Other plant being used (FLTs,), turned off when not in use
-
38 Hand & power tools, drills, grinders – suitability
-
39 Electrical safety, 110v & PAT inspections and records
-
40 Maintenance & Inspection Records (MEWPs, towers etc.)
Safe place of work:
-
41 Edge protection in place, stairways clear / closed
-
42 Site tidiness, housekeeping, trailing cables, waste removal
-
43 Storage, stacking, safe manual handling techniques adopted
-
44 Access & egress around site & to workplaces, slips, trips & falls
-
45 Work areas sufficiently illuminated, background & task lighting
-
46 Services protected, highlighted, guarded, safe
-
47 Structures, formwork etc. stable, braced/popped, not overloaded
Additional Information and Comments
-
Additional Comments Regarding Inspection Results: (Number Refers to Item on Previous Page)