Title Page

  • Conducted on

  • Prepared by

  • Location
  • As defined by the AS2124 Contract

The provision, to the Superintendent, of all the Completion Documentation

  • The provision, to the Superintendent, of the BIM Model

  • Any other steps nominated as such by the Principal from time to time

  • Copies of all certificates required by Clause 14.1B;

  • Building permit

  • Footings Inspection Certificate

  • Frame Inspection Certificate

  • Occupancy Permit

  • Instruction Manuals in relation to plant and equipment incorporated into the Modular Building

  • Warranty Certificates in relation to plant and equipment incorporated into the Modular Building

  • The AS BUILT drawings in relation to the Modular Building in both PDF & the native file (cad. Or dwg.)

  • The provision, to the Superintendent, of the BIM Model (within the meaning of Annexure Part K)

  • Evidence of compliance with all relevant aspects of the quality assurance system including, but not limited to, having undertaken all final inspections and testing required by that system

  • A Certificate as to Title in relation to the Modular Building

  • A Clear PPSA Certificate in relation to the Modular Building

  • A Contractors Practical Completion Certificate endorsed pursuant to Clause 42.4C

  • Asbestos Removal and Demolition Documentation including clearance certificates and air monitoring reports

  • Signed:

  • (name)

  • (signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.