As defined by the AS2124 Contract
The provision, to the Superintendent, of all the Completion Documentation
-
The provision, to the Superintendent, of the BIM Model
-
Any other steps nominated as such by the Principal from time to time
-
Copies of all certificates required by Clause 14.1B;
-
Building permit
-
Footings Inspection Certificate
-
Frame Inspection Certificate
-
Occupancy Permit
-
Instruction Manuals in relation to plant and equipment incorporated into the Modular Building
-
Warranty Certificates in relation to plant and equipment incorporated into the Modular Building
-
The AS BUILT drawings in relation to the Modular Building in both PDF & the native file (cad. Or dwg.)
-
The provision, to the Superintendent, of the BIM Model (within the meaning of Annexure Part K)
-
Evidence of compliance with all relevant aspects of the quality assurance system including, but not limited to, having undertaken all final inspections and testing required by that system
-
A Certificate as to Title in relation to the Modular Building
-
A Clear PPSA Certificate in relation to the Modular Building
-
A Contractors Practical Completion Certificate endorsed pursuant to Clause 42.4C
-
Asbestos Removal and Demolition Documentation including clearance certificates and air monitoring reports
-