Title Page

  • Client

  • Contractor

  • Date

  • Villa No.

  • ODU S. No:

  • IDU S. No:

  • Prepared by

Description:

  • All indoor A/C units were replaced.

  • All outdoor A/C units were replaced.

  • Insulation of piping and ducting

  • Checking of electrical wiring from out door and indoor unit, if it hanging or not fixed properly

  • Checking for any ratling noise from duct / diffuser or any hanging support

  • Checking for any leakage in the existing piping (use soap water)

  • Outdoor units are bolted

  • Old AC units (indoor and out door) to be discarded from the villa

  • Roof is clear from any left over of any insulation pipings or other material used in AC installation

On Site Inspection Inputs

Completion

  • Site Engineer Name (Contractor)

  • Site Manager (Signature)

  • Received Date and Time

  • Client's Approval / Comments

  • Code

  • Facility Management Team (ON SITE) Name and Signature

  • Client's Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.