Title Page
-
Client
-
Contractor
-
Date
-
Villa No.
-
ODU S. No:
-
IDU S. No:
-
Prepared by
Description:
-
All indoor A/C units were replaced.
-
All outdoor A/C units were replaced.
-
Insulation of piping and ducting
-
Checking of electrical wiring from out door and indoor unit, if it hanging or not fixed properly
-
Checking for any ratling noise from duct / diffuser or any hanging support
-
Checking for any leakage in the existing piping (use soap water)
-
Outdoor units are bolted
-
Old AC units (indoor and out door) to be discarded from the villa
-
Roof is clear from any left over of any insulation pipings or other material used in AC installation
On Site Inspection Inputs
Completion
-
Site Engineer Name (Contractor)
-
Site Manager (Signature)
-
Received Date and Time
-
Client's Approval / Comments
-
Code
- Code "A" - Approved
- Code "B" - Approved with Comments
- Code "C" - Rejected and Resubmit
-
Facility Management Team (ON SITE) Name and Signature
-
Client's Name and Signature