Chiller Commissioning Checklist

Before Start-up

  • Read and understand all manuals (chiller, controls, etc.)

  • Read and understand manuals for third party components (electric motors, valves, etc.)

  • Check unit installation and vibration damper adjustment

  • Carry out functional testing of safety equipment

  • Read the opening pressures on all safety valves, and check that they are correct

  • Carry out vacuum test

  • Check Unisab set-up (see list of settings), and check VSD set-up, as applicable

  • Check oil level

  • Check that the heating element in the oil has been on for 6-8 hours before start

  • Take a sample of the primary refrigerant (must be free from water, air, etc.)

  • Check that the motor rotation direction is correct

  • Check that the coupling is aligned

  • Check that compressor cooling is connected correctly

  • Check that the plant is not leaking

  • Check that the valves are in the correct position for operation

After Start-up

  • Check that the capacity regulation system is working correctly

  • Check the refrigerant charge (at full load)

  • Check the unit for vibrations

  • Check the unit for vibrations using variable speed

  • Make a start-up log at full load

  • Take out a representative lubricating oil sample after about 1 hour of operation, and save it for minimum 1 year from commissioning date

Observation

  • Operation time [hours]

  • Suction pressure [°C/R]

  • Suction temperature [°C]

  • Superheating, suction gas [K]

  • Discharge pressure [°C/R]

  • Discharge temperature [°C]

  • Oil pressure, compressor [bar]

  • Oil pressure, filter [bar]

  • Oil temperature [°C]

  • Oil temperature, separator [°C]

  • Oil collection from shaft seal [ml]

  • Oil level [0, 1/4, 1/2, 3/4, Full]

  • Charged oil [Liter]

  • Motor 1/1 load [amp.]

  • Capacity load [%]

  • Noise level

  • Vibrations (0-100% capacity)

  • Brine temperature, outlet - Evaporator [°C]

  • Brine temperature, outlet - Condenser [°C]

  • Refrigerant charge [Kg]

Completion

  • Additional Observations

  • Inspector Name & Signature

  • Supplier/Installer Name & Signature

  • Manager/Supervisor Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.