Title Page
-
TECHNICIAN NAME
-
SITE NAME
-
SITE LOCATION
-
CHILLER LOCATION
-
CHILLER MAKE
-
CHILLER MODEL NUMBER
-
CHILLER SERIAL NUMBER
OPERATIONAL
-
PLEASE NOTE AND TAKE PICTURES OF ANY DEFICIENCIES FOR THE FOLLOWING
-
MONITOR SYSTEM FOR CORRECT PHASE (NOTATE VOLTS / AMPS)
-
INSPECT FRAME, FIT AND FINISH, AND PROPER CLEARNACES (24" FROM WALL)
-
MONITOR SYSTEM STARTING CHARACTERISTICS. RUN TO SETTINGS
-
INSPECT UNIT FOR PROPER REFRIGERANT LEVEL AND ADJUST IF NECESSARY
-
MEASURE HIGH AND LOW SIDE SYSTEM PRESSURES (NOTATE SUCTION / DISCHARGE / LIQUID PRESSURES)
-
INSPECT FAN MOTOR AND FAN BLADERS FOR WEAR AND DAMAGE
-
INSPECT ALL ELECTRICAL CONNECTIONS AND ASSOCIATED CONTROLS / ACCESSORIES, WIRING, AND CONNECTIONS. CONTROLS MAY INCLUDE CONTACTORS, RELAYS, CIRCUIT BOARDS, CAPACITORS, AND OTHER ACCESSORIES.
-
INSPECT AND TEST CONTACTORS / RELAYS
-
INSPECT COMPRESSOR AND ASSOCIATED TUBING FOR DAMAGE / LEAKS
-
INSPECT EVAPORATOR COIL / BARREL, DRAIN PAN AND CONDENSATE DRAIN LINES / LEAKS
-
INSPECT HEAT EXCHANGER AND / OR HEATING ELEMENTS (IF APPLICABLE)
-
INSPECT ALL PLUMBING FITTINGS IN UNIT FOR LEAKS
-
INSPECT PUMPS AND FILTERS
-
TEST GLYCOL BRIX
-
LISTEN FOR ABNORMAL NOISES
-
SEARCH FOR SOURCE OF UNUSUAL ODORS
-
INSPECT COIL AND CABINET - CLEAN AS NECESSARY
-
MONITOR SYSTEM OPERATION PER MANUFACTURER'S SPECIFICATIONS
-
VERIFY THERMOSTAT SETTINGS AND CYCLE CHILLER TO VERIFY PROPER SEQUENCE OF OPERATION UPON COMPLETION
-
START AND RUN SYSTEM UNDER LOAD
-
INSTALL CORRECT LABELS