Information
-
CSA
-
Audit Title
-
Address
-
Conducted on
-
Auditor Name
- Phil Metcalfe
- Garry Killgour
- Daniel Samuel
- Tony Seddon
- Eman Chougle
- James Campbell
- Jack Findlay
-
Job Source
-
Audit Results: P = Pass
R = Fail - Rework required
N = Fail - No rework required
C = Fail - Corrected during audit
1.000 Design
-
1.001 All up-dated documentation lodged in I-tools?
-
1.007 Build standards applied in design?
-
1.022 Billed tasks actually done?
-
Comments
-
Evidence
2.000 Handover & Collateral Delivered to Chorus
-
2.001 Handover procedure followed, WATCH form applied & correct?
-
2.006 Work plan/H&S/ technical procedure/PTTN approved/ access card current?
-
2.009 Bearer connectivity confirmed 'end to end'?
-
2.015 OTDR traces (fibres @ 1310 & 1550nm wavelength)/ Birth certificates confirmed/delivered to Chorus?
-
2.019 All network items comply with CNSP? No non-approved items used?
-
2.022 CPA (cable plant alteration) forms completed & correct?
-
Comments
-
Evidence
6.000 Work Areas & Safety
-
6.001 Personal and site safety procedures observed?
-
6.002 Hazards identified & recorded - worksite audit form completed/ hazard notices in place?
-
6.008 Network security correct (exchange)?
-
6.013 Latest version of relevant standards & practices docs held by subcontractor or field tech?
-
6.014 Any defects to existing network o/s of scope of project referred for rectification (DRF form)?
-
Is the site active? (Describe works if yes)
-
Is the site safe?
-
Comments
-
Evidence
7.000 Exchange Equipment
-
7.001 Equipment positioned/installed correctly, ventilation unimpeded?
-
7.002 Equipment anchored/mounted compliant with seismic needs?
-
7.004 Equipment & racks labelled correctly, node name visible?
-
7.009 Cable tray earthing & isolation correct?
-
7.010 Cable type, size & labelling correct, install neat & tidy?
-
7.011 Cable & jumper terminations tidy & to required standard?
-
7.017 Trunking manages fibre within limits, drop off's OK, flexitube anchored, fibre slack managed?
-
7.018 Fire & smoke stopping around access points to standard?
-
7.023 GPON installed into Access OFDF (GR3) rack?
-
7.024 GPON GR3 rack electrically isolated & earthed?
-
7.025 GPON GR3 rack - fibre cords RHS, electrical LHS?
-
7.026 All optical connectors APC type?
-
Comments
-
Evidence
11.000 OFDF & Exchange Fibre
-
11.001 All optical cables supported 100% on horizontal & managed on vertical? (No more than 400mm cable to be unsupported)
-
11.002 OFDF hardware secure (draws, troughs, guides, racks)?
-
11.003 Network labelling (OFDF designation, jumper to/from label, data card in I, Q & L draws) correct?
-
11.004 Optical cables & cords adequately managed within racks & shelves?
-
11.005 OFDF SFO tray not overfilled (<1.5mtr tails)?
-
11.007 30mm bending radius unconditionally observed at all locations?
-
11.008 Fibre pigtail label records from OFDF, ID & SFO number correct?
-
11.008 Fibre pigtail label records from OFDF, ID & SFO number correct?
-
11.009 Trunking manages fibre within limits, drop off's OK, flexitube anchored, fibre slack managed?
-
11.010 Protective caps on all unterminated connectors?
-
11.011 Connectors cleaned & verified with Fibre Inspection Probe?
-
11.012 Laser Safety labels (1M Safety) at OFDF (inside & front panel) applied?
-
11.013 No fibre or task waste, all optical (glass) ends safely contained?
-
11.014 Access OFDF patchcords routed within mandrels - excess length stored at AOFDF end?
-
Comments
-
Evidence
13.000 Cable Haul
-
13.001 Correct cable installed as per project pack?
-
13.008 Correct methodology used to blow/suck cables?
-
13.016 All cable ends sealed with h/shrink, coiled/secured ready for use?
-
13.022 Fibre cable management tidy to loop brackets?
-
13.026 ADSS anchor clamp/dead end grip terminated correctly?
-
13.027 ADSS cable correct tension?
-
13.028 ADSS cable down pole secured correctly?<br>
-
13.029 ADSS - threaded rods protected with zinc paint?<br>
-
13.030 ADSS cable on lower section of pole protected with steel cover?<br>
-
Comments
-
Evidence
15.000 Cable & Duct Lay
-
15.002 Ducts laid/drilled between 450mm & 1000mm in f/way?
-
15.003 Ducts laid/drilled between 650mm & 1000mm in r/way?
-
15.005 Route position correct & according to plan?
-
15.006 Correct cables identified & installed?
-
15.007 Cable ends sealed with appropriate h/ shrink?
-
15.016 Fibre locate wire installed as req'd? (If hauled thru empty duct)
-
15.026 Duct at customer boundary sealed, buried or housed in appropriate enclosure?
-
Comments
-
Evidence
16.000 Microduct directional Drill & Lay
-
16.002 Microducts laid/drilled between 450mm & 1000mm in f/way?
-
16.003 Microducts laid/drilled between 650mm & 1000mm in r/way?
-
16.006 Route position correct & according to plan?
-
16.007 Microduct ends sealed with appropriate h/ shrink?
-
16.008 Microduct at customer boundary sealed, buried or housed in appropriate enclosure?
-
16.010 Microduct joints to standard (approved enclosure, correct connectors, earth continuity, water tight etc)?
-
16.015 DB Microduct laid/drilled from cabinet out?
-
16.016 DB Microduct not thru manhole (can be ended in MH for future use)?
-
16.026 Microduct labelled correctly?
-
16.027 Locate peg installed at buried lateral position?
-
Comments
-
Evidence
17.000 Manhole, Joint Chamber & Ducts (new & existing)
-
17.002 Manhole sited correctly, to plan & parallel to boundary?
-
17.003 Manhole correctly sized as per design spec?
-
17.004 Manhole frames flush to ground, no trip hazard?
-
17.005 Manhole stripped of formwork, no protruding nails left?
-
17.006 Manhole throat (where fitted) correct diameter & does not obstruct access?
-
17.011 Non concrete chamber duct entry protrudes into chamber 50mm, reamed and sealed to wall?
-
17.012 Manhole cable management brackets installed?
-
17.013 Manhole cable management arms installed as req'd?
-
17.014 Manhole/chamber lids are locked, in working order & rubber bung fitted?
-
17.015 Ducts positioned close to adjacent wall for cable management?
-
17.016 Ducts sealed where necessary to prevent ingress of water/gas/pests into buildings/cabinets?
-
17.022/23/24 Direct fibre feed hauling tape installed/secured/labelled?
-
Comments
-
Evidence
18.000 Manhole Cable Management
-
18.001 All cables managed tidily on brackets & arms?
-
18.003 Fibre cable protection as req'd treadplate/split duct/bandit tape installed?
19.000 Fibre Jointing & Closure
-
19.001 Joint closure secured on manufacturers bracket & arms?
-
19.002 NetMAP label on closure & each cable tail?
-
19.003 Laser safety label (starburst) visible on closure?
-
19.004 Heat shrink fittings installed correctly (thermal paint change, glue exuding)?
-
19.005 Mechanical closure fittings correct?
-
19.007 Non metallic strength member anchored/isolated?
-
19.008 Unused tubes controlled/managed/secured without stress?
-
19.009 Tubes secured onto organiser trays with metal tabbed cable ties, trays not overfilled?
-
19.010 30mm bending radius unconditionally observed at all locations?
-
19.011 No fibre or task waste, optical (glass) ends safely contained?
-
Comments
-
Evidence
25.000 Poles
-
25.003 Pole in good condition, no splits/burs?
-
25.004 Pole manufacture label in place?
-
25.007 All new poles have network pole tag installed 3.0m above ground?
-
25.010 Pole safe to climb (hammer/probe/dig)?
-
25.014 Unsafe poles labelled/marked for replacement within seven days?
-
25.015 Unsafe poles noted in Hazard Pole Register?
-
Comments
-
Evidence
39.000 Aerial Terminal/OFDC
-
39.001 Correct terminal used?
-
39.002 Terminal mounted & secured correctly?
-
39.004 Terminal lid secured?
-
39.013 Terminal labelled correctly?
-
39.014 Terminal on correct pole face?
-
39.015 Flexi pipe secured directly below terminal (galv saddle or bandit tape)?
-
39.017 20mm or 32mm conduit secured to pole correctly?
-
39.019 Protective cable casing installed as req'd?
-
39.021 Away side tubes taped & secured to avoid leakage/fibre hazard?
-
39.023 Correct orientation of LC/APC connectors?
-
39.024 Fibre 1 pigtail connector bottom RHS (inverted position)?
-
39.025 Blanking rods installed in unused ports of gel block?
-
39.026 Bottom end of tray assembly secured in closure?
-
39.027 Cover wedge secured to tray assembly?
-
39.028 Protective cover over fibre storage/splice area?
-
39.029 Closure lid secure, stingray tail removed? (this is to allow for cordless drill socket or ratchet spanner application)
-
39.030 48f secured with foam strips & metal tab ties?
-
39.031 FOPT manages fibre into splice tray, secured?
-
39.033 Feeder side cable critchley labelled 'FEED'?
-
39.034 Fibre strength member & outer sheath secured to bracket?
-
Comments
-
Evidence
41.000 BDD Terminal
-
41.001 Pit lids secured/locked with bung fitted where appropriate?
-
41.002 Pit installed correctly & to standards?
42.000 Pedestal
-
42.001 Pedestal vertical, firm & at right depth?<br>42.003 Lid secure?
-
42.002 Correct sized pedestal used?
-
42.004 Pedestal labelled correctly?
-
42.008 Foam bung fitted/ in correct position?
-
42.015 Micro duct sheath opening 50mm above bung?
-
42.019 Plastic bags secured, separate bags for loop/cable end/ u/g leads?
-
42. 020 Have best endeavours been done for MINEX standards?
-
42. 025 Starter pipe (s) installed to facilitate NGA provisioning?
68.000 Fibre Access Terminal
-
68.001 Entry tubes sealed?
-
68.002 Two fibres per tray only?
-
68.005 Tube holder installed?
-
68.007 Silica gel pack installed/replaced?
-
68.008 Triangle symbols on dome & base match?
-
68.009 All latches are closed?
-
68.0010 O-ring installed correctly?
-
68.0011 Fibre correctly managed within FAT & trays?
-
68.0013 Slack managed in fibre management coil (1.5 - 2.0m)?
-
68.0014 Swing arm & bracket in working order?
-
68.0016 30mm bending radius observed at all locations?
-
68.0018 Heat shrink splice protectors secured from movement?
-
68.0019 No fibre or task waste?
-
68.0020 FAT labelled correctly?
-
68.0021 Fibre strain relief installed correctly?
-
68.0022 FAT in manhole suitably placed for provisioning?
-
68.0023 FATs installed as per design?
-
68.0023 FATs installed as per design?
-
68.024 Fibre cables labelled correctly?
-
68.029 Gel seal installed in correct FAT port or similar?
-
Comments
-
Evidence
72.000 Reinstatement
-
72.001 Property damage made good?
-
72.002 Ground reinstatement completed around poles?
-
72.005 Cabinet ground reinstatement completed?
-
72.006 All concrete/seal reinstatement to standards?
-
72.008 Reinstatement complete around pedestal?
-
72.009 Reinstatement complete around hand hole?
-
72.011 Reinstatement complete around cable haul (where appropriate)?
-
72.012 Reinstatement complete around GLC?
-
72.013 Reinstatement complete around Channel pit?
-
72.014 Any road markings damaged by works are restored?
-
72.015 Topsoil good, no clay or stones visible?
-
72.023 Ground reinstatement completed around manholes?
-
All temporary service mark-out locations removed?
-
Comments
-
Evidence
73.000 Site Tidy
-
Site tidy, no task waste - <br>73.001 - Poles<br>73.002 - Cabinet internal<br>73.003 - Aerial terminal<br>73.004 - Pillar terminal<br>73.005 - BDD terminal<br>73.006 - PDS terminal <br>73.012 - Cabinet external<br>73.013 - Hand holes<br>73.014 - Cable haul<br>73.015 - GLC<br>73.016 - Channel pit<br>
-
Comments
-
Evidence
74.000 Hand Holes
-
74.001 Bedding done correctly & compacted?
-
74.002 Lock facing to customer boundary & openable?
-
74.003 Starter pipe (s) installed for NGA provisioning?
-
74.004 Flush with ground?
-
74.005 Laterals enter hand hole from the side?
-
74.006 Ribbonet ducts one turn only, sealed & labelled?
-
74.007 Hand hole locked?
-
74.008 Lid free from concrete/seal?
-
74.009 Sited correctly (close to bdy, foot traffic only)?
-
74.011 Maximum of four single way ribbonet's installed?
-
74.014 Bend radius observed, no kinks?
-
74.016 Correct join between lateral & service leadin?
-
Comments
-
Evidence
77.000 UFB Channel Flash 9 Installation
-
77.001 50mm black sheath past outer green sheath?
-
77.002 Electrical tape applied over earth connection on ribbonet?
-
77.003 Earth wire managed & secured to pit wall?
-
77.006 Micro duct tubes routed correctly (bend radius not exceeded)?
-
77.007 All micro ducts labelled?
-
77.008 Joints secured to wall with Velcro ties?
-
77.009 S/Steel locking collar on closure secured with locking bolt?
-
77.010 Closure ID facing upwards?
-
77.011 Correct microduct connectors used (5mm & 12mm)?
-
77.012 Correct sized gas blocks installed on fibre cables?
-
77.013 All spare 12mm microducts capped with duct end caps?
-
77.014 All 52x5mm microducts sealed with strain relief plugs?
-
77.016 Incoming/outgoing cables in correct 12mm tubes?
-
77.017 Closure base 'O' ring clean/dry/undamaged/seated correctly?
-
77.018 Spare 'O' ring in PE bag inside closure?
-
77.019 Pit lid free of reinstatement materials?
-
77.020 All 5mm microducts trimmed to 80mm height from base?
-
77.021 All 12mm microducts trimmed to 40mm height from base?
-
77.022 Lid closure labelled correctly with NetMAP ID?
-
77.023 Microducts. correctly labelled with NetMAP elements?
-
77.024 Spiral wrap buffer tube protection installed?
-
77.025 Metal lock zip tie securing fibres at base of organiser tray?
-
77.026 All fibres laid up in correct trays?
-
77.026 All fibres laid up in correct trays?
-
77.027 SC trays labelled underside of tray with cab ID, distribution fibre designation & fibre numbers - P touch labels used?
-
77.029 Joint bundle wrapped in eziwrap or A3-250 clear plastic/secured?
-
77.030 SE trays labelled underside of tray with cable ID, distribution fibre designation & fibre numbers - P touch labels used?
-
77.031 Spiral wrap fan-out cord protection installed?
-
77.032 Splitter installed on correct tray?
-
77.033 Splitter fibre splice secured in splice holder?
-
77.034 Figure 8 grommet port seated correctly in base?
-
77.035 Cable sheath 20mm above grommet?
-
77.036 Feeder fibre on RHS verticals & enters on RHS of oval port?
-
77.037 Feeder fibre labelled 'FEED' with critchley labels?
-
77.038 Cables labelled with section ID's, critchley labels used?
-
77.039 1 - 1.5m of fibre in SC trays? End of fibre in centre section of tray?
-
77.040 Uncut buffer tubes stored between verticals?
-
77.041 If a 48f cable is installed then a 19mm grommet is used?
-
77.041 If a 48f cable is installed then a 19mm grommet is used?
-
77.042 Microducts enter through 3 RH ports (viewed from swing arm)?
-
77.044 100mm duct capped at pole?
-
77.045 Direct buried ADSS protected at pit entry with with 50mm duct?
-
77.046 Cables properly managed in pit, minimum bend radius achieved?
-
77.047 ADSS centre strength element cut to 90mm inside closure?
-
77.048 ADSS centre strength element secured to retention clamp?
-
77.048 ADSS centre strength element secured to retention clamp?
-
77.048 ADSS centre strength element secured to retention clamp?
-
77.049 Correct number of SC trays installed?
-
77.050 Correct number of SE trays installed?
-
77.051 Enclosure support bracket in place?
-
77.052 Tray retention strap in place?
-
77.053 Lid in place on top of SC tray?
-
77.054 Lid in place on top of SE tray?
-
77.056 Red duct end caps in place on tubes 53 & 54?
-
77.058 Testing pigtail spliced in tray at furthest ABFFP?
-
Comments
-
Evidence