Information

  • CSA

  • Audit Title

  • Address
  • Conducted on

  • Auditor Name

  • Job Source

  • Audit Results: P = Pass
    R = Fail - Rework required
    N = Fail - No rework required
    C = Fail - Corrected during audit

1.000 Design

  • 1.001 All up-dated documentation lodged in I-tools?

  • 1.007 Build standards applied in design?

  • 1.022 Billed tasks actually done?

  • Comments

  • Evidence

2.000 Handover & Collateral Delivered to Chorus

  • 2.001 Handover procedure followed, WATCH form applied & correct?

  • 2.006 Work plan/H&S/ technical procedure/PTTN approved/ access card current?

  • 2.009 Bearer connectivity confirmed 'end to end'?

  • 2.015 OTDR traces (fibres @ 1310 & 1550nm wavelength)/ Birth certificates confirmed/delivered to Chorus?

  • 2.019 All network items comply with CNSP? No non-approved items used?

  • 2.022 CPA (cable plant alteration) forms completed & correct?

  • Comments

  • Evidence

6.000 Work Areas & Safety

  • 6.001 Personal and site safety procedures observed?

  • 6.002 Hazards identified & recorded - worksite audit form completed/ hazard notices in place?

  • 6.008 Network security correct (exchange)?

  • 6.013 Latest version of relevant standards & practices docs held by subcontractor or field tech?

  • 6.014 Any defects to existing network o/s of scope of project referred for rectification (DRF form)?

  • Is the site active? (Describe works if yes)

  • Is the site safe?

  • Comments

  • Evidence

7.000 Exchange Equipment

  • 7.001 Equipment positioned/installed correctly, ventilation unimpeded?

  • 7.002 Equipment anchored/mounted compliant with seismic needs?

  • 7.004 Equipment & racks labelled correctly, node name visible?

  • 7.009 Cable tray earthing & isolation correct?

  • 7.010 Cable type, size & labelling correct, install neat & tidy?

  • 7.011 Cable & jumper terminations tidy & to required standard?

  • 7.017 Trunking manages fibre within limits, drop off's OK, flexitube anchored, fibre slack managed?

  • 7.018 Fire & smoke stopping around access points to standard?

  • 7.023 GPON installed into Access OFDF (GR3) rack?

  • 7.024 GPON GR3 rack electrically isolated & earthed?

  • 7.025 GPON GR3 rack - fibre cords RHS, electrical LHS?

  • 7.026 All optical connectors APC type?

  • Comments

  • Evidence

11.000 OFDF & Exchange Fibre

  • 11.001 All optical cables supported 100% on horizontal & managed on vertical? (No more than 400mm cable to be unsupported)

  • 11.002 OFDF hardware secure (draws, troughs, guides, racks)?

  • 11.003 Network labelling (OFDF designation, jumper to/from label, data card in I, Q & L draws) correct?

  • 11.004 Optical cables & cords adequately managed within racks & shelves?

  • 11.005 OFDF SFO tray not overfilled (<1.5mtr tails)?

  • 11.007 30mm bending radius unconditionally observed at all locations?

  • 11.008 Fibre pigtail label records from OFDF, ID & SFO number correct?

  • 11.008 Fibre pigtail label records from OFDF, ID & SFO number correct?

  • 11.009 Trunking manages fibre within limits, drop off's OK, flexitube anchored, fibre slack managed?

  • 11.010 Protective caps on all unterminated connectors?

  • 11.011 Connectors cleaned & verified with Fibre Inspection Probe?

  • 11.012 Laser Safety labels (1M Safety) at OFDF (inside & front panel) applied?

  • 11.013 No fibre or task waste, all optical (glass) ends safely contained?

  • 11.014 Access OFDF patchcords routed within mandrels - excess length stored at AOFDF end?

  • Comments

  • Evidence

13.000 Cable Haul

  • 13.001 Correct cable installed as per project pack?

  • 13.008 Correct methodology used to blow/suck cables?

  • 13.016 All cable ends sealed with h/shrink, coiled/secured ready for use?

  • 13.022 Fibre cable management tidy to loop brackets?

  • 13.026 ADSS anchor clamp/dead end grip terminated correctly?

  • 13.027 ADSS cable correct tension?

  • 13.028 ADSS cable down pole secured correctly?<br>

  • 13.029 ADSS - threaded rods protected with zinc paint?<br>

  • 13.030 ADSS cable on lower section of pole protected with steel cover?<br>

  • Comments

  • Evidence

15.000 Cable & Duct Lay

  • 15.002 Ducts laid/drilled between 450mm & 1000mm in f/way?

  • 15.003 Ducts laid/drilled between 650mm & 1000mm in r/way?

  • 15.005 Route position correct & according to plan?

  • 15.006 Correct cables identified & installed?

  • 15.007 Cable ends sealed with appropriate h/ shrink?

  • 15.016 Fibre locate wire installed as req'd? (If hauled thru empty duct)

  • 15.026 Duct at customer boundary sealed, buried or housed in appropriate enclosure?

  • Comments

  • Evidence

16.000 Microduct directional Drill & Lay

  • 16.002 Microducts laid/drilled between 450mm & 1000mm in f/way?

  • 16.003 Microducts laid/drilled between 650mm & 1000mm in r/way?

  • 16.006 Route position correct & according to plan?

  • 16.007 Microduct ends sealed with appropriate h/ shrink?

  • 16.008 Microduct at customer boundary sealed, buried or housed in appropriate enclosure?

  • 16.010 Microduct joints to standard (approved enclosure, correct connectors, earth continuity, water tight etc)?

  • 16.015 DB Microduct laid/drilled from cabinet out?

  • 16.016 DB Microduct not thru manhole (can be ended in MH for future use)?

  • 16.026 Microduct labelled correctly?

  • 16.027 Locate peg installed at buried lateral position?

  • Comments

  • Evidence

17.000 Manhole, Joint Chamber & Ducts (new & existing)

  • 17.002 Manhole sited correctly, to plan & parallel to boundary?

  • 17.003 Manhole correctly sized as per design spec?

  • 17.004 Manhole frames flush to ground, no trip hazard?

  • 17.005 Manhole stripped of formwork, no protruding nails left?

  • 17.006 Manhole throat (where fitted) correct diameter & does not obstruct access?

  • 17.011 Non concrete chamber duct entry protrudes into chamber 50mm, reamed and sealed to wall?

  • 17.012 Manhole cable management brackets installed?

  • 17.013 Manhole cable management arms installed as req'd?

  • 17.014 Manhole/chamber lids are locked, in working order & rubber bung fitted?

  • 17.015 Ducts positioned close to adjacent wall for cable management?

  • 17.016 Ducts sealed where necessary to prevent ingress of water/gas/pests into buildings/cabinets?

  • 17.022/23/24 Direct fibre feed hauling tape installed/secured/labelled?

  • Comments

  • Evidence

18.000 Manhole Cable Management

  • 18.001 All cables managed tidily on brackets & arms?

  • 18.003 Fibre cable protection as req'd treadplate/split duct/bandit tape installed?

19.000 Fibre Jointing & Closure

  • 19.001 Joint closure secured on manufacturers bracket & arms?

  • 19.002 NetMAP label on closure & each cable tail?

  • 19.003 Laser safety label (starburst) visible on closure?

  • 19.004 Heat shrink fittings installed correctly (thermal paint change, glue exuding)?

  • 19.005 Mechanical closure fittings correct?

  • 19.007 Non metallic strength member anchored/isolated?

  • 19.008 Unused tubes controlled/managed/secured without stress?

  • 19.009 Tubes secured onto organiser trays with metal tabbed cable ties, trays not overfilled?

  • 19.010 30mm bending radius unconditionally observed at all locations?

  • 19.011 No fibre or task waste, optical (glass) ends safely contained?

  • Comments

  • Evidence

25.000 Poles

  • 25.003 Pole in good condition, no splits/burs?

  • 25.004 Pole manufacture label in place?

  • 25.007 All new poles have network pole tag installed 3.0m above ground?

  • 25.010 Pole safe to climb (hammer/probe/dig)?

  • 25.014 Unsafe poles labelled/marked for replacement within seven days?

  • 25.015 Unsafe poles noted in Hazard Pole Register?

  • Comments

  • Evidence

39.000 Aerial Terminal/OFDC

  • 39.001 Correct terminal used?

  • 39.002 Terminal mounted & secured correctly?

  • 39.004 Terminal lid secured?

  • 39.013 Terminal labelled correctly?

  • 39.014 Terminal on correct pole face?

  • 39.015 Flexi pipe secured directly below terminal (galv saddle or bandit tape)?

  • 39.017 20mm or 32mm conduit secured to pole correctly?

  • 39.019 Protective cable casing installed as req'd?

  • 39.021 Away side tubes taped & secured to avoid leakage/fibre hazard?

  • 39.023 Correct orientation of LC/APC connectors?

  • 39.024 Fibre 1 pigtail connector bottom RHS (inverted position)?

  • 39.025 Blanking rods installed in unused ports of gel block?

  • 39.026 Bottom end of tray assembly secured in closure?

  • 39.027 Cover wedge secured to tray assembly?

  • 39.028 Protective cover over fibre storage/splice area?

  • 39.029 Closure lid secure, stingray tail removed? (this is to allow for cordless drill socket or ratchet spanner application)

  • 39.030 48f secured with foam strips & metal tab ties?

  • 39.031 FOPT manages fibre into splice tray, secured?

  • 39.033 Feeder side cable critchley labelled 'FEED'?

  • 39.034 Fibre strength member & outer sheath secured to bracket?

  • Comments

  • Evidence

41.000 BDD Terminal

  • 41.001 Pit lids secured/locked with bung fitted where appropriate?

  • 41.002 Pit installed correctly & to standards?

42.000 Pedestal

  • 42.001 Pedestal vertical, firm & at right depth?<br>42.003 Lid secure?

  • 42.002 Correct sized pedestal used?

  • 42.004 Pedestal labelled correctly?

  • 42.008 Foam bung fitted/ in correct position?

  • 42.015 Micro duct sheath opening 50mm above bung?

  • 42.019 Plastic bags secured, separate bags for loop/cable end/ u/g leads?

  • 42. 020 Have best endeavours been done for MINEX standards?

  • 42. 025 Starter pipe (s) installed to facilitate NGA provisioning?

68.000 Fibre Access Terminal

  • 68.001 Entry tubes sealed?

  • 68.002 Two fibres per tray only?

  • 68.005 Tube holder installed?

  • 68.007 Silica gel pack installed/replaced?

  • 68.008 Triangle symbols on dome & base match?

  • 68.009 All latches are closed?

  • 68.0010 O-ring installed correctly?

  • 68.0011 Fibre correctly managed within FAT & trays?

  • 68.0013 Slack managed in fibre management coil (1.5 - 2.0m)?

  • 68.0014 Swing arm & bracket in working order?

  • 68.0016 30mm bending radius observed at all locations?

  • 68.0018 Heat shrink splice protectors secured from movement?

  • 68.0019 No fibre or task waste?

  • 68.0020 FAT labelled correctly?

  • 68.0021 Fibre strain relief installed correctly?

  • 68.0022 FAT in manhole suitably placed for provisioning?

  • 68.0023 FATs installed as per design?

  • 68.0023 FATs installed as per design?

  • 68.024 Fibre cables labelled correctly?

  • 68.029 Gel seal installed in correct FAT port or similar?

  • Comments

  • Evidence

72.000 Reinstatement

  • 72.001 Property damage made good?

  • 72.002 Ground reinstatement completed around poles?

  • 72.005 Cabinet ground reinstatement completed?

  • 72.006 All concrete/seal reinstatement to standards?

  • 72.008 Reinstatement complete around pedestal?

  • 72.009 Reinstatement complete around hand hole?

  • 72.011 Reinstatement complete around cable haul (where appropriate)?

  • 72.012 Reinstatement complete around GLC?

  • 72.013 Reinstatement complete around Channel pit?

  • 72.014 Any road markings damaged by works are restored?

  • 72.015 Topsoil good, no clay or stones visible?

  • 72.023 Ground reinstatement completed around manholes?

  • All temporary service mark-out locations removed?

  • Comments

  • Evidence

73.000 Site Tidy

  • Site tidy, no task waste - <br>73.001 - Poles<br>73.002 - Cabinet internal<br>73.003 - Aerial terminal<br>73.004 - Pillar terminal<br>73.005 - BDD terminal<br>73.006 - PDS terminal <br>73.012 - Cabinet external<br>73.013 - Hand holes<br>73.014 - Cable haul<br>73.015 - GLC<br>73.016 - Channel pit<br>

  • Comments

  • Evidence

74.000 Hand Holes

  • 74.001 Bedding done correctly & compacted?

  • 74.002 Lock facing to customer boundary & openable?

  • 74.003 Starter pipe (s) installed for NGA provisioning?

  • 74.004 Flush with ground?

  • 74.005 Laterals enter hand hole from the side?

  • 74.006 Ribbonet ducts one turn only, sealed & labelled?

  • 74.007 Hand hole locked?

  • 74.008 Lid free from concrete/seal?

  • 74.009 Sited correctly (close to bdy, foot traffic only)?

  • 74.011 Maximum of four single way ribbonet's installed?

  • 74.014 Bend radius observed, no kinks?

  • 74.016 Correct join between lateral & service leadin?

  • Comments

  • Evidence

77.000 UFB Channel Flash 9 Installation

  • 77.001 50mm black sheath past outer green sheath?

  • 77.002 Electrical tape applied over earth connection on ribbonet?

  • 77.003 Earth wire managed & secured to pit wall?

  • 77.006 Micro duct tubes routed correctly (bend radius not exceeded)?

  • 77.007 All micro ducts labelled?

  • 77.008 Joints secured to wall with Velcro ties?

  • 77.009 S/Steel locking collar on closure secured with locking bolt?

  • 77.010 Closure ID facing upwards?

  • 77.011 Correct microduct connectors used (5mm & 12mm)?

  • 77.012 Correct sized gas blocks installed on fibre cables?

  • 77.013 All spare 12mm microducts capped with duct end caps?

  • 77.014 All 52x5mm microducts sealed with strain relief plugs?

  • 77.016 Incoming/outgoing cables in correct 12mm tubes?

  • 77.017 Closure base 'O' ring clean/dry/undamaged/seated correctly?

  • 77.018 Spare 'O' ring in PE bag inside closure?

  • 77.019 Pit lid free of reinstatement materials?

  • 77.020 All 5mm microducts trimmed to 80mm height from base?

  • 77.021 All 12mm microducts trimmed to 40mm height from base?

  • 77.022 Lid closure labelled correctly with NetMAP ID?

  • 77.023 Microducts. correctly labelled with NetMAP elements?

  • 77.024 Spiral wrap buffer tube protection installed?

  • 77.025 Metal lock zip tie securing fibres at base of organiser tray?

  • 77.026 All fibres laid up in correct trays?

  • 77.026 All fibres laid up in correct trays?

  • 77.027 SC trays labelled underside of tray with cab ID, distribution fibre designation & fibre numbers - P touch labels used?

  • 77.029 Joint bundle wrapped in eziwrap or A3-250 clear plastic/secured?

  • 77.030 SE trays labelled underside of tray with cable ID, distribution fibre designation & fibre numbers - P touch labels used?

  • 77.031 Spiral wrap fan-out cord protection installed?

  • 77.032 Splitter installed on correct tray?

  • 77.033 Splitter fibre splice secured in splice holder?

  • 77.034 Figure 8 grommet port seated correctly in base?

  • 77.035 Cable sheath 20mm above grommet?

  • 77.036 Feeder fibre on RHS verticals & enters on RHS of oval port?

  • 77.037 Feeder fibre labelled 'FEED' with critchley labels?

  • 77.038 Cables labelled with section ID's, critchley labels used?

  • 77.039 1 - 1.5m of fibre in SC trays? End of fibre in centre section of tray?

  • 77.040 Uncut buffer tubes stored between verticals?

  • 77.041 If a 48f cable is installed then a 19mm grommet is used?

  • 77.041 If a 48f cable is installed then a 19mm grommet is used?

  • 77.042 Microducts enter through 3 RH ports (viewed from swing arm)?

  • 77.044 100mm duct capped at pole?

  • 77.045 Direct buried ADSS protected at pit entry with with 50mm duct?

  • 77.046 Cables properly managed in pit, minimum bend radius achieved?

  • 77.047 ADSS centre strength element cut to 90mm inside closure?

  • 77.048 ADSS centre strength element secured to retention clamp?

  • 77.048 ADSS centre strength element secured to retention clamp?

  • 77.048 ADSS centre strength element secured to retention clamp?

  • 77.049 Correct number of SC trays installed?

  • 77.050 Correct number of SE trays installed?

  • 77.051 Enclosure support bracket in place?

  • 77.052 Tray retention strap in place?

  • 77.053 Lid in place on top of SC tray?

  • 77.054 Lid in place on top of SE tray?

  • 77.056 Red duct end caps in place on tubes 53 & 54?

  • 77.058 Testing pigtail spliced in tray at furthest ABFFP?

  • Comments

  • Evidence

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.