Information
-
Document No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
SiteEntry / Boundaries
-
Safety Signs placed
-
Footpath(s) Clear
-
Vehicle movements controlled
-
Traffic Management Plan in Place
-
Public Protection
-
Site Workers, including Contractors / Subcontractors
-
SWMS's / JSA's for Works
-
Controls in Place
-
Other
-
Plant & Equipment (including subcontractors & hire equipment) and lifting objects
-
Pre-Start Checklists completed
-
Plant working within SWL
-
Chains / Slings tested & Tagged (12 months)
-
Crane / Telehandler / other used with Doggers (if app)
-
Workers standing clear of load
-
Safety helment worn within range
-
Excavations, Tenches, Slopes, Abutments & Sump
-
Unattended excavations, trenches, holes, sumps etc, barricaded, flagged or other
-
Benching, battering and/or shoring of trenches over 1.5 metres
-
Helmets worn in / around trench
-
Stockpiles and other materials clearly defined and not obstructing traffic, pedestrians, or vision
-
Stockpiles
-
Pipes and other materials
-
Other
-
Works in vicinity of Overhead and Underground Services adequately protected / controlled
-
Power Lines
-
Other (eg. AC Main / Sewer rising main, other)
-
Power Tools / Electrical
-
Dust Masks & Eye protecion provided & used
-
Tools & Leads tested & Tagged
-
Safe techniques used
-
Guards fitted
-
Hazardous Substances (HS)
-
MSDS provided for each HS entered on register
-
Correct PPE used
-
Compound
-
No Trip hazards
-
General waste removed
-
Fire Extinguishers tagged and tested six montly
-
Electrical Equipment tested and tagged
-
General Items
-
Dust minimised
-
Noise minimised
-
Vibration minimised in close proximity to residents / public
-
First Aid Kit up-to-date
-
Inductions for all workers / drivers
-
All workers wearing PPE
-
Adequate PPE available
-
Incidents reported and investigations conducted
Previously undefined Risk/Hazard
-
Previously undefined Risk/Hazard
-
-
Safety Inspector
-
Site Representative