Information
-
Store Name & Number:
-
Date:
-
Time On Site:
-
Time Off Site:
-
Engineers:
Action
-
RAMS Read & signed
-
Complete Acrelec Pre survey check sheet
1st Fix Checks
-
Locate BT ADSL socket, connect router & ping test
-
Fibre run BOH to FOH
-
Fibres spliced
-
Cat6 run to HS Desk for Acrelec
-
Cat6 terminated for Acrelec kit
-
Cabinet installed
-
Cabinet patched
-
Cabinet labelled
-
Patch cables labelled
-
Patch panel labelled
-
All outlets labelled
-
Fibres run to DT
-
Fibres spliced in DT
-
Cat6 data installed to DT
-
Cat6 data terminated in DT
-
ASDA network Cat5e installed
-
ASDA Cat5 network cables terminated
-
Cat6 cables installed for Tiptel phones
-
Cat6 cables terminated for Tiptel phones
2nd Fix Checks
-
OMS installed
-
OMS commissioned
-
OMS printer installed
-
OMS printer commissioned
-
OMS speakers installed
-
FOH Kiosk installed
-
FOH kiosk commissioned
-
ORB Screen installed
-
ORB Player installed
-
ORB Player commissioned
-
Install DT Kiosk/s
-
DT Kiosk/s commissioned
-
Tiptel phones commissioned
-
Induction loop/s cables connected
-
All Teamviewer ID's captured and recorded below
-
All serial numbers captured and recorded below
ASDA Hardware Installation Checks
-
ASDA AXP installed
-
ASDA Base Station installed
-
ASDA Thin Client installed
-
ASDA Phones installed
-
ASDA Printer installed
Job Complete Check & Sign Off
-
EPS completed and details recorded below
-
Drawing marked showing cable routes
-
Complete Acrelec System Sign Off Form, including Teamviewer ID's and serial numbers
-
Complete Photo & Information Check Sheet, including patching schedule & testing cables
-
Client sign off
-
Client position
-
Engineer Sign Off