Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Closing Tasks
START OF SHIFT
-
CHECK RICE, CHICKEN, AND BEEF (COOK IF NEEDED) - ASSESS SPITS, DO YOU HAVE ENOUGH FOR DINNER RUSH?
-
ENSURE LINE IS STOCKED & SET UP 4 SUCCESS (TOPPINGS, SALAD, SAUCES ETC.)
-
DISCUSS RUSH PLAN (POSITIONS\STATIONS) - DIVIDE SHIFT DUTIES AND RESPONSIBILITIES
-
ASSIGN ANY DEEP CLEANING OR ADDITIONAL DUTIES FOR THE NIGHT
-
DO TEMP CHECKS – BEFORE 5PM (HOW DOES THE FOOD LOOK/TASTE?)
DURING THE SHIFT
-
SERVICE LINES CLEAN, DISHES WASHED, FLOORS SWEPT & TABLES/WASHROOMS CHECKED (CLEANED IF NEC.)
-
REFILL SAUCES BOTTLES & ALL SAJ DOUGH TRAYS (ENSURING F.I.F.O. IS BEING FOLLOWED)
END OF SHIFT DUTIES
END OF NIGHT PROCEDURE PROTEIN / COOLING HOT FOODS
-
Approx.2 HOURS BEFORE CLOSE ASSESS YOUR PROTEIN. 1/3 SKEWER OR LESS CONTINUE TO SHAVE IT ALL DOWN. MORE THAN 1/3 SHAVE WHAT YOU NEED TO LAST THE REMAINDER OF THE SHIFT
-
COOLING SKEWERS - REMOVE FROM HEAT AND PLACE DIRECTLY IN THE FREEZER. WRAP WITH PLASTIC WRAP AFTER 30 MINS.
-
COOLING SHAVED PROTEIN - REMOVE SHAVED PROTEIN FROM THE HOT WELL AND HOT HOLD UNIT AND PLACE DIRECTLY INTO THE WALK IN COOLER WITH THE LID OFF. STIR EVERY 5-10 MINS FOR 30 MINS.
-
AFTER 30 MINS IN THE WALK IN COOLER COVER PROTEIN BINS WITH PLASTIC WRAP AND A LID
-
COOLING RICE - REMOVE RICE FROM THE HOT WELL AND HOT HOLD UNIT AND PLACE DIRECTLY INTO THE WALK IN COOLER WITH THE LID OFF. STIR EVERY 5-10 MINS FOR 30 MINS.
-
AFTER 30 MINS IN THE WALK IN COOLER COVER RICE BINS WITH PLASTIC WRAP AND A LID
-
SHUT OFF SHAWARMA MACHINES, FRYERS, SAJ DOME, SAJ BREAD PRESS, HOT TABLE, HOT HOLD CABINET, OVEN, TOASTER, AND FRY LAMP
-
FULLY SCRAPE SAJ PRESS (TOP & BOTTOM), WIPE DOME & ALL STAINLESS AROUND PRESS (CORRUGATED AND TABLE)
-
REFILL ALL EMPTY SAUCE & TOPPING INSERTS, WIPE THE FRIDGE
-
REMOVE INSERTS, WIPE ALL STAINLESS AND INSERT EDGES, REPLACE INSERTS, WIPE THE FRIDGE (DOOR + INSIDE)
-
TURN OFF FRYERS, TAKE OUT FILTERS, CLEAN OIL, WIPE FRYERS (TOPS & SIDES)
-
CLEAN SHAWARMA MACHINES (TOP, UNDER, GRILL WIRE ETC.), FLAT TOP
-
SCRAPE TOASTER – ALL RESIDUE REMOVED, WIPED CLEAN (INCL. UNDERNEATH)
-
CLEAN & SANITIZE POS STATION (STAINLESS, PAY TERMINAL ETC.), KIOSKS, 3RD PARTY & KDS SCREENS
-
WIPE ALL TABLES, CHAIRS, WINDOW EDGES, GARBAGE BINS, ORANGE CORRUGATED & TAKE OUT RACK
-
TAKE WASHROOM CLEANING MATERIALS, CLEAN TOILET, WALLS, SINK & MIRROR, TURN LIGHTS OFF
-
SWEEP & HOT MOP ENTRANCE, WASHROOMS, DINING AREA, COOK LINE (CLEAN MOP HEAD)
-
CHANGE ALL THE GARBAGES, LINE WITH NEW BAGS, TAKE ALL GARBAGE & RECYCLING OUT TO BIN
-
WASH ALL DISHES, FULLY SCRAPE ALL SINKS (INSIDE/OUTSIDE), WALLS, PIPES, SPRAYER, CHEM. DISPENSER ETC
-
CLEAN PREP TABLE/AREA, WALLS, SHELVES ETC. (UNDERNEATH CONTAINERS ETC.)
-
CLEAN & ORGANIZE FRIDGE\FREEZER (INSIDE/DOORS ETC.)
-
ALL TOOLS PUT AWAY AND COMPLETE ORGANIZATION OF STORAGE, PREP & DISH AREA
-
SWEEP PREP AREA (CORNERS, UNDER ALL SHELVES/TABLES), HOT MOP PREP AREA (HANG DRY MOP HEAD)
-
ALL EQUIPMENT OFF?? ENSURE ALL EQUIPMENT IS OFF (DOME, PRESS, FRYERS, FLAT TOP, TOWERS ETC.)
-
ENSURE RESTAURANT IS SET UP FOR NEXT DAY'S BUSINESS
-
COMPLETE END OF DAY PROCESS ON POS